icetro ISI-300TW Скачать руководство пользователя страница 12

12

For long-term storage 

1. Drain raw ice cream liquid, clean the machine, and assemble the dasher cover and dasher 

    assay while the body is still wet from cleaning.

2. Lock the water supply valve. The power supply must be connected at this point, so check if it is.

3. Disconnect the water supply valve from the side of

    the machine to drain any remaining water in

    the line. (Figure 1)

4. Unscrew the quick valve cover from the lower part 

    of the left panel and have a basket ready at the

    outlet hose.

5. Turn and open the quick valve inside of the valve 

    cover counter-clockwise. 

    This will allow the water to flow from the outlet hose. 

    (Figure 2)

6. Press the "AUTO" button and keep the machine 

    running for 5~10 minutes.

7. Press the "STOP" button on the front to stop the machine.

8. After water is completely drained, lock the water valve (Figure 1) 

    and quick valve (Figure 2) and close the cover. 

    (About 1.3~1.5 liters of water will be drained.)

9. To reuse the machine, lock the quick valve again (Figure 2) and reconnect the water 

    supply line (Figure 2)

(Up to 10 minutes until the high-pressure switch is activated and 

 the machine stops.)

(The basket is for collecting the water that may spill

  on the ground.)

(Refer to the user instruction for the cleaning method.)

Waring

The machine will be out of order if water gets frozen due to sub-zero temperature in winter.

   Be sure to drain water before storing the machine.

The manufacturer will not be responsible for the freezing and bursting of the machine without 

   draining water. Be sure to keep the following precautions to avoid charging of excessive 

   repair cost:

Be sure to check the following when connecting the water supply line!

1. The pipe must have a diameter bigger than Φ12.7mm.

2. Check if the pressure is between 0.3 and 0.5 Mpa on the water pressure gauge after 

    connecting the line. (The water pressure gauge is on the back of the machine.)

3. If pressure is lower than 0.3 Mpa when operating the machine, control the flow of 

    the main valve to ensure stable operation.

4. The high-pressure cut-out switch (HPS) of the machine will be activated to stop and 

    protect the machine unless pressure is strong enough. 

    Remember to maintain the proper water pressure.

(Figure 1)

quick valve

(Figure 2)

open

close

water pipe

separation

off

water bottle

drain hose

valve cover

Содержание ISI-300TW

Страница 1: ...SI 300T TW SOFT ICE CREAM FREEZER User s Manual This product is designed for indoor use Make sure to install it indoors The appearance design color and parts of the product are subject to change witho...

Страница 2: ...ndependent cooling system With a high efficiency and low noise motor we can achieve minimal noise from the refreshing cooling system Use of an artificial intelligence control type achieves an optimal...

Страница 3: ...ns and specifications shown in this manual and on the web site are subject to change without notice Please visit our website at http www icetro com to obtain the latest specifications Dear customers C...

Страница 4: ...e death or major injury when the details are violated If you neglect this symbol and wrongly use the product it may cause a fire serious injury or death Warning Danger Caution This means that it can c...

Страница 5: ...ent may result unless it is properly disposed of Call your distributor Caution Caution If the power cable needs replacement or repair call a service center or an expert Caution Do not place any obstac...

Страница 6: ...ution While operating the product please close the upper cap completely Do not turn the power ON OFF with the circuit breaker continuously Do not arbitrarily connect the power cord or process it for u...

Страница 7: ...e may occur Explosion fire or injury may occur Fire or electric shock may occur The product may fall down or develop a problem Prohibited Stop using the machine if you find the power cable or any othe...

Страница 8: ...ove the wooden packing taking care not to damage the exterior of the Ice Cream Dispenser 2 Remove the wooden packaging and the protective tapes and make sure that all parts of the system are complete...

Страница 9: ...peration of the system Maintain space of 50cm or more each between the walls and the right and rear sides 20cm or more between the left of the system Precisely seat the rubber feet at the bottom to pr...

Страница 10: ...if there is water leak due to a defect of the tap on top of the product 1 Coil teflon tape 5 10 times around the thread of water supply connector 2 Fir rubber packing in the corrugated tube nut of the...

Страница 11: ...or single phase power distribution box Install an earth leakage breaker with capacity of 15A or higher in the distribution box Earth shall be provided for the safe operation of the system Maintain spa...

Страница 12: ...tes until the high pressure switch is activated and the machine stops The basket is for collecting the water that may spill on the ground Refer to the user instruction for the cleaning method Waring T...

Страница 13: ...85 35 908 88 BUTTON DISPLAY LEVER COVER FOOD FAN POWER SWITCH POWER SWITCH DRAIN SLUG FRONT PANEL FILTER COVER BACK PANEL SIDE COVER SIDE PANEL FOOT RUBBER POWER DRAIN BOX FRONT BACK SSI 300T RIGHT SI...

Страница 14: ...N DISPLAY LEVER COVER FOOD FAN POWER SWITCH DASHER COVER BOLT DRAIN SLUG FRONT PANEL SIDE PANEL VALVE COVER VALVE COVER WATER PRESSURE GUAGE DRAIN BOX FRONT BACK RIGHT SIDE LEFT SIDE Name of each part...

Страница 15: ...9 715 720 814 77 54 636 767 Name of each part FRONT BACK LEFT SIDE POWER FILTER COVER BRACKET BACK PANEL BUTTON DISPLAY LEVER POWER COVER FOOD FAN DRAIN SLUG DRAIN SLUG DRAIN COVER SIDE PANEL DRAIN B...

Страница 16: ...S DASHER LUG POM DASHER LUG POM 300 PART 151 1 EA 1 EA 6 EA 2 EA 1 EA 1 EA WHITE 1 EA BLACK 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 2 EA 1 EA 1 EA 3 EA 2 EA 1 EA 1 E...

Страница 17: ...60mm 715mm HEIGHT foot inclusion 820mm 820mm 690mm Cylinder capacity 3 4 1 3 Mixing tank capacity 19 5 9 Consecutive selling At interval of 30 seconds Caution for making 100g of ice cream at 27 20 24c...

Страница 18: ...alve and turn off the earth leakage circuit breaker The air suction and discharge should be facilitated so that the cooling performance can be optimized For better taste of soft ice cream do not miss...

Страница 19: ...on 2 1 Displays the soft cream temperature in the storage tank 2 2 Displays the ingredient temperature inside the cylinder 2 3 Displays the condenser suction temperature Stand by button It is used to...

Страница 20: ...the ingredients are in the liquid status 1 3 Check the currently supplied voltage It is the power supplied to the machine If the voltage is not correct after installation call for service 1 4 Check t...

Страница 21: ...tank 2 2 Temperature of the mixing tank sensor 2 3 Condenser suction temperature neighboring temperature 2 1 Temperature of the mixing tank The sensor located at the bottom of the mixing tank to meas...

Страница 22: ...malfunctions may occur Consult an engineer 3 4 Set the mixing tank temperature This item is used to adjust the cooling temperature of the ingredients in the mixing tank The larger the number is the h...

Страница 23: ...raw material in the hopper The temperature set in this category is managed as the value added from the value in Categories 3 4 For example if 3 4 is 2 and 4 3 is 2 the management temperature of the ho...

Страница 24: ...from the compressor rest time At this time when 1 is added to the temperature at which the soft freezer is made the value set for this category is deducted from the percentage and is then displayed 4...

Страница 25: ...tion Then the installation environment must be improved 4 12 No load detection function setting The no load detection function can be turned ON OFF No load means the raw material inside the cylinder e...

Страница 26: ...ake sure it has a supply of enough stable power 4 21 Dasher motor delay time setting Sets the motor s operation delay time after making soft freezer 4 22 Compressor delay time setting This sets the co...

Страница 27: ...for 40 or lower This sets the temperature compensation value of the ambient temperature to the environmental temperature of 40 or lower 5 Temperature compensation value setting for 41 or higher This...

Страница 28: ...4 31 MIX LOW function selection 4 32 Frequency standard value setting Setthe frequency standard of the supply power When the standardvalue of this category is wrongly selected the present supply volt...

Страница 29: ...production of ice cream caused by using materials in non frozen state 10 For your information 1 Pour 2 0 151TG 1 of ingredients in the mixing tank The raw material must has been stored in a cooler at...

Страница 30: ...ew Adjust to reduce the out speed of the soft ice cream After setting up the adjustment bolt position tighten the set nut a to fix the Screw Adjust position and maintain constant dispensing volume For...

Страница 31: ...er area of the caburator body with the large hole in the upper area of the tube Decrease the overrun and increase the amount of ingredients injection in this way when you need continuous vending of th...

Страница 32: ...cream liquid in the mixing tank and pour faucet water into it Repeat it two or three times until you get clean water from it 4 Clean up the inside of the mixing tank with a soft towel and neutral dete...

Страница 33: ...a of the tank 10 Press the wash button and finally discharge the water from the mixing tank Use faucet water to rinse off the cleaning agent residuals 11 Press the wash button to stop the product and...

Страница 34: ...lean up the cylinder 15 Disassemble the DASHER ASS Y wash all the parts using detergent and wipe them with soft cloth 17 Extract a handle shaft and separate the lever from the dasher cover 16 Disassem...

Страница 35: ...dasher cover with a brush and soft cloth 20 Clean the piston assembly hole of the dasher cover with a brush and soft cloth 21 After cleaning off all parts dry them and reassemble them in the reverse o...

Страница 36: ...wash it clean with water 3 Dry the filter element and reinstall it in the machine 4 Clean and dry the filter and insert in into the machine The Cleaning cycle Filter one time a week The pollution sta...

Страница 37: ...charge lever into the piston and then insert the lever in line with the dasher cover and the discharge lever 4 Insert the packing dasher to the dasher cover 5 Insert the mixing shaft and align the das...

Страница 38: ...initial installation education adjust the level value of the soft ice cream or contract the customer satisfaction team The noise is disturbing 1 This product is an industrial machine and has some oper...

Страница 39: ...ING PACKING JAVARA 6months 6months Once a year Once a year 1 EA 4 EA 6 EA 1 EA PART NAME Replacement cycle Quantity SIZE DASHER COVER PACKING PACKING PISTON 151 PACKING JAVARA PACKING CABURATOR 6month...

Страница 40: ...e Continuous display Er 9 noLA Soft cream not formed Start After a dormancy Continuous display Er 10 Lovo Supply voltage exceeding 15 Stop Auto release Continuous display Er 11 Hivo Supply voltage exc...

Страница 41: ...41 Circuit diagram...

Страница 42: ...42 Circuit diagram...

Страница 43: ...43 SCREW ADJUST MIXING SHAFT BEARING DASHER DASHER LUG POM Part list DASHER ASSY COMPRESSOR CONDENSER SSI 151...

Страница 44: ...44 Part list OUT SIDE SSI 151...

Страница 45: ...45 Part list MOVE PART SSI 151...

Страница 46: ...46 Part list SSI 151...

Страница 47: ...47 Part list SSI 300...

Страница 48: ...48 Part list SSI 300...

Страница 49: ...49 Part list SSI 300...

Страница 50: ...50 Part list SSI 300 DASHER ASSY...

Страница 51: ...51 Part list SSI 300 REFRIGERANT...

Страница 52: ...52 Part list SSI 300 ASSY CONTROL BOX...

Страница 53: ...MEMO 53...

Страница 54: ...MEMO 54...

Страница 55: ...MEMO 55...

Страница 56: ...3240216 03 Online Internet Service http www icetro com...

Отзывы: