– Paperpack of optional features license and key activation information (if
ordered)
Attention:
Retain this paperpack in a safe place. The transaction keys in
the paperpack are required for activation of optional features on the switch.
Once a feature is activated, its activation key is associated with a specific
product WWN and serial number.
Site preparation and installation requirements
The following conditions are required to ensure correct installation and operation.
Electrical requirements
For successful installation and operation of the switch, ensure that the following
electrical requirements are met:
v
The primary outlet is correctly wired, protected by a circuit breaker, and
grounded in accordance with local electrical codes.
v
The supply circuit, line fusing, and wire size are adequate, as specified by the
electrical rating on the switch nameplate.
v
The power supply standards are met. See “Power supply specifications” on page
40.
Attention:
To maximize fault tolerance, connect each power cord to a separate
power source.
Environmental requirements
For successful installation and operation of the switch, ensure that the following
environmental requirements are met:
v
At a minimum, adequate cooling requires that you install the switch with the
intake side facing the cool-air aisle. Exhaust is through the port side of the
switch.
v
All equipment in the rack should force air in the same direction to avoid intake
of exhaust air.
v
A maximum of 71.36 cubic meters/hour (42 cubic feet/minute) and a minimum
of 59.47 cubic meters/hour (35 cubic feet/minute) of air flow is available to the
air intake (with two power supplies).
v
The ambient air temperature does not exceed 40° C (104° F) while the switch is
operating.
Cabinet requirements
For successful installation and operation of the switch in a cabinet, ensure that the
following cabinet requirements are met:
v
The cabinet must be a standard EIA cabinet.
v
A cabinet space that is one rack unit (1U) high; 4.45 cm (1.75 inches) high and
48.3 cm (19 inches) wide.
v
The rack kit option for the switch uses rails that are slimmer than standard rails
to accommodate the slightly wider chassis. Be sure to use one of these kits. Do
not use standard rails to install the switch in a rack, they will not fit with the
switch.
v
The equipment in the cabinet is grounded through a reliable branch circuit
connection and maintain ground at all times. Do not rely on a secondary
connection to a branch circuit, such as a power strip.
6
SAN24B-5 Installation, Service, and User Guide
Содержание RedBooks SAN24B-5
Страница 2: ......
Страница 8: ...vi SAN24B 5 Installation Service and User Guide...
Страница 12: ...x SAN24B 5 Installation Service and User Guide...
Страница 14: ...xii SAN24B 5 Installation Service and User Guide...
Страница 24: ...xxii SAN24B 5 Installation Service and User Guide...
Страница 30: ...3 Power supply and fan assembly LED 6 Captive screw 4 SAN24B 5 Installation Service and User Guide...
Страница 50: ...24 SAN24B 5 Installation Service and User Guide...
Страница 58: ...32 SAN24B 5 Installation Service and User Guide...
Страница 64: ...38 SAN24B 5 Installation Service and User Guide...
Страница 70: ...44 SAN24B 5 Installation Service and User Guide...
Страница 78: ...52 SAN24B 5 Installation Service and User Guide...
Страница 81: ......
Страница 82: ...Part Number 98Y2647 Printed in USA GA32 2213 00 1P P N 98Y2647...