Figure 116. Installing the service access cover
4. Unlock the blue rail safety latches (A) as shown in Figure 117 on page 117 by pushing them inward.
Carefully push the system unit until it is 2.5-5 cm (1-2 in.) away from the rack.
Note: To allow enough room to attach the cable management arm, do not push the system unit all
the way into the rack.
116 Power Systems: System backplane
Содержание Power Systems 9223-22S
Страница 1: ...Power Systems System backplane for the 5105 22E 9008 22L 9009 22A 9009 22G 9223 22H or 9223 22S IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems System backplane...
Страница 18: ...or or or or 4 Power Systems System backplane...
Страница 138: ...124 Power Systems System backplane...
Страница 149: ......
Страница 150: ...IBM...