background image

 

 
 

 

 

Evolution Series Air Conditioners 

Class I Division 2 Groups A, B, C, & D Hazardous Locations or Nonhazardous Locations 

 

OPERATION AND INSTALLATION MANUAL 

 
 
 
 
 

*** IMPORTANT *** 

PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system.  

Keep this manual for future reference. Some information may not apply to all systems. 

 

Содержание Evolution Series

Страница 1: ...cations or Nonhazardous Locations OPERATION AND INSTALLATION MANUAL IMPORTANT PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system Ke...

Страница 2: ...er 14 Alarm Operation 14 Maintenance 15 Trouble Shooting 15 Schematic Wiring Diagrams 17 Ordinary Locations 17 120V 220V 230V 17 400V 460V 480V 18 Hazardous Locations 19 120V 220V 230V 19 400V 460V 48...

Страница 3: ...thin the enclosure The three main thermal related systems that we employ are the closed loop cold air supply stream the heat rejection air stream and the vapor compression refrigeration system The clo...

Страница 4: ...on as indicated on the shipping container The unit must remain upright for a minimum of 24 hours before initial operation to ensure oil has returned to the compressor Operation before the 24 hour time...

Страница 5: ...rm air condenser blower will not operate if the room air temperature is below 80 F 27 C This is due to the fact that the programmable controller has a factory set point of 80 F 27 C The digital displa...

Страница 6: ...Error Reference source not found and Error Reference source not found Mechanical Installation Instruction Caution Protective safety clothing such as helmet gloves and steel toe shoes are recommended...

Страница 7: ...7 Figure 1 Enclosure Installation Figure 2 Push to Connect Fitting Ambient Side Enclosure Side...

Страница 8: ...e Installation Checks 1 Check the air conditioner model label or specification for power requirements 2 Check the designated air conditioner power supply for adequate and proper electrical power requi...

Страница 9: ...9 Figure 4 Terminal Block Figure 5 Power Terminal Block...

Страница 10: ...ly Closed Red will be installed See Figure 6 Alarm Output Pre Installation Checks 1 Ensure that the power connected to the alarm wires is in an NEC approved Class 2 circuit 2 Check that alarm wire rou...

Страница 11: ...ower will continue to operate circulating air within the enclosure The controller has a factory programmed temperature differential of 7 F 4 C Example Cooling On 80 F 27 C Cooling Off 73 F 23 C Ice Qu...

Страница 12: ...ng until the enclosure temperature increases approximately 7 F 4 C Press 1 or 2 until the desired set point is displayed within a range of 0 F to 63 F 17 8 C to 17 C Notes Heat is only available with...

Страница 13: ...will no longer flash and will show 4 To program the no PIN code mode press 2 and the display will show 0 indicating no PIN code With no PIN code pressing any button will permit access to the program...

Страница 14: ...ature must fall 4 F 2 C before the alarm will reset The above alarms can be manually reset by entering the PIN code into the system 3 The filter day timer has expired The Alarm LED lights the display...

Страница 15: ...d debris that may cause the system to fail The type of environment will determine the frequency of required maintenance Maintenance of the condensate management system will require access to the botto...

Страница 16: ...ompressor and condenser warm air stream blower operating Yes No Is the enclosure door closed tightly Yes No Are all of the gaskets in place Yes No Has the condenser warm air stream filter been cleaned...

Страница 17: ...17 Schematic Wiring Diagrams Ordinary Locations 120V 220V 230V Figure 8 IQ350942 Rev A...

Страница 18: ...18 Ordinary Locations 400V 460V 480V Figure 9 IQ350943 Rev A...

Страница 19: ...19 Hazardous Locations 120V 220V 230V Figure 10 IQ350921 Rev A...

Страница 20: ...20 Hazardous Locations 400V 460V 480V Figure 11 IQ350922 Rev A...

Страница 21: ...21 Specification Drawing 1000EV Figure 12...

Страница 22: ...22 2000EV Figure 13...

Страница 23: ...23 3000EV Figure 14...

Страница 24: ...24 4000EV Figure 15...

Страница 25: ...25 5000EV Figure 16...

Страница 26: ...26 6000EV Figure 17...

Страница 27: ...27 8000EV Figure 18...

Страница 28: ...28 10000EV Figure 19...

Страница 29: ...29 12000EV Figure 20...

Страница 30: ...30 14000EV Figure 21...

Страница 31: ...31 17000EV Figure 22...

Страница 32: ...32 20000EV Figure 23...

Страница 33: ...33 IQ1 2 3000EV Gasket and Cutout Same Gasket and Cutout for IQ1000EV IQ2000EV and IQ3000EV Figure 24...

Страница 34: ...34 IQ4 5 6000EV Gasket and Cutout Same Gasket and Cutout for IQ4000EV IQ5000EV and IQ6000EV Figure 25...

Страница 35: ...35 IQ8 10 12000EV Gasket and Cutout Same Gasket and Cutout for IQ8000EV IQ10000EV and IQ12000EV Figure 26...

Страница 36: ...36 IQ14 17 20000EV Gasket and Cutout Same Gasket and Cutout for IQ14000EV IQ17000EV and IQ20000EV Figure 27...

Страница 37: ...ARRANTY SET FORTH HEREIN IS STRICTLY LIMITED TO ITS TERMS AND IS IN LIEU OF ALL OTHER WARRANTIES GUARANTEES EXPRESS OR IMPLIED ARISING BY OPERATION OF LAW COURSE OF DEALING CUSTOM USAGE OF TRADE OR OT...

Страница 38: ...om the date of shipment FCA from Ice Qube s facility in Greensburg Pennsylvania However such in field service is only available at the sole discretion of Ice Qube In field service may not be available...

Страница 39: ...M IN FIELD SERVICE THESE UNITS WILL EITHER BE RETURNED TO THE FACTORY FOR REPAIR OR MAY BE ELIGIBLE FOR A REPLACEMENT UNIT THIS WILL BE AT THE SOLE DISCRETION OF ICE QUBE INC Extended Warranty Options...

Страница 40: ...40 Notes...

Отзывы: