![IBM S822LC Скачать руководство пользователя страница 223](http://html.mh-extra.com/html/ibm/s822lc/s822lc_manual_607973223.webp)
3.
Remove the screws on either side of the system that secure the system to the rack.
4.
While one person is supporting the weight of the front of the system, have the second person move to
the rear of the system and push the system partially out of the rack.
5.
Position one person on the left side of the system and one person on the right side of the system.
6.
Tilt and lift the system from the rails.
7.
Carefully set the system on a table with an appropriate ESD surface.
Placing an 8335-GTB system into the operating position
Learn how to place an IBM Power System S822LC (8335-GTB) system into the operating position.
About this task
Pick the proper type of rails for your system:
v
v
Slide rails
Use this procedure when your system is installed using slide rails.
Before you begin
When you place the system in the operating position, ensure that the cables at the rear of the system do
not catch or bind as you push the system unit back into the rack.
Procedure
1.
Unlock the blue rail safety latches (A) by lifting them upward.
Figure 222. Disconnecting the water hoses
Common procedures for servicing or installing features
207
Содержание S822LC
Страница 1: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Страница 2: ......
Страница 3: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Страница 16: ...xiv Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Страница 204: ...188 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Страница 242: ...226 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Страница 243: ......
Страница 244: ...IBM ...