Attention:
v
For reliable operation do not use Ground Fault Circuit Interrupter (GFCI), Earth
Leakage Circuit Breaker (ELCB), or Residual Current Circuit Breaker (RCCB)
type circuit breakers with the storage system. The storage system is certified for
safe operation and compliant with IEC, EN, UL, and CSA 60950-1 standards. If
local electrical practice requires leakage detection circuit breakers, they must be
rated at minimum to 15 mA or larger to reduce the risk of outage due to
spurious actuation.
v
Do not exceed the wire rating of the facility and ensure that separate protected
branch circuits are used for each cord in planning for redundancy.
Power consumption and environmental information
When you are planning to meet the power requirements, consider the power
consumption and other environmental points of the storage system.
Note:
The power consumption for the operating disk enclosure is typically 275
watts - 300 watts. The power consumption for the operating High Performance
Flash Enclosure Gen2 is 500 watts.
Table 37. Power consumption and environmental information for the DS8882F model 983
Measurement
Unit of measure
Model 983
Peak electric power
1, 2
kilovolt amperes (kVA)
3.0
Thermal load
British thermal units (BTU) per hour
7236
Capacity of exhaust
cubic meters per minute (cubic feet
per minute or CFM)
44.2
(1500)
Ground leakage current
milliamperes (mA)
11
Startup current
amperes (A or amp)
≤
100
Startup current duration
microseconds (µs or µsec)
< 200
Acoustic declaration
Table 38. Acoustic declaration for fully configured version 8.5 storage system
Model
Declared A-weighted sound
power level, LWAd (B)
1, 4
Declared A-weighted sound
pressure level, LpAm (dB)
2, 3, 4
Operating
Idling
Operating
Idling
Model 983
7.9
7.9
62
61
Notes:
1.
LWAd is the statistical upper-limit A-weighted sound power level (rounded to the
nearest 0.1 B).
2.
LpAm is the mean A-weighted emission sound pressure level that is measured at the
1-meter bystander positions (rounded to the nearest dB).
3.
10 dB (decibel) = 1 B (bel).
4.
All measurements made in conformance with ISO 7779 and declared in conformance
with ISO 9296.
Planning for environmental requirements
You must install your storage system in a location that meets the operating
environment requirements for correct maintenance.
Chapter 6. Delivery and installation requirements
95
Содержание DS8882F
Страница 34: ...24 DS8882F Introduction and Planning Guide...
Страница 46: ...36 DS8882F Introduction and Planning Guide...
Страница 70: ...60 DS8882F Introduction and Planning Guide...
Страница 86: ...76 DS8882F Introduction and Planning Guide...
Страница 98: ...88 DS8882F Introduction and Planning Guide...
Страница 120: ...110 DS8882F Introduction and Planning Guide...
Страница 126: ...116 DS8882F Introduction and Planning Guide...
Страница 132: ...122 DS8882F Introduction and Planning Guide...
Страница 134: ...124 DS8882F Introduction and Planning Guide...
Страница 138: ...128 DS8882F Introduction and Planning Guide...
Страница 140: ...130 DS8882F Introduction and Planning Guide...
Страница 158: ...148 DS8882F Introduction and Planning Guide...
Страница 163: ......
Страница 164: ...IBM Printed in USA GC27 9259 00...