![Icom IC-M323 Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/icom/ic-m323/ic-m323_instruction-manual_612763054.webp)
44
7
DSC OPERATION
■
Making DSC calls
Making a Test Acknowledgement call (continued)
D
Manual ACK:
Enter “TEST ACK” in the DSC CALLS menu.
q
• If no Test call is received, the Test ACK item will not be dis-
played.
• Push [EXIT] to return to the normal operating mode.
• Push [BACK] to return to the previous screen.
Select a desired Test call to reply to, using Dial or [
w
Y
]/[
Z
],
then push Dial or [ENT].
The Test ACK confirmation screen is displayed.
e
Push [CALL] to make an acknowledgement call.
While transmitting the acknowledgement call, the screen
r
shown below is displayed, and then returns to the normal
operating mode.
MENU
➪
DSC Calls
➪
Test ACK
(Push [MENU].) (Rotate Dial, then push [ENT].)
Содержание IC-M323
Страница 96: ......