the same airflow indicator. Be sure that you are pulling cool air into the air
intake side of the device. For more details, refer to“Fan and power supply
airflow” on page 162.
6.
If applicable, lock the wheels of the lift.
7.
Install the applicable rack mount kit in your equipment rack and mount the
device using the rack mount kit's installation instructions.
Note:
When installing the device into the rack, use one person on each side of
the device to gently slide it onto the final installation surface and ensure that
it remains supported during the transfer.
8.
Reinstall the cable management comb if you removed it.
9.
Install the vertical cable management fingers on the rack's upright posts.
10.
Reinstall the chassis door. The door must be installed to meet EMI
compliance.
Port-side slot numbering
The SAN512B-6 contains 10 full-height slots and two half-height slots, for a total of
12 slots. Facing the port side of the device, the half-height slots are on the left,
numbered 1 (top slot) and 2 (bottom slot). The remaining full-height slots are
numbered 3 through 12, counting from left to right of chassis.
Slots contain guide pins and connectors designed for specific blade types. Only
install the control processor (CP), core routing (CR), port, and extension blades into
slot numbers as follows:
v
Slots 1– 2 are restricted to CP blades. Note that the blade installed in slot 1 will
be designated as CP0, while the blade in slot 2 will be designated as CP1 in CLI
command and message output.
v
Slots 3–6 and slots 9–12 are restricted to port and extension blades.
v
Slots 7– 8 are restricted to CR32-8 blades.
Installing the 14U Rack Mount Kit for Four-Post Racks
Use the following instructions to install a modular device in a 19-in. (48.3 cm) EIA
rack using the 14U Rack Mount Kit for Four-Post Racks. Any updates to these
instructions will be added to the hardware installation guide for your product.
Two rack-mount kits are available.
1.
Contains shelf brackets that telescope from 27 in. (68.58 cm) to 31 in. (78.74 cm)
to fit the majority of racks.
2.
Contains 22 in. (55.88 cm) fixed shelf brackets that are designed for specific
racks.
Note:
Hardware devices illustrated in these procedures are only for reference and
may not depict the device you are installing into the rack.
Time and items required
Allow approximately one hour to unpack and install a device in a rack.
The following tools are required when installing the 14U Rack Mount Kit for
Four-Post Rack:
v
Torque screwdriver with #2 Phillips screwdriver tip
20
SAN512B-6 Installation, Service, and User Guide
Содержание SAN512B-6
Страница 2: ......
Страница 8: ...vi SAN512B 6 Installation Service and User Guide...
Страница 10: ...viii SAN512B 6 Installation Service and User Guide...
Страница 12: ...x SAN512B 6 Installation Service and User Guide...
Страница 40: ...16 SAN512B 6 Installation Service and User Guide...
Страница 60: ...36 SAN512B 6 Installation Service and User Guide...
Страница 128: ...104 SAN512B 6 Installation Service and User Guide...
Страница 140: ...116 SAN512B 6 Installation Service and User Guide...
Страница 170: ...146 SAN512B 6 Installation Service and User Guide...
Страница 184: ...160 SAN512B 6 Installation Service and User Guide...
Страница 196: ...172 SAN512B 6 Installation Service and User Guide...
Страница 208: ...184 SAN512B 6 Installation Service and User Guide...
Страница 214: ...Figure 59 Removal and replacement of the chassis door 190 SAN512B 6 Installation Service and User Guide...
Страница 258: ...234 SAN512B 6 Installation Service and User Guide...
Страница 274: ...250 SAN512B 6 Installation Service and User Guide...
Страница 285: ......
Страница 286: ...IBM Part Number 01JC152 Printed in USA SC27 8966 02 1P P N 01JC152...