I/O
Subsystem
Chassis
Removal
Attention:
This
process
requires:
v
The
use
of
a
lift
tool
(part
number
09P2481)
and
lift-plate
assembly
tool
(part
number
11P4369).
v
The
lift
tool
wheels
must
be
chocked
to
prevent
the
chassis
from
moving
during
the
operation.
The
frame
must
not
be
on
its
casters,
the
leveling
pads
must
be
engaged
to
prevent
the
frame
from
moving
during
the
operation.
1.
Read
all
safety
instructions
before
performing
this
operation.
Unpack
lift
tool
and
follow
assembly
instructions
included
with
the
tool.
Inspect
the
tool
for
damage
(do
not
perform
the
remove
procedure
with
a
damaged
lift
tool).
Replace
the
blue
lift
plate
with
the
orange
lift
plate
(P/N
11P4369).
Orient
two
round
holes
in
lift
plate
to
the
side
of
the
lift
tool
that
will
be
closest
to
the
frame.
2.
Turn
off
power
as
described
in
3.
Unplug
all
power
cables
from
the
line
power
source.
Attention:
Because
this
procedure
is
performed
with
power
removed
from
the
system,
references
to
using
the
white
or
green
service
buttons
on
the
UEPO
switch
do
not
apply
during
the
remainder
of
this
procedure.
4.
Open
the
rack
doors
and
remove
them
from
the
rack.
5.
Remove
the
I/O
subsystem
front
cover.
6.
If
your
system
is
configured
with
a
half
I/O
drawer
filler
plate,
remove
the
filler
plate.
7.
Verify
that
all
cables
are
labeled.
If
not,
then
label
all
cables
and
components
along
with
their
location
at
the
front
and
rear
of
your
system.
8.
Remove
all
DASD
hard
disk
drives
or
DASD
fillers
as
described
in
the
removal
section
of
9.
Remove
all
DASD
4-pack
or
4-pack
filler
assemblies
as
described
in
the
removal
section
of
10.
Remove
all
DCA
units
as
described
in
the
removal
section
of
11.
Remove
all
I/O
subsystem
fan
assemblies
as
described
in
the
removal
section
of
12.
Remove
all
PCI
adapter
cassettes
as
described
in
the
removal
section
of
13.
Remove
the
I/O
backplanes
(up
to
2)
as
described
in
the
removal
section
of
14.
Remove
the
screws
that
attach
the
I/O
subsystem
chassis
to
the
rack.
15.
Position
the
lift
tool
at
the
front
of
the
rack.
Align
the
lift
tool
so
that
I/O
subsystem
chassis
will
not
be
blocked
(at
the
lip
of
the
orange
lift
plate)
from
removal.
Install
wheel
chocks
on
the
lift
tool
casters.
Engage
the
lift
tool
brake.
16.
Raise
the
plate
to
a
height
such
that
the
lift
plate
is
just
below
the
base
of
the
I/O
subsystem
chassis
you
are
removing.
Release
pins
on
the
extender
arms
and
position
them
on
both
left
and
right
side.
Arms
must
fit
around
the
frame
extenders
and
lock
in
place
(do
not
adjust
the
lift
tool
after
these
arms
are
locked
in
place).
17.
One
person
should
gently
pull
and
guide
the
I/O
subsystem
chassis
onto
the
lift
plate.
The
I/O
subsystem
chassis
must
be
removed
far
enough
to
clear
the
front
face
of
the
frame.
Retract
the
extender
arms.
18.
Lower
I/O
subsystem
chassis
to
the
bottom
position
of
the
lift
tool.
19.
Remove
the
wheel
chocks
and
release
the
brake.
Flip
the
crank
handle
180
degrees.
Carefully
move
the
lift
tool
with
the
I/O
subsystem
chassis
to
the
staging
area.
The
brake
and
wheel
chocks
must
be
in
place
when
transferring
the
I/O
subsystem
chassis
to
or
from
the
packaging
material.
1014
Eserver
pSeries
690
Service
Guide
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 2: ......
Страница 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 12: ...x Eserver pSeries 690 Service Guide...
Страница 14: ...xii Eserver pSeries 690 Service Guide...
Страница 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Страница 357: ...Step 1543 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 341...
Страница 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Страница 365: ...Step 1546 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 349...
Страница 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Страница 430: ...414 Eserver pSeries 690 Service Guide...
Страница 798: ...782 Eserver pSeries 690 Service Guide...
Страница 868: ...Media Subsystem Internal Cables 1021 p690 Cable Installation and Management 1022 852 Eserver pSeries 690 Service Guide...
Страница 910: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 898 894 Eserver pSeries 690 Service Guide...
Страница 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Страница 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Страница 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Страница 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Страница 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Страница 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Страница 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Страница 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Страница 1090: ...1074 Eserver pSeries 690 Service Guide...
Страница 1094: ...1078 Eserver pSeries 690 Service Guide...
Страница 1109: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 1093...
Страница 1122: ...1106 Eserver pSeries 690 Service Guide...
Страница 1123: ...Appendix E Ground Path The ground path for the pSeries 690 is shown in the following figure 1107...
Страница 1124: ...1108 Eserver pSeries 690 Service Guide...
Страница 1132: ...1116 Eserver pSeries 690 Service Guide...
Страница 1133: ......
Страница 1134: ...Printed in U S A February 2004 SA38 0589 05...