manualshive.com logo in svg
background image

Industrial Contractors’ Supplies, Inc.

- Dust Control Division -

15061 Route 30, N. Huntingdon, PA  15642
Phone: 412 . 824 . 6933

Fax: 412 . 824 . 4704

         www.ICScompany.net

INDUSTRIAL POWER BLOWER

OPERATIONS MANUAL 

Introduction

 

INDUSTRIAL CONTRACTORS SUPPLIES is a leading distributor of products and 

accessories for environmental management in construction, industry and facility
maintenance applications.

With the invention of the Dust Director

®

, a dust control guard for handheld angle grinders

that prevents silica dust from becoming airborne while providing the operator with complete
visibility of the blade and cutting surface, ICS has since established ourselves as a leader and
innovator in the air movement and dust control industry.

About This Manual

This manual is produced solely for the use of  purchasers and operators of our Industrial
Power Blowers and Accessories.  The intent of this manual is to provide the owner/operator of
our products general and specific information regarding the safe and proper operation and
maintenance of the equipment described within. 

Contact

  

If after careful review, any questions arise concerning any portion of this manual,

contact INDUSTRIAL CONTRACTORS SUPPLIES for assistance at:

INDUSTRIAL CONTRACTORS SUPPLIES, INC.  

Phone:  (412) 824-6933 

15061 Route 30, N. Huntingdon, PA 15642 

FAX:  (412) 824-4704 

E-MAIL:  

[email protected]

 

WEB SITE:  

www.ICScompany.net 

-1-

Содержание EBS-16

Страница 1: ...lade and cutting surface ICS has since established ourselves as a leader and innovator in the air movement and dust control industry About This Manual This manual is produced solely for the use of pur...

Страница 2: ...ic blower If such defects occur this warranty is void if service is attempted by non Authorized Service Depots Power Blower Data 4 Power Blower Electrical Information 5 OPERATION Operating Procedures...

Страница 3: ...make sure the tank cap is closed properly and secured If any fuel is spilled make sure the area is dry before starting the engine 10 Never operate gasoline powered blowers in an enclosed or confined...

Страница 4: ...ectric motors are single phase 60 Hz rigid base 56 frame with ball and bearings and manual reset overload protection ELECTRIC UNITS ENGINE HP CFM S B RPM WIDTH DEPTH HEIGHT LBS EBS 16 ELECTRIC 1 3 TEF...

Страница 5: ...ntilation of the entire structure For additional information on how to accomplish PPV refer to PPV Set Up Procedures in this Manual Note The Industrial Power Blower is the most efficient tool for PPV...

Страница 6: ...belt 1 Remove the eight bolts holding the front grill in place and remove the grill Figure 4 1 2 Loosen the four front engine mount bolts Figure 4 2 3 Use a lever to pry or push the engine downward to...

Страница 7: ...into the adjoining threaded holes in the bushing Figure 4 6 Turn the screws in a clockwise manner Tighten the cap screws progressively with the wrench Evenly tighten each cap screw to a turn successiv...

Страница 8: ...two bolts drawing the bushing and hub together 4 Slide the blade onto the bushing hub assembly and insert the three screws through the blade and turn evenly but do not tighten Make sure blade is in li...

Страница 9: ...igure 5 1 If the blower is too close to the opening the opening will not be completely covered by pressurized air If the blower is too far from the opening pressurized air will strike the building aro...

Страница 10: ...r combined ability to cover the larger opening with pressurized air The size of the opening dictates the numbers of blowers necessary to cover the opening with combined cones of pressurized air Rememb...

Страница 11: ...s dependent on direction and velocity As in any ventilation operation maximum efficiency can be obtained by using the prevailing wind direction to advantage by pressurizing the structure on the windwa...

Отзывы: