This task shows you how to verify the installation after you install the SAN
Volume Controller in the rack and connect it to the uninterruptible power supply,
the storage area network (SAN), and the Ethernet.
Note:
If at any point the SAN Volume Controller does not operate as described,
see MAP 5000 in the
IBM System Storage SAN Volume Controller
Troubleshooting Guide
, unless a different maintenance analysis procedure
(MAP) is specified.
Perform the following steps to verify installation:
1.
Press the SAN Volume Controller power-control button. Because the button is
recessed, you might need a pointed device, such as a screwdriver, to press the
power-control button. Verify that the green power LED is lit. If the LED is not
illuminated, see MAP 5000: Start in the
IBM System Storage SAN Volume
Controller Troubleshooting Guide
to repair the problem.
Note:
You do not need to install any software. The node boots automatically.
The SAN Volume Controller 2145-CF8 runs an extended series of power-on
self tests. The node might appear to be idle for up to five minutes after
powering on.
Figure 35 illustrates the controls and indicators on the front panel that verify
the installation.
1
Front-panel display
2
Navigation buttons
3
Operator-information panel
4
Node identification label
5
Power-control button
6
Power LED
7
Select button
Verify that the node is booting without error. If it boots without error, either
the
Charging
,
Recovering
, or the
Cluster:
message is displayed in the first
line of the front-panel display.
2.
Press and hold the select button for five seconds. The check light comes on
and a display test is performed. Check that all display cells light and that a
bar scrolls horizontally and vertically across the display. When the display test
is complete, the check light goes off and a button test is started.
3.
Press the up, down, left, and right buttons to verify that they are working.
Figure 36 on page 36 shows four examples of what the front panel might
svc00541
1
2
3
4
5
7
6
2
1
4
3
Figure 35. SAN Volume Controller 2145-CF8 front panel
Chapter 2. Installing the SAN Volume Controller 2145-CF8 hardware
35
Содержание SAN Volume Controller 2145-CF8
Страница 2: ......
Страница 8: ...vi IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 10: ...viii IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 16: ...xiv IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 26: ...xxiv IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 32: ...6 IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 64: ...38 IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 66: ...40 IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 92: ...66 IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide...
Страница 99: ......
Страница 100: ...Part Number 31P1135 Printed in USA GC52 1356 01 1P P N 31P1135...
Страница 101: ...Spine information IBM System Storage SAN Volume Controller Model 2145 CF8 Hardware Installation Guide Version 5 1 0...