background image

Attention:

 

1.  

Potential

 

damage

 

to

 

E-DDMs

 

- Repeatedly turning the power off and on 

without waiting for the E-DDMs to spin down can damage them. Always wait 
at least 70 seconds from when you turn off the power until you turn it on 
again. 

2.   If you are connecting a power cord to a storage expansion enclosure, turn off 

both of its power switches first. If the main circuit breaker is off, be sure both 
power switches are off on each storage expansion enclosure in the cabinet 
before turning on the main circuit breakers. 

To turn the EXP810 on and off complete the following steps: 

1.   Are the main circuit breakers turned on? 

v

 

Yes

 

-

Turn off 

both

 

power switches on each storage expansion enclosure 

that you intend to connect to the power. 

v

 

No

 

-

Turn off 

both

 

power switches on 

all

 

storage expansion enclosures in 

the storage subsystem. For dc power supply and fan units only, turn off the 
disconnect devices for all of the dc power supply and fan units. 

2.   Connect the power cords to the power supplies on each storage expansion 

enclosure. See “Cabling the ac power supply” on page 61 or “Cabling the dc 
power supply” on page 62 for details, depending on your model. 

3.   If the main circuit breakers are turned off, turn them on. 

4.   Verify that the link rate setting on the front of the storage expansion enclosure 

matches the speed of the drives in the subsystem. 

Attention:

 

You must turn on power to each attached storage expansion 

enclosure before turning on power to the storage subsystem to ensure that the 
controllers complete the startup process. If the controllers do not find any 
drives present during the initial power on sequence, the storage subsystem will 
not complete the startup process. This will prevent controllers from 
communicating with each other, and any factory-installed premium features will 
not be activated correctly. 

5.   (For models with dc power supply and fan units only.) Verify that any attached 

disconnect devices are turned ON. 

6.   Turn on both power switches on each storage expansion enclosure attached to 

the storage subsystem. While each storage expansion enclosure powers up, 
the green and amber LEDs on the front and back of the storage expansion 
enclosure turn on and off intermittently. Depending on your configuration, it can 
take several minutes for each storage expansion enclosure to power up. 

Check the LEDs on the front and back of all the storage expansion enclosures. 
Verify that no Needs Attention or enclosure ID LEDs light on any of the storage 
expansion enclosures. To verify the fibre channel connections between the 
drive expansion enclosures, make sure that no Port Bypass LEDs for 
connections to other storage expansion enclosures are lit. Only the Port 
Bypass LED of the ESM port that connects directly to the storage subsystem 
drive port should be lit. 

7.   Turn on both power switches on the back of the DS4000 storage subsystem. 

See Figure 5 on page 9 or Figure 7 on page 11 for location of power switches, 
depending on your model. 

Depending on the number of storage expansion enclosures in the 
configuration, the storage subsystem might take several minutes to power up. 
The battery self-test might take an additional 15 minutes. The LEDs will blink 
intermittently until the storage subsystem powers up and completes the battery 
self-test. Before attempting any operations, wait at least five minutes for the 

70

 

IBM System Storage DS4000 EXP810 Storage Expansion Enclosure:  Installation, User’s and Maintenance Guide 

Содержание DS4000 EXP810

Страница 1: ...IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide GC26 7798 09...

Страница 2: ......

Страница 3: ...IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide GC26 7798 09...

Страница 4: ...l 2009 This edition replaces GC26 7798 08 and all previous editions of GC26 7798 This edition also applies to all subsequent releases and modifications until otherwise indicated in new editions Copyri...

Страница 5: ...el defined 2 SATA defined 2 Inventory checklist 3 EXP810 components 3 Enhanced Disk Drive Modules E DDMs 4 Environmental Service Modules ESMs 5 Connectors switch and enclosure ID 5 Rear drive channel...

Страница 6: ...LC cable to an SFP module 48 Removing an LC LC fibre channel cable 49 Cabling rules and recommendations 50 Cabling the EXP810 to a storage subsystem 51 EXP810 loop redundancy 53 Example of a correct...

