Ice ICE-D50X2 Скачать руководство пользователя страница 2

8 M3x6

STEP 3:

(

)

Pumps in Series

 , , 。

 !"#

(

)

STEP 1:

$%&'()*+,。  !"#

(

)

STEP 2:

(

)

Plug

(

)

plate

(

)

Screw M3x6

M3x6

(O-ring)

(O-ring)

(O-ring)

(Acrylic board)

*+,

(Front panel)

'(

(

)

Screw M3x12

M3x12

(

)

Screw M3x10

M3x10

-.

(

)

Reflector

(

)

Screw M3x8

M3x8

(

)

Plug

(

)

Plug

(O-ring)

(Clear Window)

/0(

(Front panel)

'(

(

)

Screw M3x12

M3x12

(

)

Screw M3x10

M3x10

(Pump1)

1

1

(Pump2)

1

2

2

(In)

4

(Out)

(

)

Plug

(Pump1)

1

1

(Pump2)

1

2

2

(In)

4

(Out)

(

)

Plug

(

)

Parallel / Relay Pump

(

)

Parallel Pump

(

)

Relay Pump

Pump1

Pump2

Pump1

Pump2

Pump1

Pump2

$%&

-.,5 。 -.79:;

(

)

 

STEP 3:

$<=2?@/0()'(。

(

)

AB"#CD

STEP 4:

11)12FGHI。

STEP 5:

JKLN;OPQRS;。

STEP 6:

(

)

Screw M3x6

M3x6

TUVWXY,'( ,Z[\]^。

STEP 3:

(

)

Plug

Remove both plates and stop plugs from reservoir as
shown bellow, then install bottom plates back.
(Caution: O-ring may come off)

Remove front panel and acrylic board.
(Caution: O-ring may come off)

Remove two reflector and fasten 1 plug as shown.
(Do not discard reflector)

Reverse STEP 2 for assembly. Make sure all o-rings are
placed at correct places.

Pump 1 and 2 inseries mode 1.

Pump 1 and 2 inseries mode 2.

Fasten reservoir to 5.25” bays with M3x6 screws provided.

When loop(s) completed, remove stop plug from
front panel and fill loop.

Installing The Reservoirs

(

)

(

)

Reservoirs

(

)

Pump cover

1_`

(

)

Pump

1

(O-ring)

(

)

Screw M4x10

M4x10

(

)

Installing The Pump

abcde1f。

STEP 1:

(O-ring)

$%a1)_`Dgf,h

(M4x10)

STEP 2:

(Pump1)

1

1

(Pump2)

1

2

(

)

Loop 1

i

1

(

)

Loop 2

i

2

 !"#

 ,$%&D , 。

(

)

STEP 1:

(

)

Plug

(

)

Plate

(

)

Screw M3x6

M3x6

i1)i2jkHI。

STEP 2:

(

/

)

  !"#

Pumps in Parallel/Default

(O-ring)

(

)

Plug

(O-ring)

ld mn(。

STEP 1:

o'(p[,'(q(rs。

STEP 2:

(

)

Panel

mn(

Attach provided o-ring to pump.

Attach pumps and covers to reservoir,
then fasten screws(M4x10) in cross pattern.

Open the

of the

, install the two

plugs,Install two backplanes.(

the

may fall off)

two bottom plates

Note:

O-ring

reservoirs

Loop 1 and Loop 2 are parallel operated.

Remove two 5.25” drive bay covers if applicable.

Slide reservoir horizontally into chassis from front,
Align reservoir front panel flush with chassis panel.

Отзывы: