General information
5
HAZARDS
a
DANGER
–
In case of water leakages, disconnect the Boiler from the power supply mains, close the water supply and contact, as soon
as possible, the Technical Assistance Service Authorised by
ICI CALDAIE S.p.A.
or qualified personnel.
–
Sensing the presence of fuel in the thermal power plant, it is appropriate to follow the precautions below to avoid the risk
of explosions and fires:
-
do not smoke or cause sparks
-
do not turn on lights or electrical devices in general (mobile phones)
-
open doors and windows
-
close the fuel shut-off valve normally placed outside the thermal power plant
-
disconnect the power supply by means of the switch which is usually located outside of the plant room.
–
During the normal operation, the appliance has hot parts, such as the channel and the flue gas box, which in case of
accidental contact without appropriate personal protection can cause severe burns.
–
An incorrect adjustment of the closing door or an insufficient chimney draught can cause the presence of smoke inside
the heating plant room, leading to fatal intoxications due to carbon monoxide, which is by nature colourless and odourless.
Therefore, make sure that the Boiler is correctly adjusted and installed and that the heating plant room features vents
compliant with the standards in force.
IDENTIFICATION
Each
CODEX GT
Boiler can be identified by means of the technical data plate inside the envelope of the documents supplied with
the Boiler, which includes technical/efficiency informations such as:
–
serial number or identification marking
–
nominal thermal power in kW
–
nominal thermal flow in kW
–
types of fuels which can be used
–
maximum operating pressure.
–
CE marking
m
IMPORTANT
The installer of the Boiler
MUST
apply the technical data plate (1)
mandatorily
, once the installation is complete,
in a
position which is visible and legible with the appliance installed
. In case of deterioration or loss, request a duplicate
from
ICI CALDAIE S.p.A.
Technical Assistance Service providing the Boiler serial number.
1
The appliance is also accompanied by
construction certificate
attesting the successful result of the hydraulic test.
m
IMPORTANT
The installation must be performed in compliance with the local standards by
qualified personnel
, namely by
personnel with specific technical skills in the field of the heating system components. An incorrect installation may
cause damage to persons or property for which the manufacturer will not be liable.
During
commissioning
check the effectiveness of all adjustment and control devices in the control panel.
The
warranty
validity is subject to compliance with the instructions in this manual.
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz
Содержание 17010195
Страница 29: ...Notes 29 Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz Web www cookeindustries co nz ...
Страница 30: ...Notes 30 Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz Web www cookeindustries co nz ...
Страница 31: ...Notes 31 Cooke Industries Phone 64 9 579 2185 Email sales cookeindustries co nz Web www cookeindustries co nz ...