4.
Remove the shipping bracket that is on the left side of the rear of the system before you cable it. To
remove the shipping bracket, complete the following steps:
a.
Remove the two screws (
A
), as shown in Figure 10.
b.
Pull the bracket off of the system (
B
) and discard.
c.
Push the power supplies back into the system, ensuring that they are fully seated and latched.
Installing the cable-management arm
Use the procedure in this task to install the cable-management arm.
Figure 9. Release latches and server
Figure 10. Shipping bracket removal
Installing the server into a rack
9
Содержание PowerLinux 7R2
Страница 1: ...Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T GI11 9888 01...
Страница 2: ......
Страница 3: ...Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T GI11 9888 01...
Страница 6: ...iv Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T...
Страница 36: ...24 Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T...
Страница 57: ......
Страница 58: ...Part Number 00L5074 Printed in USA GI11 9888 01 1P P N 00L5074...