background image

Power Systems

Installing the IBM Power 750
(8408-E8D)
and IBM PowerLinux 7R4 (8248-L4T)

GI11-9890-01

Содержание Power 750 Express 8408-E8D

Страница 1: ...Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T GI11 9890 01...

Страница 2: ......

Страница 3: ...Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T GI11 9890 01...

Страница 4: ...y Notices manual G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER7 processor and to all associated models C...

Страница 5: ...an ASCII terminal 19 Cabling the server to the Hardware Management Console 21 Cabling the server and accessing the Integrated Virtualization Manager 22 Cabling the server and accessing Operations Cons...

Страница 6: ...iv Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...

Страница 7: ...oduct The documentation contains the safety information in your national language with references to the U S English source Before using a U S English publication to install operate or service this pr...

Страница 8: ...ttached to this product to properly wired outlets v When possible use one hand only to connect or disconnect signal cables v Never turn on any equipment when there is evidence of fire water or structu...

Страница 9: ...e customer to ensure that the outlet is correctly wired and grounded to prevent an electrical shock CAUTION v Do not install a unit in a rack where the internal rack ambient temperatures will exceed t...

Страница 10: ...eight of the loaded rack cabinet Refer to the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet v Verify that all door openings are at least 760 x 230 mm 30 x 80...

Страница 11: ...This product might contain one or more of the following devices CD ROM drive DVD ROM drive DVD RAM drive or laser module which are Class 1 laser products Note the following information v Do not remove...

Страница 12: ...ation for NEBS Network Equipment Building System GR 1089 CORE The following comments apply to the IBM servers that have been designated as conforming to NEBS Network Equipment Building System GR 1089...

Страница 13: ...ower 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T since the previous update of this topic collection November 2013 The following updates have been made to the content v Added installation information...

Страница 14: ...ts that you ordered Note Your order information is included with your product You can also obtain order information from your marketing representative or the IBM Business Partner If you have incorrect...

Страница 15: ...steps 1 Select the appropriate EIA location unit number for the rails Each EIA location contains three 3 holes for mounting hardware For the purpose of these instructions each EIA set of holes are ide...

Страница 16: ...e 6 Repeat steps 1 through 5 for the left rail 7 Secure both rails to the front EIA support flange using two M5 x 16mm screws C 8 At the rear of the rack rotate the hinged rail latch upward to hold ea...

Страница 17: ...shipping bracket before you remove the processor assembly and install the system chassis 1 Remove the screws that attach the front shipping cover A to the system chassis and remove the front shipping...

Страница 18: ...system processor assembly weighs 45 lbs Use caution when you are sliding the system processor assembly out of the enclosure 1 Prepare to remove the system processor assembly a Using a slotted screwdri...

Страница 19: ...ith two people one on each side of the assembly lift the system processor assembly off of the rails by using both handles on each side Then move the assembly horizontally away from the rack to clear t...

Страница 20: ...k the rails D b Push both the rails E back into the enclosure Installing the chassis lift handles Install the removable system lift handles onto each side of the system chassis Figure 6 Removing syste...

Страница 21: ...08 E8D and IBM PowerLinux 7R4 8248 L4T systems into the rack The information provided is intended to promote safety and reliable operation CAUTION This system requires three people to install the syst...

Страница 22: ...Tilt the system into position over the rack rails c Carefully lower the system until the rear of the system rests on the rails Figure 9 Lifting the system by the lift handles 10 Power Systems Installi...

Страница 23: ...of the system from the bottom of the chassis 4 While the two people on either side are supporting the weight of the system have the person in front of the system remove the lift handles as shown in th...

Страница 24: ...o the rack 6 Install the screws A to secure the system to the rack Figure 11 Removing the lift handles Figure 12 Pushing the system into the rack 12 Power Systems Installing the IBM Power 750 8408 E8D...

Страница 25: ...5 x 16mm screws two on each bracket as shown in the following figure The tie down brackets ensure that the chassis is securely fastened to the rack Figure 13 Attaching the left and right tie down brac...

Страница 26: ...r assembly lift the system processor assembly by using both handles on each side b Position the system outside of the slide rails so that with the three pins on either side of the processor assembly a...

Страница 27: ...he handles C up and push them toward the enclosure until they lock into place c Tighten both of the captive screws D if present Note Do not overtighten the captive screws Figure 16 Installing the syst...

Страница 28: ...ck designs or of additional rack features or of additional customer hardware might prevent the installation of the cable management bracket 1 At the rear of the rack hold the cable management bracket...

Страница 29: ...http publib boulder ibm com infocenter systems scope hw topic p7hak p7hak_pciadapters_front_75x_76x htm for slot placement information Important If you are installing a new feature ensure that you hav...

Страница 30: ...18 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...

Страница 31: ...inux or VIOS Yes Ethernet or crossover cable Cabling the server to the Hardware Management Console on page 21 Integrated Virtualization Manager for VIOS AIX IBM i and Linux Yes Ethernet cable for netw...

Страница 32: ...e that your ASCII terminal is set to the following general attributes These attributes are the default settings for the diagnostic programs Be sure that your terminal is set according to these attribu...

Страница 33: ...appears in the HMC Code Level section including the HMC version release maintenance level build level and base versions To cable the server to the HMC complete the following steps 1 If you want to dir...

Страница 34: ...ation area expand Power Restart Control 2 Click Power On Off System 3 Select Boot to SMS menu in the AIX or Linux partition mode by boot field 4 If you are installing the Integrated Virtualization Man...

Страница 35: ...tting up Operations Console complete the following steps 1 Install IBM i Access for Windows and the latest service pack Note The list of Microsoft Windows operating systems supported for Operations Co...

Страница 36: ...ss by doing the following types 1 Give your session a name The name should be one of the following v A valid host name that was registered in the site DNS for the console IP address v A unique name yo...

Страница 37: ...the power on stops at A6005008 leave the server in this state and call your IBM service provider for assistance Note You should configure and start an IBM i TCP interface on a second port T2 T3 T4 pr...

Страница 38: ...ote This system is equipped with two power supplies If you want to configure the system with redundant power supplies you must connect each power cable to its own power source 3 Plug the system power...

Страница 39: ...DC Out indicator lights on the power supplies are flashing If none of the indicators are flashing check the power cord connections 3 Power on the managed system 4 Install and update an operating syst...

Страница 40: ...red update your managed system firmware levels In the navigation area click Updates c In the contents area select your managed system d Click Change Licensed Internal Code for the current release 7 Po...

Страница 41: ...r systems scope hw topic p7hby connect_asmi htm b On the ASMI Welcome pane note the existing level of server firmware in the upper right corner under the copyright statement c Update the time of day I...

Страница 42: ...30 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...

Страница 43: ...Verify that you have a rack You must first have a rack installed If you do not have a rack installed see Installing the rack http publib boulder ibm com infocenter systems scope hw topic p7hbf instal...

Страница 44: ...ed For instructions see Connecting the monitor keyboard and mouse to the system on page 25 Cable the system and set up a console interface or terminal For instructions see Cabling the server and setti...

Страница 45: ...ated information Remove the orange shipping covers on the front of the system P7EEY508 0 Figure 19 Remove the shipping cover on the front of the system Remove the shipping brackets on the rear of the...

Страница 46: ...information Remove the shipping brackets on the rear of the system Figure 21 Remove the shipping bracket Remove the shipping brackets on the rear of the system Figure 22 Remove the shipping bracket 3...

Страница 47: ...ets on the rear of the system Figure 23 Remove the shipping bracket Note Ensure that you fully seat the server power supplies after removing the rear shipping bracket Install the cable management brac...

Страница 48: ...d setting up the console on page 19 Connect the power cables to the system and apply power For instructions see Connecting the power cables to the system on page 25 Complete the server setup For instr...

Страница 49: ...ox in the Security category and click OK 3 Connect an Ethernet cable from the PC or notebook to the Ethernet port labeled HMC1 on the back of the managed system If HMC1 is occupied connect an Ethernet...

Страница 50: ...cedures describe setting the IP address on a PC or notebook running the Linux operating system and the Microsoft Windows XP 2000 and Vista operating systems You will need the information that you reco...

Страница 51: ...ded in Accessing the ASMI by using a web browser on page 36 topic 7 In the Local Area Connection Properties window click OK It is not necessary to restart your PC Correcting an IP address If you attac...

Страница 52: ...ing On Off or flashing On Power is being applied but the power supply is not functioning properly and the system is in standby mode On On Off or flashing On Power is being applied but the power supply...

Страница 53: ...following order 1 System power control network SPCN cables 2 Power cables 3 Communications serial attached SCSI InfiniBand remote input output and peripheral component interconnect express cables Not...

Страница 54: ...r v When routing cables leave enough slack around the power connection on the power distribution unit PDU so that the wall to PDU line cord can be attached to the PDU v Use hook and loop fasteners whe...

Страница 55: ...and or changes in the product s and or the program s described in this publication at any time without notice Any references in this information to websites not owned by the manufacturer are provided...

Страница 56: ...tical operations Users should periodically check the manufacturer s support websites for updated information and fixes applicable to the system and related software Homologation statement This product...

Страница 57: ...2 this device must accept any interference received including interference that may cause undesired operation Industry Canada Compliance Statement This Class A digital apparatus complies with Canadia...

Страница 58: ...iation JEITA Confirmed Harmonics Guideline products less than or equal to 20 A per phase Japanese Electronics and Information Technology Industries Association JEITA Confirmed Harmonics Guideline with...

Страница 59: ...Vertr glichkeit Dieses Produkt entspricht den Schutzanforderungen der EU Richtlinie 2004 108 EG zur Angleichung der Rechtsvorschriften ber die elektromagnetische Vertr glichkeit in den EU Mitgliedsst...

Страница 60: ...tlich f r die Einhaltung der EMV Vorschriften ist der Hersteller International Business Machines Corp New Orchard Road Armonk New York 10504 Tel 914 499 1900 Der verantwortliche Ansprechpartner des He...

Страница 61: ...complies with Part 15 of the FCC rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received in...

Страница 62: ...dustries Association JEITA Confirmed Harmonics Guideline with Modifications products greater than 20 A per phase IBM Taiwan Contact Information Electromagnetic Interference EMI Statement Korea Germany...

Страница 63: ...r International Business Machines Corp New Orchard Road Armonk New York 10504 Tel 914 499 1900 Der verantwortliche Ansprechpartner des Herstellers in der EU ist IBM Deutschland GmbH Technical Regulati...

Страница 64: ...xcept in full compliance with all applicable laws and regulations including all United States export laws and regulations IBM MAKES NO GUARANTEE ABOUT THE CONTENT OF THESE PUBLICATIONS THE PUBLICATION...

Страница 65: ......

Страница 66: ...Part Number 00L5075 Printed in USA GI11 9890 01 1P P N 00L5075...

Отзывы: