background image

P7 

5

 

Boot Steps 

 

A.

 

Please confirm the Power cable and CT is locked into the module, and “Ext_Bus” 
is connected an extension module by audio line. (If there is no extension module, 
the “Ext_Bus” don’t be connected.)   

B.

 

Adjusting DIP switch and set the parameter of communication, and switch “PWR” 
to OFF. And then switch “PWR” to ON after press “Wake” and “F3” buttons for 5 
seconds.   

C.

 

When  power  on,  if  “STA”  will  light  on  for  1  second  and  off,  this  mean  boot 
complete.  If  “STA”  do  not  be  lighted,  please  press  “Boot” for  1~3  seconds,  and 
confirm  “STA”  will  light  on  for  1  second  and  off.  Finally,  press  “Wake”  once, 
confirm “STA” blink once to complete the boot. 

D.

 

Connect the CT to the cable to be measured. The buckle has no directionality, but 
after the buckle, you must confirm that the opening is completely closed. 

 

A

 

B

 

D

 

Before the CT 

be buckled 

 

After the CT 

be buckled 

 

Confirm the opening is 

completely closed 

 

C  

Содержание iWSN-1210X

Страница 1: ...o this guide the package includes the following items iWSN 1210X Screw Driver Technical Support service icpdas com www icpdas com Resources How to search for drivers manuals and spec information on IC...

Страница 2: ...able product Product Warranty Customer Support ICP DAS warrants all products free from defects in material and workmanship for a period of one year from the date of shipping During the warranty period...

Страница 3: ...er off Pin Name Instructions 4 VDC 10 30 VDC 3 GND Ground 2 CT Split core CT pin no directionality support measuring and charging function 1 CT Extension bus Instructions Ext_Bus Empty or connect exte...

Страница 4: ...ication parameter Name Instructions F2 Reserved F1 TX Duty RF transmit duty ON OFF Period Pin 5 6 1 sec 10 sec 30 sec 60 sec RF Ch RF Channel ON OFF Ch Pin Ch Pin 1 2 3 4 1 2 3 4 0 8 1 9 2 A 3 B 4 C 5...

Страница 5: ...nstructions PA Factory Only GID Group ID ON OFF Group Pin 6 7 0 1 2 3 Node ID ON OFF Node Pin Node Pin 1 2 3 4 5 1 2 3 4 5 0 16 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 12 28 13 29 14...

Страница 6: ...se confirm whether the audio line of Ext_Bus is fully inserted and the module is power off And power on after press Wake and F3 buttons for 5 seconds 1 If have any questions please contact technology...

Страница 7: ...3 buttons for 5 seconds C When power on if STA will light on for 1 second and off this mean boot complete If STA do not be lighted please press Boot for 1 3 seconds and confirm STA will light on for 1...

Страница 8: ...only supports CT sold by ICPDAS 4 To install CT s correctly please ensure the CT lines sequences is right before clip the CT s onto the power cable of the monitoring equipment 5 Please select the appr...

Отзывы: