
Getting Started: I-8437-80/8837-80/8417/8817, Jul 2020 V4.0 45
2.5
Step 5 - Download & Debugging the Example Project
To begin this process, please install the hardware as below.
Note: The I-8xx7 shipping box includes one RS-232 cable that can be used to connect both
COM1 (or COM2) of the PC and COM1 of the PAC.
Click the
“
Link Setup
”
button in the
“
ISaGRAF Programs
”
window.
In the "PC-PLC Link parameters" window, set the communication parameters properly.
NET-ID of the PAC
(refer to Section 3.1)
COM port of the PC.
Click the Setup button to set
communication parameters
Using the same parameters with the PAC. The
default setting is 19200, N, 8, 1, No flow control.
1.
2.
3.
4.
Содержание I-8417-80
Страница 70: ...Getting Started I 8437 80 8837 80 8417 8817 Jul 2020 V2 0 70 3 19 Pin Assignment of Communication Ports ...
Страница 71: ...Getting Started I 8437 80 8837 80 8417 8817 Jul 2020 V2 0 71 3 20 Dimension 8 Slots ...
Страница 72: ...Getting Started I 8437 80 8837 80 8417 8817 Jul 2020 V2 0 72 4 Slots ...