Position the redundant ac-power switch in the rack first, pushing the cables
through to the front of the rack. Mount in place, as shown in Figure 26, using
the four M6 screws.
Connecting the redundant ac-power switch to the site power
You must connect the redundant ac-power switch to the site power before you test
the redundant ac-power switch.
Perform the following steps to connect the redundant ac-power switch to the site
power:
1.
Determine a suitable cable route from the redundant ac-power switch to the
power distribution units.
2.
Route the main input-power cable of the redundant ac-power switch to the
specified power distribution unit, and connect it.
3.
Route the backup input-power cable of the redundant ac-power switch to the
specified power distribution unit, and connect it.
4.
Verify that the redundant ac-power switch power cables are tidy. Ensure that
they do not obstruct other equipment and that they are tied in place where
necessary.
svc00292
Figure 25. Positioning the clips
Figure 26. Positioned in rack
34
IBM System Storage SAN Volume Controller: Models 2145-8F2 and 2145-8F4 Hardware Installation Guide
Содержание SAN Volume Controller 2145-8F2
Страница 2: ......
Страница 8: ...vi IBM System Storage SAN Volume Controller Models 2145 8F2 and 2145 8F4 Hardware Installation Guide...
Страница 24: ...xxii IBM System Storage SAN Volume Controller Models 2145 8F2 and 2145 8F4 Hardware Installation Guide...
Страница 54: ...30 IBM System Storage SAN Volume Controller Models 2145 8F2 and 2145 8F4 Hardware Installation Guide...
Страница 78: ...54 IBM System Storage SAN Volume Controller Models 2145 8F2 and 2145 8F4 Hardware Installation Guide...
Страница 80: ...56 IBM System Storage SAN Volume Controller Models 2145 8F2 and 2145 8F4 Hardware Installation Guide...
Страница 88: ...64 IBM System Storage SAN Volume Controller Models 2145 8F2 and 2145 8F4 Hardware Installation Guide...
Страница 95: ......
Страница 96: ...Printed in USA GC27 2221 00...