Contents
Data Integrity and Verification
Chapter 1. Setting Up the System .
Step 2. Observe this Safety Notice During Installation .
Step 3. Checking the Customer Environment .
Step 4. Checking Customer Outlets
Step 5. Setting Up Rails in the Rack .
Step 6. Installing Drawers in the Rack
Step 7. Connecting JTAG and VS/COMM Cables
CEC Drawer Attached to one I/O Drawer .
Step 8. Connecting RIO and SPCN Cables
CEC Drawer Attached to One I/O Drawer .
CEC Drawer Attached to Two I/O Drawers.
CEC Drawer Attached to One I/O Drawer .
CEC Drawer Attached to Two I/O Drawers.
Step 9. Setting Up Attached Devices
Step 10. Updating the Device Records .
Step 11. Attaching External Devices .
Step 12. Connecting the Power .
Step 14. Starting the Operating System
Step 15. Running System Verification .
Chapter 2. Verifying the Hardware Operation .
Step 1. Considerations Before Running This Procedure .
Step 2. Loading the Diagnostics .
Step 3. Running System Verification .
Step 4. Performing Additional System Verification
Step 5. Stopping the Diagnostics .
Chapter 3. Installing Options for the System .
Handling Static-Sensitive Devices
iii
Содержание eserver p Series
Страница 5: ...Index 57 Contents v...
Страница 6: ...vi Installation Guide...
Страница 10: ...x Installation Guide...
Страница 12: ...xii Installation Guide...
Страница 22: ...Detail B Right Rail Detail A Left Rail Detail C Rear of Left Rail A B C 8 Installation Guide...
Страница 36: ...22 Installation Guide...
Страница 56: ...42 Installation Guide...
Страница 58: ...44 Installation Guide...
Страница 60: ...46 Installation Guide...
Страница 66: ...52 Installation Guide...
Страница 75: ......
Страница 76: ...IBMR Part Number 09P4055 Printed in U S A June 2001 SA38 0575 03 1P P N 09P4055...