11.
Remove
the
memory
books
(and
blanks
if
applicable).
See
12.
Remove
the
four
fan
assemblies.
See
13.
Remove
the
fan
chassis.
See
14.
Remove
the
MCM
modules.
See
15.
Remove
the
L3
modules.
See
16.
Remove
the
clock
card.
See
17.
Remove
the
media
chassis.
See
18.
Remove
two
frame
extender
mounting
bolts
from
EIA
position
17
(10-mm
bolt).
19.
Remove
the
UEPO
switch.
See
20.
Using
an
8-mm
extension
socket,
remove
the
screws
attaching
the
hold-down
bracket
to
the
vertical
EIA
rails
at
the
rear
of
the
system.
Remove
the
bracket
and
store
it
in
a
safe
place.
Note:
The
rear
screws
are
used
to
mount
the
hold-down
bracket.
21.
Using
an
8-mm
extension
socket,
remove
the
screws
attaching
the
chassis
to
the
vertical
EIA
rails
at
the
front
of
the
system.
22.
Position
the
lift
tool
at
the
front
of
the
rack,
and
ensure
that
the
extender
arms
on
the
lift
plate
are
on
the
side
facing
the
frame.
Align
the
lift
tool
such
that
processor
subsystem
chassis
will
not
be
blocked
(at
the
lip
of
the
orange
lift
plate)
from
removal.
23.
Raise
the
plate
to
a
height
such
that
the
lift
plate
is
just
below
the
base
of
the
processor
subsystem
chassis.
Release
the
pins
on
the
lift
plate,
and
fully
extend
the
center
portion
of
the
plate
toward
the
processor
subsystem
chassis
and
lock
it
in
place.
Release
pins
on
the
extender
arms
and
position
them
on
both
left
and
right
side,
arms
must
fit
around
the
frame
extenders
and
lock
in
place
(do
not
adjust
the
lift
tool
once
these
arms
are
locked
in
place).
Engage
the
lift
tool
brake.
Install
wheel
chocks
on
lift
tool
casters.
Note:
When
you
attach
the
arms
to
the
frame,
ensure
that
any
cables
are
clear
of
the
extender
arms.
24.
One
person
should
gently
push
the
processor
subsystem
chassis
toward
the
tool
from
the
rear
of
the
system
(do
not
bend
the
vertical
processor-subsystem
chassis
support
bars).
Two
people
should
gently
pull
and
guide
the
processor
subsystem
chassis
onto
the
lift
plate.
The
processor
subsystem
chassis
must
be
removed
far
enough
to
clear
the
front
face
of
the
frame.
Use
the
tie-down
strap
to
hold
the
processor
subsystem
chassis
to
the
lift
plate.
Retract
the
extender
arms
and
center
portion
of
lift
plate.
25.
Lower
the
processor
subsystem
chassis
to
the
bottom
position
of
the
lift
tool.
26.
Remove
the
wheel
chocks
and
release
the
brake.
Flip
the
crank
handle
180
degrees.
Carefully
move
the
lift
tool
with
the
processor
subsystem
chassis
to
the
staging
area.
The
brake
and
wheel
chocks
must
be
in
place
when
transferring
the
processor
subsystem
chassis
to
or
from
the
packaging
material.
Replacement
Note:
If
you
are
replacing
this
assembly
with
a
new
assembly,
the
manufacturing
label
with
the
machine
type,
model
number,
and
the
serial
number
for
the
subsystem
must
be
ordered
to
apply
to
the
new
part.
For
information
on
replacement
labels,
see
Attention:
Look
for
small
amounts
of
debris
on
the
connecting
surfaces
between
the
backplane
and
processor
modules.
Mating
the
two
surfaces
is
critical
for
the
processor
to
function
properly.
1.
Position
the
lift
tool
such
that
the
new
processor
subsystem
chassis
can
be
moved
onto
the
lift
plate.
2.
Install
the
wheel
chocks
and
engage
the
brake.
Chapter
9.
Removal
and
Replacement
Procedures
925
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 2: ......
Страница 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 12: ...x Eserver pSeries 690 Service Guide...
Страница 14: ...xii Eserver pSeries 690 Service Guide...
Страница 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Страница 357: ...Step 1543 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 341...
Страница 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Страница 365: ...Step 1546 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 349...
Страница 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Страница 430: ...414 Eserver pSeries 690 Service Guide...
Страница 798: ...782 Eserver pSeries 690 Service Guide...
Страница 868: ...Media Subsystem Internal Cables 1021 p690 Cable Installation and Management 1022 852 Eserver pSeries 690 Service Guide...
Страница 910: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 898 894 Eserver pSeries 690 Service Guide...
Страница 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Страница 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Страница 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Страница 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Страница 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Страница 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Страница 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Страница 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Страница 1090: ...1074 Eserver pSeries 690 Service Guide...
Страница 1094: ...1078 Eserver pSeries 690 Service Guide...
Страница 1109: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 1093...
Страница 1122: ...1106 Eserver pSeries 690 Service Guide...
Страница 1123: ...Appendix E Ground Path The ground path for the pSeries 690 is shown in the following figure 1107...
Страница 1124: ...1108 Eserver pSeries 690 Service Guide...
Страница 1132: ...1116 Eserver pSeries 690 Service Guide...
Страница 1133: ......
Страница 1134: ...Printed in U S A February 2004 SA38 0589 05...