2.
At the back of the cabinet, remove the securing bolt from the node side rail next to the power supply,
as shown in Figure 31.
3.
Slide the cable-retention bracket over the cable and position it over the side rail. Secure it in place
using the original bolt.
Replacing the SAN Volume Controller 2145-8F4 cable retention bracket
The cable-retention bracket attaches to the support rail at the back of the SAN Volume Controller
2145-8F4 node.
To attach the bracket, perform the following steps:
1.
Insert the power cable in the node.
2.
Insert the bracket onto the power cable so that the power cable is held by the slot on the end of the
bracket. Figure 32 provides a view of how to align the cable-retention bracket with the cable.
3.
Position the cable-retention bracket against the support rail and attach the bracket onto the slot in the
rear of the rail.
svc00302
Figure 31. The SAN Volume Controller 2145-8G4 with cable-retention bracket type B attached
svc00175
Figure 32. Attaching the cable retention bracket to the SAN Volume Controller 2145-8F4 power cable
Chapter 2. Removing and replacing parts
45
Содержание SAN Volume Controller 2145-CG8
Страница 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Страница 2: ......
Страница 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Страница 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 24: ...xxii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 30: ...xxviii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 54: ...24 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 362: ...332 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 364: ...334 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 371: ......
Страница 372: ...Part Number 31P1584 Printed in USA GC27 2283 00 1P P N 31P1584...