Additionally, for Model 225, be sure to thread the cables through the cable-restraint
bracket and then route the cables through the cable-management assembly on the
rack (see Figure 11).
Cable straps
Figure 11. Routing cables through cable-management assembly
22
IBM TotalStorage
™
Network Attached Storage 200 Installation Guide
Содержание totalstorage 200
Страница 1: ...IBM TotalStorage Network Attached Storage 200 Models 200 and 225 Hardware Installation Guide ...
Страница 2: ......
Страница 3: ...IBM TotalStorage Network Attached Storage 200 Models 200 and 225 Hardware Installation Guide ...
Страница 8: ...vi IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 10: ...viii IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 14: ...xii IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 18: ...4 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 40: ...26 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 86: ...72 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 99: ...Appendix B Safety and environmental notices 85 ...
Страница 100: ...86 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 101: ...Appendix B Safety and environmental notices 87 ...
Страница 102: ...88 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 103: ...Appendix B Safety and environmental notices 89 ...
Страница 104: ...90 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 117: ...Appendix B Safety and environmental notices 103 ...
Страница 130: ...116 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 144: ...130 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 147: ...warranty statement 119 Index 133 ...
Страница 148: ...134 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Страница 151: ......