Energy efficiency is a big issue today and for the foreseeable future. Moving from racks to blades can help you optimize 
your resources. Data centers limited by aging servers can realize efficiencies with BladeCenter over rack-based servers: 

 

Up to 50% more servers in the same amount of space 

 

Using as much as 30-40% less power than rack servers 

 

Emitting less heat 

 

Less airflow required per server 

Flexibility 
and choice 

IBM has the broadest ecosystem of solution providers in the blade market. Myriad of software, security, specialized 
applications, I/O expansion cards, SAN switching, networking and high-performance interconnects let us provide you 
with comprehensive blade solutions––giving you more choices and flexibility. In fact, the IBM ecosystem is one of the 
things that sets us apart from the competition. Since IBM opened the BladeCenter specifications in 2004, nearly 100 
companies began producing solutions for BladeCenter, ultimately giving you even more choices for the future. 

Cable 
reduction 

With BladeCenter, you can have up to 82% fewer cables than with rack servers, which can mean dramatically lower 
costs and less complexity. Reduced complexity means less to manage during install and fewer components that can 
potentially cause problems. Remember, each cable has three potential points of failure: two connectors and the cable 
itself. 

Centralized 
management 

Management at the chassis level can save time over managing rack servers individually. A single login to a BladeCenter 
Management Module gives administrators access to the entire solution, consisting of chassis, blades, and modules, not 
just one component of it. 

Resiliency 

BladeCenter was designed to greatly reduce single points of failure. Reliability features include: 

 

Redundant, hot-swap cooling, power, management and I/O switches in the chassis. 

 

A high-availability midplane providing redundant paths to the network. (See Availability below.) 

 

Redundant connections for power and I/O on the back of each blade. 

 

Fewer moving parts. Fewer moving parts mean fewer components to fail and potentially better reliability. 

 

Light path diagnostics, which can indicate problems with the chassis, blades, power supplies, switches––and for 
parts inside the individual blades––even before a problem occurs. It can also light the path to a fix for easy service, 
even after the blade is removed or power is turned off. 

Additionally, BladeCenter has a four-year proven track record of enterprise operation. 

Availability 

Two connections to the midplane are inherent in the BladeCenter design. This means dual communication paths from 
the blades to the Ethernet, Fibre Channel, KVM, power and management signals, for higher availability. For example, if 
something happened to a connector on the blade, all the servers can stay up and running. Bringing the whole solution 
together means that extra care must be taken to avoid single points of failure. While other blade vendors talk about this 
concept, IBM has embraced it in the BladeCenter design. 

Lower 
acquisition 
cost 

Equally configured, fourteen blades with servers, switches, HBAs and cables can be substantially less expensive than 
the 1U alternative. 

 

Virtualization 

Consolidation from competitive rack servers to BladeCenter presents the opportunity to create an efficient and optimized 
infrastructure through virtualization and IBM Virtual Fabric Architecture. With virtualization, individual physical servers can 
be configured as multiple virtual servers, each capable of running its own operating system and applications. Running 
more applications per server means placing more demands on the system. IBM BladeCenter is excellent for a virtualized 
environment because many blades can support up to 12 I/O ports and clients can deploy high-speed 10Gb Ethernet––at 
up to 65% savings vs. rack servers. This is because compared to rack servers, BladeCenter offers: 

 Lower-cost 

switch 

ports 

 Fewer 

cables 

 

Lower HBA costs 

 

No need for XFPs 

When you migrate from racks to blades, also consider BladeCenter for client consolidation. With IBM’s Virtual Client 
solution, users are able to enjoy all the benefits and personal control of a stand-alone desktop—including print 
capabilities, USB drive support and audio—while reducing many of the challenges related to current stand-alone desktop 
environments. These include limiting susceptibility to theft and viruses, ease of new-user deployment, eliminating 
extended downtime during a hard-drive failure and eliminating the need to rebuild user preferences and settings after 
each client refresh. 

 

Please see the Legal Information section for important notices and information. 

34.

Содержание E

Страница 1: ...ice easy to configure IBM BladeCenter E Best energy efficiency best density IBM BladeCenter T Ruggedized IBM BladeCenter H High performance IBM BladeCenter HT Ruggedized high performance IBM BladeCent...

Страница 2: ...nter Chassis Positioning 4 IBM BladeCenter Chassis 6 BladeCenter I O Modules 30 Rack vs Blades Positioning 33 Citrix Solution 37 Virtualization Solution 38 Please see the Legal Information section for...

Страница 3: ...priate interconnect using a common management point and 5 I O fabrics to choose from Extract the most from your third party management solutions by utilizing the BladeCenter Open Fabric Manager It s c...

Страница 4: ...prise class storage Auto sensing 110V or 220V power Lowest IT staff requirements Lowest total power consumed Lowest total heat output IBM BladeCenter E BladeCenter E is the core chassis perfect for ma...

Страница 5: ...d DC power input Planned availability through 2011 Compare all this flexibility to what HP has to offer Customer Need IBM Answer HP Answer Small office or remote location BladeCenter S BladeSystem c C...

Страница 6: ...witches bridges BladeCenter H or 8 switches bridges BladeCenter HT internally The BladeCenter S designed for SMB and mid market customers takes integration to a new level combining up to 12 hot swap S...

Страница 7: ...ss hot spots in the data center Cool Blue s Active Energy Manager also provides an industry unique capability to virtualize power capping and move it from one server to another as required This capabi...

Страница 8: ...be contacted with resolutions to problems when they occur Availability and Serviceability BladeCenter chassis are designed for operation with greatly reduced potential for single points of failure Mo...

Страница 9: ...chassis One module bay for hot swap Advanced Management Module The management module provides advanced systems management and KVM capabilities for not only the chassis itself but for all of the blades...

Страница 10: ...cables BladeCenter E is a 7U chassis that provides Reduced single points of failure Many major components either standard or optionally are hot swappable and or redundant Servers and modules can be co...

Страница 11: ...InfiniBand or other switches can be installed per chassis up to 24 switches can be installed per rack without having to reserve any U space for the switches unlike the competition And the integrated s...

Страница 12: ...ontaining an optional DVD CD read only or CVD CD multi burner drive two USB 2 0 ports and a light path diagnostic panel The media tray is shared by all the blades in the server This reduces unnecessar...

Страница 13: ...stand alone System x rack and tower servers The features of the Management Module can be accessed either locally or remotely across a network One module comes standard A second Management Module can b...

Страница 14: ...pansion Units in combination with the blade servers using the same blade slots Up to three chassis can be installed in an industry standard 42U rack for a total of up to 36 30mm blade servers per rack...

Страница 15: ...the competition And the integrated switches may be less expensive than external self powered switches Plus the number of power distribution units PDUs needed per rack may be lessened because there ar...

Страница 16: ...ers handle the entire load You can replace a fan module without shutting down the BladeCenter system These modules draw only 60W between them 100W in the BladeCenter HT chassis By contrast some compet...

Страница 17: ...ear locking doors and lockable wheels so it can be moved where it is needed The Office Enablement Kit includes 4U of additional space besides the BladeCenter S chassis to leave room for storage KVM an...

Страница 18: ...so available are remote installation configuration and usage support for both System x and BladeCenter hardware and software as well as onsite custom services to provide the level of expertise you req...

Страница 19: ...5 ports None of serial breakout ports None standard 6 using optional Serial Passthru Module of parallel ports None of mouse ports None USB attached of keyboard ports None USB attached of USB ports 4 2...

Страница 20: ...o ports 1 on Management Module of blade slots orientation 14 x 30mm or 7 x 60mm or combinations thereof vertical of switch module bays 4 hot swap redundant Switch modules standard None in standard cha...

Страница 21: ...2 BTUs hr 686W min 18 680 BTUs hr 5478W max of blower modules standard max 2 4 hot swap redundant Blower module airflow front to back 250 CFM at 25 C 455 CFM at 32 C or greater Dimensions HWD weight 1...

