ICP DAS, ZT-2018/S Quick Start, Version 1.0.0
Page 1
Copyright
©
2013 by ICP DAS Co., Ltd. All Rights Reserved.
ZT-2018/S
Quick Start
1
What’s in the Shipping Package?
The shipping package showed contain the following items:
2
Preparing the Device
1.
Refer to Section 4. for details of how to configure the DIP switches of the ZT-2000 I/O
device.
2.
Install the ZT Configuration Utility on your Host PC to configure the ZT-2000
coordinator. The utility can be founded on the CD in the
\
Napdos
\
ZigBee
\
ZT_Series
\
Utility folder, or downloaded from:
http://ftp.icpdas.com/pub/cd/usbcd/napdos/zigbee/zt_series/utility
3.
Power Supply: Connect a power supply using a voltage range of +10
~
+30 V
DC
CD
ANT-124-05
Quick Start
ZT-2018/S
Device
CN-1824
+Vs
GND
+Vs
GND
If any of these items are missing or damaged, please contact your local distributor for more
information. Save the shipping materials and cartons in case you need to ship the module in the
future.