4.
Verify that the redundant ac-power switch power cables are tidy. Ensure that
they do not obstruct other equipment and that they are tied in place where
necessary.
Testing the redundant ac-power switch
You can test the redundant ac-power switch before you continue installing other
SAN Volume Controller components. You can test the redundant ac-power switch
later if a suitable test device is not available.
About this task
You can test whether the redundant ac-power switch correctly switches between
power inputs when the main input power fails or is restored. You can either use a
volt meter to measure for voltage at the output or attach a work light, or similar
device with a C14 plug, to the redundant ac-power switch output and verify that it
remains powered when a failure is simulated on either of the inputs.
Notes:
v
If you do not have a separate device to verify that there is power on the output
port of the redundant ac-power switch, you can delay this test until you connect
the redundant ac-power switch to the uninterruptible power supply. In that case,
turn on the uninterruptible power supply (not the SAN Volume Controller node)
and see if it changes to battery power. The test fails if the uninterruptible power
supply switches to battery power for more than five seconds.
v
Any transient indications of battery power can be ignored.
When the instructions say to “remove power,” you can either turn the power off if
the site power-distribution unit (PDU) has outputs that are individually switched
or remove the specified redundant ac-power switch power cable from the outlet of
the site PDU.
Note:
If at any time there is no power on the output socket, ensure that the power
distribution sockets of the power source are turned on. If they are, recheck all of
the connections and decide if the redundant ac-power switch assembly, which
includes the input-power cables, is defective.
Perform the following steps to test the redundant ac-power switch:
Procedure
1.
Confirm that there is power at redundant ac-power switch output socket 2.
2.
Confirm that there is power at redundant ac-power switch output socket 1.
3.
Remove power from the main power cable to the redundant ac-power switch
and confirm that there is power at the redundant ac-power switch output 1.
4.
Reconnect the main power cable.
5.
Remove power from the backup power cable to the redundant ac-power switch
and confirm that there is power at the redundant ac-power switch output 1.
6.
Reconnect the backup power cable and remove the monitoring device.
Note:
After any failure, repeat the test phase from the start until all the tests
succeed.
16
SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide
Содержание SAN Volume Controller 2145-CG8
Страница 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 99: ...Russia Electromagnetic Interference EMI Class A Statement Taiwan Class A compliance statement rusemi Notices 71...
Страница 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Страница 109: ......
Страница 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...