Installing the tier 2 management card
You can install this tier 2 CRU yourself or request IBM to install it, at no additional charge, under the
type of warranty service that is designated for the blade server. Use this procedure to install the
management card into the currently installed system board. If you are also installing a new system board,
you must complete this procedure before installing the new system board.
Attention:
Replacing the management card and the system board at the same time might result in the
loss of vital product data (VPD) and information concerning the number of active processor cores. If the
management card and system board must both be replaced, replace them one at a time. For further
assistance, contact your next level of support.
To install the management card, complete the following steps.
To install the management card, which is shown by
1
in Figure 27, complete the following steps:
1.
Read the documentation that comes with the management card, if you ordered a replacement card.
2.
Locate the connector on the currently installed system board into which the management card will
be installed. See “System-board connectors” on page 8 for the location.
3.
Touch the static-protective package that contains the management card to any
unpainted
metal
surface on the BladeCenter unit or any
unpainted
metal surface on any other grounded rack
component; then, remove the management card from its package.
4.
Insert the management card (as shown by
1
in Figure 27) and verify that the card is securely on
the connector and pushed down all the way to the main board.
5.
Were you sent to this procedure from the “Replacing the FRU system-board and chassis assembly”
on page 260 procedure?
Yes:
Return to the Return to the Replacing the system-board and chassis assembly procedure.
No:
Continue with the next step.
6.
Install and close the blade server cover. See “Installing and closing the blade server cover” on page
239.
Statement 21
CAUTION:
Hazardous energy is present when the blade server is connected to the power source. Always
replace the blade server cover before installing the blade server.
Figure 27. Installing the management card
256
Power Systems: Problem Determination and Service Guide for the IBM Power PS700 (8406-70Y)
Содержание PS700
Страница 1: ...Power Systems Problem Determination and Service Guide for the IBM Power PS700 8406 70Y GI11 9831 00 ...
Страница 2: ......
Страница 3: ...Power Systems Problem Determination and Service Guide for the IBM Power PS700 8406 70Y GI11 9831 00 ...
Страница 244: ...232 Power Systems Problem Determination and Service Guide for the IBM Power PS700 8406 70Y ...
Страница 281: ...d Click BladeCenter PS700 to display the list of downloadable files for the blade server Chapter 5 Configuring 269 ...
Страница 282: ...270 Power Systems Problem Determination and Service Guide for the IBM Power PS700 8406 70Y ...
Страница 293: ......
Страница 294: ... Printed in USA GI11 9831 00 ...