10.
To put the cable management bracket in the service position, complete the following steps:
a.
Pull out the quarter-turn fasteners (B) and turn them to disengage them while you lift the cable
management bracket (A) to its raised position (1).
b.
Turn the quarter-turn fasteners (B) to engage and lock the bracket into position.
P8EGP505-1
C
B
A
Figure 11. Installing the cable management bracket
14
Power Systems: Installing the EMX0 PCIe Gen3 I/O expansion drawer
Содержание EMX0 PCIe3
Страница 1: ...Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer GI11 9914 04 IBM...
Страница 2: ......
Страница 3: ...Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer GI11 9914 04 IBM...
Страница 6: ...iv Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 16: ...xiv Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 58: ...42 Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 70: ...54 Power Systems Installing the EMX0 PCIe Gen3 I O expansion drawer...
Страница 71: ......
Страница 72: ...IBM Part Number 01LK530 Printed in USA GI11 9914 04 1P P N 01LK530...