Страница 22: ...nations thereof vertical Fabric bandwidth 10Gbps Total of switch bridge module slots 10 includes the following of dedicated Gb Ethernet switch module bays 2 hot swap redundant of dedicated bridge modu...

Страница 23: ...H 17 4 442mm W 28 0 711mm D 41 159 kg 90 350 lbs Length of limited warranty 3 years parts and labor onsite BladeCenter T Chassis Images Front View Rear View BladeCenter T Chassis Specifications Machin...

Страница 24: ...n Media Tray Predictive Failure Analysis support Blades switch modules I O mod odules power modules blower ules management m modules media tray Power supply size standard 1300W DC 8 V nominal 1300W AC...

Страница 25: ...er 4 switch or 4 bridge modules or 2 of each of high speed switch module bays 4 hot swap redundant of management modules std max 1 2 Systems management controller BladeCenter Advanced Management Modul...

Страница 26: ...ladeCenter T BladeCenter HT Rack form factor 7U 7U 9U 8U 12U Supports deskside use Yes with optional Office Enablement Kit Rack only Rack only Rack only Rack only of blades supported 6 x 30mm 3 x 60mm...

Страница 27: ...CFM per module 95 CFM per module at 25 C 190 CFM per module at 40 C or greater Storage methods supported Shared chassis server blade expansion blade Server blade expansion blade Server blade expansio...

Страница 28: ...elligent Gb Ethernet Switch No Yes Yes Yes Yes 1 32R1888 Cisco Systems Intelligent Gb Fiber Ethernet Switch No Yes Yes Yes Yes 1 39Y9267 Nortel 10G Ethernet Switch Module for IBM BladeCenter No No No...

Страница 29: ...Switch Module No Yes Yes Yes Yes 3 32R1904 QLogic 10 port 4Gb Fibre Channel Switch No Yes Yes Yes Yes 2 43W6724 QLogic 10 port 4Gb Fibre Channel Switch Yes Yes Yes Yes Yes 2 43W6725 QLogic 20 port 4Gb...

Страница 30: ...ink Fast Spanning Tree Multiple and Rapid Spanning Tree Router Redundancy Protocol VRRP and Equal Cost Multiple Routing ECMP for OSPF Standard based VLANs for traffic segregation Advanced filtering Su...

Страница 31: ...separation between the server and networking domains is preferred Fibre Channel Brocade 10 and 20 Port SAN Switch Modules Enables high performance end to end 1 2 and 4Gbps SAN solutions for the data c...

Страница 32: ...ers rapid provisioning and real time re hosting of server and network interfaces with policy based utilization and high availability rules Cisco InfiniBand Switch Module for IBM BladeCenter Allows the...

Страница 33: ...ment BladeCenter offers higher density and potentially lower total cost of ownership with no sacrifice in performance Clients can now combine the IBM BladeCenter Storage and I O Expansion Blade with a...

Страница 34: ...for parts inside the individual blades even before a problem occurs It can also light the path to a fix for easy service even after the blade is removed or power is turned off Additionally BladeCenter...

Страница 35: ...ted to external storage IBM delivers a wide range of easy to install tested external storage products to meet your demanding business needs Network attached storage NAS IBM System Storage N series NAS...

Страница 36: ...rvers within one infrastructure Are looking to reduce system administration costs through consolidation and more efficient remote management Stay with rack servers if you Have few servers and are not...

Страница 37: ...sentation Manager v4 5 at no extra cost from Citrix Optimize the heat power and space requirements of a Presentation Manager farm Reduced management overhead vs running hundreds of servers Which metho...

Страница 38: ...u can run your heterogeneous interactive business applications by day and your maintenance inventory or computational programs at night With our portfolio of System x and BladeCenter servers your virt...

Страница 39: ...ions they want but with better security manageability and at a much lower total cost of ownership than a PC Middleware IBM Director is an integrated easy to use suite of tools that provide customers w...

Страница 40: ...notice References in this publication to IBM products or services do not imply that IBM intends to make them available in all countries in which IBM operates IBM PROVIDES THIS PUBLICATION AS IS WITHOU...

Отзывы: