d.
Lower the front of the node
4
until the other nail heads slip into the other
slots on the slide rails.
e.
Verify that the front latch
5
slides over the nail heads.
2.
Lift the locking levers on the slide rails and push the node
2
all the way into
the rack until it clicks into place.
See
1
in Figure 31.
Connecting the SAN Volume Controller 2145-CG8 to the 2145 UPS-1U
Connect the SAN Volume Controller to the 2145 UPS-1U to protect your data in
the event of an unexpected loss of external power.
Before you begin
Notes:
v
To make the SAN Volume Controller clustered system more resilient to power
failure, the 2145 UPS-1U units can be connected to the redundant ac-power
switch. If a redundant ac-power switch is not used, you can connect the two
svc_bb1ka020
Figure 30. Installing the SAN Volume Controller 2145-CG8 node in the slide rails of the rack
svc_bb1ka055
Figure 31. Raising the SAN Volume Controller 2145-CG8 locking levers of the slide rails of
the rack
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware
35
Содержание SAN Volume Controller 2145-CG8
Страница 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 99: ...Russia Electromagnetic Interference EMI Class A Statement Taiwan Class A compliance statement rusemi Notices 71...
Страница 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 109: ......
Страница 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...