Chapter 13. Maintenance and troubleshooting
625
6. Click Next, Review the Summary page and click Finish if all information displayed is
correct, as shown in Figure 13-51.
Figure 13-51 Summary panel for review
13.13 IBM Flex System V7000 Storage Node power on and off
You can shut down only one node or the entire cluster using the IBM Flex System V7000
Storage Node management GUI. When shutting down only one node canister, all the
activities remain active on the partner node; however, when you shut down the entire cluster,
your access to volumes and data will be lost until you manually restart the system.
Follow these general procedures to power on or to power off the system. The procedures
must be followed in the order given. For more information, see the IBM Flex System V7000
Information Center.
Содержание Storwize V7000
Страница 2: ......
Страница 12: ...x IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 18: ...xvi IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 20: ...xviii IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 176: ...156 IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 208: ...188 IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 332: ...312 IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 476: ...456 IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 530: ...510 IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 664: ...644 IBM Flex System V7000 Storage Node Introduction and Implementation Guide...
Страница 669: ......