v
Now,
the
battery
age
clock
is
reset
to
0.
12.
Remove
the
antistatic
protection.
13.
Install
the
front
bezel
by
aligning
the
pins
on
the
storage
subsystem
chassis
with
the
spring-steel
retainers
on
the
cover
and
then
press
the
cover
toward
the
chassis
until
the
pins
snap
into
place.
14.
Use
the
Subsystem
Management
window
to
check
the
status
of
all
components
in
the
storage
subsystem.
15.
Do
any
storage
subsystems
have
a
fault
(Needs
Attention)
status?
v
Yes
–
Select
the
Recovery
Guru
toolbar
button
in
the
DS4000
Storage
Manager
Subsystem
Management
window,
and
complete
the
recovery
procedure.
If
the
problem
persists,
contact
your
IBM
service
representative.
v
No
–
Go
to
step
16.
Use
the
DS4000
Storage
Manager
client
software
to
a
new
storage
subsystem
profile.
Note:
Note
that
it
might
take
from
15
minutes
to
a
few
hours
for
a
new
battery
to
become
fully
charged.
The
DS4000
Storage
Manager
client
will
show
the
battery
as
charging
until
it
is
fully
charged.
Controller
caching
is
automatically
disabled
until
the
new
battery
becomes
fully
charged.
17.
After
24
hours,
check
the
Needs
Attention
and
Battery
LEDs
to
ensure
that
the
battery
is
working
properly.
If
the
replacement
battery
indicates
a
fault,
contact
your
IBM
support
representative.
Replacing
an
SFP
module
Use
the
following
procedure
to
replace
an
SFP
module
in
a
controller.
The
SFP
module
shown
in
this
procedure
might
look
different
from
those
you
are
using,
but
the
difference
does
not
affect
SFP
module
performance.
Electrostatic
discharge
can
damage
sensitive
components.
To
prevent
electrostatic
discharge
damage
to
the
storage
subsystem,
use
proper
antistatic
protection
when
handling
the
DS4800
components.
Attention:
Removing
an
SFP
module
that
has
not
failed
can
cause
data
loss.
To
prevent
data
loss,
remove
only
the
SFP
module
that
has
a
Bypass
LED
on
or
that
displays
a
failed
status
in
the
DS4000
Storage
Manager
client
software.
1.
Use
the
DS4000
Storage
Manager
client
software
to
a
new
storage
subsystem
profile.
2.
Locate
the
storage
subsystem
that
has
the
failed
SFP
module
by
checking
the
Overall
DS4800
Configuration
Needs
Attention
LED
on
the
front
bezel
of
the
storage
subsystem.
shows
the
location
of
the
Overall
DS4800
Configuration
Needs
Attention
LED
on
the
front
bezel.)
Chapter
5.
Replacing
components
163
Содержание TotalStorage DS4800
Страница 1: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 2: ......
Страница 3: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 18: ...xvi IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 168: ...140 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 216: ...188 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 220: ...192 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 240: ...212 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 246: ...218 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 249: ......
Страница 250: ...Part Number 22R6614 Printed in USA GC26 7845 01 1P P N 22R6614...