ICP DAS, ZT-2570/ZT-2571 User Manual, Version 1.3
Page 45
Copyright @ 2013 by ICP DAS Co., Ltd. All Rights Reserved.
4.6
Test Communications
When all the configuration set-up completed, please turn the DIP switch to
“
ZBRUN
”
position and reboot module.
Next, please confirm the
“
ZB Net
”
LED indicator of ZigBee salves whether is
steady lighted or not. If the status of green LED indicator is steady lighted, it
means the connection has established and user can start using Ethernet or serial
port to do communication.
ZBSET/ZBRUN/ZBINIT
ZB Net
ZB PWR
ГК
Атлант
Инжиниринг
–
официальный
представитель
в
РФ
и
СНГ
+7(495)109-02-08 [email protected] www.bbrc.ru