background image

DANGER: Multiple power cords. The product might be equipped with multiple AC power cords

or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and

power cables. (L003)

(L007)

CAUTION: A hot surface nearby. (L007)

(L008)

CAUTION: Hazardous moving parts nearby. (L008)

(L018)

 or 

CAUTION: High levels of acoustical noise are (or could be under certain circumstances) present.

Use approved hearing protection and/ or provide mitigation or limit exposure. (L018)

(L031)

x  Power Systems: Installing the IBM Power E1050 (9043-MRX)

Содержание Power E1050

Страница 1: ...Power Systems Installing the IBM Power E1050 9043 MRX IBM GI11 0003 00...

Страница 2: ...1110 and G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER10 processor and to all associated models Copyrig...

Страница 3: ...ling the server and connecting expansion units 11 Completing the server setup 12 Setting up a preinstalled server 15 Prerequisite for installing the preinstalled server 15 Completing inventory for you...

Страница 4: ...iv...

Страница 5: ...erordnung geeignet Laser safety information IBM servers can use I O cards or features that are fiber optic based and that utilize lasers or LEDs Laser compliance IBM servers may be installed inside or...

Страница 6: ...power attach the power cords to the outlets 5 For racks with a DC power distribution panel PDP restore the power from the Customer s DC power source and turn on the circuit breakers located in the PDP...

Страница 7: ...g or overcurrent protection To provide the correct power connection to a rack refer to the rating labels located on the equipment in the rack to determine the total power requirement of the supply cir...

Страница 8: ...ned at more than 10 degrees When the rack cabinet is in the new location complete the following steps Lower the four leveling pads Install stabilizer brackets on the rack cabinet or in an earthquake e...

Страница 9: ...sition read the installation instructions Do not put any load on the slide rail mounted equipment mounted in the installation position Do not leave the slide rail mounted equipment in the installation...

Страница 10: ...power cords and power cables L003 L007 CAUTION A hot surface nearby L007 L008 CAUTION Hazardous moving parts nearby L008 L018 or CAUTION High levels of acoustical noise are or could be under certain c...

Страница 11: ...exposure C026 CAUTION Data processing environments can contain equipment transmitting on system links with laser modules that operate at greater than Class 1 power levels For this reason never look i...

Страница 12: ...tended platform Only raise load if properly centered on platform Do not place more than 200 lb 91 kg on edge of sliding platform shelf also considering the load s center of mass gravity CoG Do not cor...

Страница 13: ...ing System GR 1089 CORE The following comments apply to the IBM servers that have been designated as conforming to NEBS Network Equipment Building System GR 1089 CORE The equipment is suitable for ins...

Страница 14: ...xiv Power Systems Installing the IBM Power E1050 9043 MRX...

Страница 15: ...e Hardware Management Console Support and downloads website https www14 software ibm com webapp set2 sas f hmcl home html Consider the following prerequisites before you install the server Procedure 1...

Страница 16: ...ide flange locator studs on the slide rail into the rear EIA mounting holes 5 Position the slam latch bracket to cover the front EIA space of the slide rail Note Each side of the slam latch bracket is...

Страница 17: ...t tool to install the system it is not necessary to remove components from the system chassis The following table lists the removal tasks you must perform so that you can lift the system and install i...

Страница 18: ...if you will have three people to lift the system onto the rails and into the rack To reduce the weight of the system so that three people can lift it perform the following tasks Note If you are using...

Страница 19: ...f the levers b Rotate the levers up and out to release the voltage regulator module from its connector c While holding the voltage regulator module by its levers pull upward to remove the voltage regu...

Страница 20: ...edure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface If not do so now 2 Remove the...

Страница 21: ...management bracket takes up three EIA units Three screws are used to attach each side of the cable management bracket to the rack flange Each screw goes in the middle hole of each of the three EIA ra...

Страница 22: ...ack To install the system into the rack complete the following steps Procedure 1 Extend the mounting hardware 2 Position one person in front of the system one person on the left side of the system and...

Страница 23: ...in the system b Gently push the voltage regulator module into its connector c Rotate the levers in and press down on the latches to secure the voltage regulator module in its slot 3 Replace the system...

Страница 24: ...not do so now 2 Ensure that the target slot is empty 3 Place the adapter component side up on a flat antistatic surface Attention A pin on the tailstock of the adapter resembles a removable screw Do n...

Страница 25: ...es in the 9043 MRX system To replace a power supply complete the steps in this procedure Procedure 1 Ensure that you have the electrostatic discharge ESD wrist strap on and that the ESD clip is plugge...

Страница 26: ...p by using an HMC with DHCP Perform these tasks to complete the server setup by using an HMC that uses a DHCP network configuration About this task Note Before you continue with this step ensure that...

Страница 27: ...g the server setup by using an HMC with a static network configuration Perform these tasks to complete the server setup by using an HMC that uses a static network configuration Procedure 1 Connect an...

Страница 28: ...necessary update your managed system firmware Select Actions Update Firmware System Firmware Update Completing the server setup without using the HMC To access the eBMC without using the HMC complete...

Страница 29: ...s task Note Before you install your preinstalled server ensure that Each power cable is firmly seated into a corresponding power distribution unit receptacle All the circuit breaker buttons on each PD...

Страница 30: ...cords and power distribution unit PDU for your preinstalled server Before you set up a console you must remove the shipping bracket and connect power cords About this task Attention Attach an electros...

Страница 31: ...pply c Use the hook and loop fastener and tie the power cord to the power supply handle 3 Repeat this procedure for each power supply that you removed 4 Replace the system top cover 5 Remove the syste...

Страница 32: ...for system service management monitoring maintenance and control The eBMC also provides access to the system event log files SEL The eBMC is a specialized service processor that monitors the physical...

Страница 33: ...Ethernet port assuming that T3 ETH1 is connected to the HMC 2 If you haven t already done so connect the power cables to the power supplies The panel displays 01 N 3 Press the up arrow key to select...

Страница 34: ...HMC 2 If you haven t already done so connect the power cables to the power supplies The panel displays 01 N 3 Press the up arrow key to select 02 and press Enter 4 Press Enter again A less than symbol...

Страница 35: ...b Select Add Static IPv4 Address c Enter your IP address gateway and subnet information d Click Add Installing the IBM Power E1050 9043 MRX 21...

Страница 36: ...22 Power Systems Installing the IBM Power E1050 9043 MRX...

Страница 37: ...oduct s and or the program s described in this publication at any time without notice Any references in this information to non IBM websites are provided for convenience only and do not in any manner...

Страница 38: ...st users who have a disability such as restricted mobility or limited vision to use information technology content successfully Overview The IBM Power servers include the following major accessibility...

Страница 39: ...deployed for this Software Offering provide you as the customer the ability to collect personally identifiable information from end users via cookies and other technologies you should seek your own le...

Страница 40: ...nforderungen der EU Richtlinie 2014 30 EU zur Angleichung der Rechtsvorschriften ber die elektromagnetische Vertr glichkeit in den EU Mitgliedsstaatenund h lt die Grenzwerte der EN 55022 EN 55032 Klas...

Страница 41: ...ormationen Das Ger t erf llt die Schutzanforderungen nach EN 55024 und EN 55022 EN 55032 Klasse A Japan Electronics and Information Technology Industries Association JEITA Notice This statement applie...

Страница 42: ...ssion FCC Notice This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable pr...

Страница 43: ...to reduce electromagnetic emissions to prevent interference to the reception of radio and television broadcasts Class B Notices The following Class B statements apply to features designated as electro...

Страница 44: ...ormit tszeichen CE zu f hren Verantwortlich f r die Einhaltung der EMV Vorschriften ist der Hersteller International Business Machines Corp New Orchard Road Armonk New York 10504 Tel 914 499 1900 Der...

Страница 45: ...by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit differe...

Страница 46: ...ay these publications or any portion thereof outside your enterprise without the express consent of IBM Rights Except as expressly granted in this permission no other permissions licenses or rights ar...

Страница 47: ......

Страница 48: ...IBM Part Number 03KG355 GI11 0003 00 1P P N 03KG355...

Отзывы: