N3300 Installation and Setup Instructions
IBM System Storage
Страница 1: ...N3300 Installation and Setup Instructions IBM System Storage...
Страница 2: ......
Страница 3: ...rol none receive send full Enable jumbo frames Y N Network Configuration Information for e0b IP address for e0b Netmask for e0b Should interface e0b take over partner IP address during failover Y N IP...
Страница 4: ...Controller BMC provides remote management capabilities including console redirection logging and power control It also extends Autosupport by sending down filer event alerts Would you like to configur...
Страница 5: ...eb site www ibm com storage support nas TM Read the safety notices Before continuing make sure that you have reviewed the safety notices on the documentation CD that came with this system Do not plug...
Страница 6: ...on the model you purchased See Step 1 1 for a list of contents for specific models Note Lift box from crate The contents will remain in place 2 Note Small Form Factor Pluggable SFP modules will eithe...
Страница 7: ...ount Kit 1 Dual controller N3300 1 System bezel 2 Console adapter RJ 45 to DB 9 1 Serial null modem cable 2 ESD wrist strap 4 Power cords 1 Publications There will also be at least one envelope with t...
Страница 8: ...Note It is recommended that the N3300 be placed in the lowest position available in a rack For example N3300 A20 Model A10 Model A20 Expansion Unit 2 Expansion Unit 1 Filer Node 2 Loop 1 Filer Node 2...
Страница 9: ...ne up with the bottom EIA boundary When installed each N3300 will occupy a 2U space Using one silver pan head M5 screw attach the rail to the front of the rack using hole H6 T Note right hand ighten t...
Страница 10: ...ing pins Bottom rail screw REAR Left and Right Rails Chassis attach screws H2 H1 H3 H4 H5 H6 FRONT Left and Right Rails Top rail screw Locating pins Chassis attach screws 1 EIA unit 1U Bottom rail scr...
Страница 11: ...he front mounting bracket of the storage system is a few inches from the rack frame 3 Caution The weight of this part or unit is between 18 and 32 kg 39 7 and 70 5 lb It takes 2 persons to safely lift...
Страница 12: ...laced and cabled according to these labels Installation and Setup Instructions Replace the front bezel of the N3300 by snapping it onto the storage system chassis 3 5 3 6 From the rear of the rack att...
Страница 13: ...al null modem cable from your console to the DB 9 end of the adapter Fibre Channel Ethernet Console Remote Management Port Port Labels e0b e0a 0a 0b 4 1 4 2 Connect your system to the network by plugg...
Страница 14: ...nagement must negotiate down to 10 100 or auto negotiate Note Data ONTAP System Administration Guide Important Attention Do not change the system ID when you set the disk shelf IDs Use the factory set...
Страница 15: ...system to a fibre channel switch in the Software disk ownership is activated at boot for all disks on the system must must Note 11 Cable the Fibre Channel ports according to your configuration For a...
Страница 16: ...t expansion unit module B ESH2 ESH4 or AT FCX In port 5 3 3 For any additional expansion units in a loop connect the module A Out port to the next expansion unit s module A In port Repeat for module B...
Страница 17: ...our configuration 5 4 To cable the Channel A paths in a dual node A20 cluster complete the following steps using the diagram for reference The numbers in the diagram correspond to the step numbers bel...
Страница 18: ...configuration CM A PSU PSU IN OUT IN OUT PSU PSU IN OUT IN OUT PSU PSU 0a e0a e0b 0b CM B e0a e0b 10101 10101 B A B A 0a 0b N3300 EXN EXN 5 5 For any additional expansion units in a loop connect the...
Страница 19: ...al node cluster PSU PSU IN OUT IN OUT PSU PSU IN OUT IN OUT PSU PSU N3300 0a e0a e0b 0b CM B e0a e0b 10101 10101 B A B A 0a 0b EXN EXN CM A Do the following for each stack of storage expansion units 5...
Страница 20: ...for all system units that are being installed using power cord retainer clips as shown below power supply 1 and power supply 2 6 3 Connect the power cords to the power sources making sure that the Do...
Страница 21: ...Note The N3300 has no requirement or provision for grounding For proper grounding of expansion units refer to the for the expansion unit Installation and Setup Instructions Grounding the N3300 7 17...
Страница 22: ...tinue through the command line interface Refer to the for more information about choosing a setup method No Yes IBM System Storage N series Data ONTAP Software Setup Guide for your version of Data ONT...
Страница 23: ...cument and all hardware to the customer To complete the initial setup of a dual node N3300 continue with Step 8 9 IBM System Storage N series Data ONTAP Software Setup Guide for your version of Data O...
Страница 24: ...rn off your system and expansion units and then turn on the expansion units Check the quick reference card that came with the EXN units for information about LED responses 9 Use the onboard diagnostic...
Страница 25: ...ta ONTAP System Administration Guide 21 Testing field replaceable units and diagnosing and correcting system hardware problems IBM System Storage N series Diagnostics Guide The following N series publ...
Страница 26: ...nces in this publication to IBM products or services do not imply that IBM intends to make them available in every country or region IBM the IBM logo and System Storage are trademarks and or registere...