There are some thermostats which can interfere with the way the ICM furnace boards sense the call for heat. If you are having any issues with establishing 

flame, the first step would be to remove all the thermostat wires from the board and temporarily jump R – W to test. If the furnace cycle completes, remove 

the jumper, and replace the existing thermostat with a battery-operated thermostat or a hardwired thermostat which uses a R & C connection.

Weak or intermittent spark

Make sure the furnace frame is grounded to earth ground. Ensure the common of the 24 VAC is grounded to Earth ground. Check or replace the spark 

igniter. Check the primary and secondary voltage of the transformer for proper voltage.

Flame Loss 

• Check for bad or dirty flame sensor 

• Check thermostat (bypass for testing)

• Check for proper flame sense signal at flame sense test pins

• Check for proper earth ground on furnace. 

• 4 flame losses in a single heat call will put the control into a one-hour lockout.

No flame/Ignition failure

If the flame is not established and proven during the initial sequence, there will be two more successive attempts allowed each having a sixty second 

inducer purge between attempts. After three successive attempts if the flame is still not proven, there will be a 1 hour lock out before the system will try for 
ignition again.

• Check the thermostat (bypass for testing)

• Check the pressure switch 

• Check gas valve operation

• Check for good spark & check for good earth ground

Flame out of sequence

Flame out of sequence represents a scenario where flame is sensed while the gas valve is closed.  The control goes into a lockout state when flame is out 
of sequence and the indicator LED blinks the appropriate code (see “lockout” section).

• Check and replace flame sensor

Furnace does not ignite and main blower runs 

continuously

Check the high temperature limit switch for open circuit.  Check all safeties. Clean or replace air filter. Check duct work and return air ducts for blockages.

TROUBLESHOOTING

B

24 VAC common

C

24 VAC common

ECM

Electonically commutated motor

F1

Fuse 

FS

Flame sensor 

GND

Ground

GV

Gas valve

IDM

Induced draft motor

K1, K2 Gas valve relays

LIM

Limit switch

PRI

Transformer primary

PS

Pressure switch

R

24 VAC

ROS

Roll out switch

SEC

Transformer secondary

TH

Transformer 24 VAC hot

TR

Transformer 24 VAC common

  1. N/A

  2.  Gas valve

  3.  Pressure switch in

  4.  Flame sensor

  5. N/A

  6.  Fusible link (Roll out switch)

  7.  Common  (24 VAC), B

  8.  Limit switch (out)

  9.  Limit switch (in)

LEGEND

9-PIN CONNECTION

B

24 VAC common

C

24 VAC common

ECM
F1

Fuse 

FS

Flame sensor 

GND

Ground

GV

Gas valve

IDM

Induced draft motor

N/A

K1, K2 Gas valve relays

LIM

Limit switch

PRI

Transformer primary

PS

Pressure switch

R

24 VAC

ROS

Roll out switch

SEC

Transformer secondary

TH

Transformer 24 VAC hot

TR

Transformer 24 VAC common

  1. N/A

  2.  Gas valve

  3.  Pressure switch in

  4.  Flame sensor

  5. N/A

  6.  Fusible link (Roll out switch)

  7.  Common  (24 VAC), B

  8.  Limit switch (out)

  9.  Limit switch (in)

LEGEND

9-PIN CONNECTION

B

24 VAC common

C

24 VAC common

ECM

Electonically commutated motor

F1

Fuse 

FS

Flame sensor 

GND

Ground

GV

Gas valve

IDM

Induced draft motor

K1, K2 Gas valve relays

LIM

Limit switch

PRI

Transformer primary

PS

Pressure switch

R

24 VAC

ROS

Roll out switch

SEC

Transformer secondary

TH

Transformer 24 VAC hot

TR

Transformer 24 VAC common

  1. N/A

  2.  Gas valve

  3.  Pressure switch in

  4.  Flame sensor

  5. N/A

  6.  Fusible link (Roll out switch)

  7.  Common  (24 VAC), B

  8.  Limit switch (out)

  9.  Limit switch (in)

LEGEND

9-PIN CONNECTION

B

24 VAC common

C

24 VAC common

ECM

Electonically commuted motor

F1

Fuse 

FS

Flame sensor 

GND

Ground

GV

Gas valve

IDM

Induced draft motor

K1, K2, K3 Gas valve relays

LIM

Limit switch

PRI

Transformer primary

PS

Pressure switch

R

24 VAC

ROS

Roll out switch

SEC

Transformer secondary

TH

Transformer 24 VAC hot

TR

Transformer 24 VAC common

  1.  Stage two of gas valve (HI)

  2.  Stage one of gas valve (LO)

  3.  Pressure switch in

  4.  Flame sensor

  5. N/A

  6.  Fusible link (Roll out switch)

  7.  Common  (24 VAC), B

  8.  Limit switch (out)

  9.  Limit switch (in)

LEGEND

9-PIN CONNECTION

Blower

ICM2914

MADE IN THE USA

LED2

FAULT

LED1

STATUS

HEAT
COOL

90 60

0

45

BLOWER RELAY

Inducer

PARK

B

G
W

Y
R

E_GND

G
W
Y
R
C

Thermostat

PRI

460 VAC

SEC

24 VAC

Earth 

Ground

ECM

ECM

L1

L2

K4

K3

24 VAC

Load

Load

IN

IN

Spark 

Electrode

Earth Ground

Earth Ground

WIRING DIAGRAM

FLAME CURRENT

1VDC = 1uA 

TR

TH

F1

Blower

BLOWER

ICM2913

MADE IN THE USA

LED2

FAULT

LED1

STATUS

HEAT
COOL

90 60

0

45

BLOWER RELAY

Inducer

PARK

B

C

Load

Load

IN

IN

Earth Ground

B

G
W

Y
R

E_GND

G
W
Y
R
C

Thermostat

IDM

PRI

230 VAC

SEC

24 VAC

Earth 

Ground

L1

L2

Spark 

Electrode

Earth Ground

WIRING DIAGRAM

FLAME CURRENT

1VDC = 1uA 

TR

TH

F1

Earth 

Ground

Blower

ICM2916

MADE IN THE USA

LED2

FAULT

LED1

STATUS

HEAT
COOL

90 60

0

45

BLOWER RELAY

Inducer

PARK

B

G
W

Y
R

E_GND

G
W
Y
R
C

Thermostat

PRI

230 VAC

SEC

24 VAC

TR

TH

ECM

L1

L2

K4

K3

24 VAC

Line 

VAC

IDM

Earth Ground

Spark 

Electrode

Earth Ground

WIRING DIAGRAM

FLAME CURRENT

1VDC = 1uA 

F1

WIRING DIAGRAM

ICM2915

LED1

STATUS

Thermostat

Earth 

Ground

Spark 

Electrode

F1

G

W2

W1

R

C

Y

W1

R

B

W2

G

Y

HEAT

COOL

90

60

0 45

L2_BLO

HIGH

LOW

L2_IND

IND_HI

IND_LO

NC

NO

COM

NC

NO

COM

NC

NO

COM

NC
NO

NC

NO

COM

NC

NO

COM

NC

NO

COM

SEC

24 VAC

PRI

230 VAC

C

R

L2

L1

ECM Controller

R
B

IDM

Earth 

Ground

PS

ROS

LIM

GV

PS

RO

FS

K2 K1

(C)

(R)

PRI

460 VAC

SEC

24 VAC

Earth 

Ground

Earth 

Ground

B

G
W

Y
R

E_GND

G
W
Y
R
C

Thermostat

TR

TH

Chassis 

Ground

Flame 

Sensor

CONNECTION DIAGRAM

LIM (OUT)

LIM (IN)

PS

ROS

LIM

Flame 

Sensor

GV

PS

RO

LIM (OUT)

FS

K2 K1

(C)

(R)

PRI

230 VAC

SEC

24 VAC

Earth 

Ground

Earth 

Ground

B

G
W

Y
R

E_GND

G
W
Y
R
C

Thermostat

TR

TH

Chassis 

Ground

CONNECTION DIAGRAM

LIM (IN)

PS

ROS

LIM

GV

PS

RO

FS

K2 K1

(C)

(R)

PRI

230 VAC

SEC

24 VAC

Earth 

Ground

Earth 

Ground

B

G
W

Y
R

E_GND

G
W
Y
R
C

Thermostat

TR

TH

Chassis 

Ground

Flame 

Sensor

CONNECTION DIAGRAM

LIM (OUT)

LIM (IN)

CONNECTION DIAGRAM

(C)

(R)

PRI

230 VAC

SEC

24 VAC

Earth 

Ground

TR

TH

Chassis 

Ground

B

G

W1

W2

R

Y

G

W2
W
R
C

Thermostat

Y

PS

ROS

LIM

GV

PS (IN)

HI

LO

ROS

FS

K3

K1

Flame 

Sensor

LIM (OUT)

LIM (IN)

K2

B (COM)

LIAF314.indd   2

LIAF314.indd   2

4/14/22   11:15 AM

4/14/22   11:15 AM

Отзывы: