Attention:
You must install the screw to secure the device.
5.
Return to the front of the rack. Ensure the latch is still open on the front of the slide rail. Refer, step 1
on page 5.
6.
Pull the slide rail forward and insert three pins on the front of the rail into the holes within the
selected U that were previously marked. Lower the slide rail down
(1)
to engage the hook feature on
the middle pin, as shown in Figure 6.
7.
While pulling the slide rail forward, ensure that all three pins protrude through the rack holes, then
push the front latch
(2)
all the way in, as shown in Figure 7.
Note:
If you need to reposition the rail, release the front latch
(2)
, and while pressing the blue pin at
the bottom, push the rail toward the rear to release from the rack.
Figure 5. Reinstalling the screw
Figure 6. Front rail of the rack with pins seated
Figure 7. Front rail of the rack with latch seated
Installing the server into a rack
7
Содержание POWER 730
Страница 2: ......
Страница 6: ...iv Power Systems Installing the IBM Power 710 Express 8231 E1C or IBM Power 730 Express 8231 E2C...
Страница 36: ...24 Power Systems Installing the IBM Power 710 Express 8231 E1C or IBM Power 730 Express 8231 E2C...
Страница 57: ......
Страница 58: ...Part Number 00L5066 Printed in USA GI11 9861 03 1P P N 00L5066...