Note: When attaching exterior and interior cables to a POWER3 SMP High Node allow for enough cable
for a 2-foot service loop for node movement into service position.
Note: For a multi-switch frame (F/C 2030/1), refer to Figure 2-7.
Figure 2-7. Frame cabling routing path in rear of RS/6000 SP frame — 1.93 m frame
Figure 2-8. Frame cabling routing path in rear of RS/6000 SP frame — 2.01 m frame
2-10
RS/6000 SP: SP Switch Service Guide
Содержание RS/6000 SP
Страница 1: ...RS 6000 SP SP Switch Service Guide GA22 7443 04 IBM...
Страница 2: ......
Страница 3: ...RS 6000 SP SP Switch Service Guide GA22 7443 04 IBM...
Страница 8: ...vi RS 6000 SP SP Switch Service Guide...
Страница 10: ...viii RS 6000 SP SP Switch Service Guide...
Страница 20: ...xviii RS 6000 SP SP Switch Service Guide...
Страница 70: ...2 14 RS 6000 SP SP Switch Service Guide...
Страница 90: ...4 8 RS 6000 SP SP Switch Service Guide...
Страница 92: ...SPS SPS 8 Switch assembly feature view 1 5 2 RS 6000 SP SP Switch Service Guide...
Страница 94: ...SPS SPS 8 Switch assembly feature view 2 5 4 RS 6000 SP SP Switch Service Guide...
Страница 96: ...SPS SPS 8 Switch assembly feature view 3 8 7 6 5 4 3 2 1 Air flow 5 6 RS 6000 SP SP Switch Service Guide...
Страница 99: ...Chapter 5 Parts catalog 5 9...
Страница 100: ...Multi switch frame F C 2030 1 5 10 RS 6000 SP SP Switch Service Guide...
Страница 102: ...5 12 RS 6000 SP SP Switch Service Guide...
Страница 106: ...A 4 RS 6000 SP SP Switch Service Guide...
Страница 110: ...X 4 RS 6000 SP SP Switch Service Guide...
Страница 113: ......
Страница 114: ...IBM GA22 7443 04...