Страница 7: ...tal Service Module ESM 115 Replacing an SFP module 118 Replacing a midplane 120 Chapter 6 Hardware maintenance 125 General checkout 125 Solving problems 125 Parts listing 131 Appendix A Upgrading the...

Страница 8: ...uct recycling and disposal 178 Battery return program 179 Contact information for IBM Taiwan Product Service 180 Electronic emission notices 180 Federal Communications Commission FCC statement 180 Chi...

Страница 9: ...nserting an LC LC fibre channel cable into an SFP module 49 30 LC LC fibre channel cable lever and latches 49 31 Removing the LC LC fibre channel cable 50 32 Installing an SFP module and LC LC cable i...

Страница 10: ...ns 121 59 Screws holding the top and bottom sides of the chassis to the cage frame 122 60 EXP810 storage expansion enclosure parts list 132 61 Only one entry appears in the Directly Managed Storage Su...

Страница 11: ...ired to support the EXP810 30 25 Firmware levels for intermixing storage servers and expansion enclosures 56 26 Supported EXP810 EXP710 and EXP100 enclosure combinations per redundant drive channel lo...

Страница 12: ...bsystem document titles by user tasks 166 53 DS4100 Storage Subsystem document titles by user tasks 167 54 DS5000 Storage Expansion Enclosure document titles by user tasks 168 55 DS4000 Storage Expans...

Страница 13: ...us to you A danger statement is placed just before the description of a potentially lethal or extremely hazardous procedure step or situation v Caution These statements indicate situations that can be...

Страница 14: ...he following table when installing moving or opening covers on this product or attached devices To Connect To Disconnect 1 Turn everything OFF 2 First attach all cables to devices 3 Attach signal cabl...

Страница 15: ...n those specified herein might result in hazardous radiation exposure DANGER Some laser products contain an embedded Class 3A or Class 3B laser diode Note the following Laser radiation when open Do no...

Страница 16: ...are disconnected from the power source 2 1 CAUTION Never remove the cover on a power supply or any part that has the following label attached Hazardous voltage current and energy levels are present i...

Страница 17: ...be located within the same premises as this equipment v Switching or disconnecting devices shall not be in the earthed circuit conductor between the dc source and the point of connection of the earthi...

Страница 18: ...ies sold with this product will expose you to lead a chemical known to the State of California to cause cancer and birth defects or other reproductive harm Wash hands after handling xvi IBM System Sto...

Страница 19: ...sion enclosure and interpret LEDs Chapter 5 Installing and replacing components on page 87 contains step by step instructions about how to install or remove customer replaceable units CRUs such as har...

Страница 20: ...ee also The DS4000 or DS5000 Quick Start Guides for your storage subsystem configuration provides an excellent overview of the installation process Table 1 Where to find DS4000 or DS5000 installation...

Страница 21: ...ounting Instructions 3 Mount the DS4000 or DS5000 EXP storage expansion unit in the rack v IBM System Storage Quick Start Guide for the following storage subsystems DS5100 DS5300 DS4800 DS4200 DS4700...

Страница 22: ...alStorage DS4400 Fibre Channel Cabling Instructions 6 Power up the subsystem v IBM System Storage Quick Start Guide for the following storage subsystems DS5100 DS5300 DS4800 DS4200 DS4700 v IBM System...

Страница 23: ...ks 10 Install host software failover drivers on host server 11 Start DS Storage Manager 12 Set the DS Storage Manager clock 13 Set the DS Storage Manager host default type 14 Verify DS4000 DS5000 subs...

Страница 24: ...at are listed in this section v Use an IBM discussion forum on the IBM Web site to ask questions You can solve many problems without outside assistance by following the troubleshooting procedures that...

Страница 25: ...0 systems IBM System Storage SAN Volume Controller clusters and other components of your data storage infrastructure Therefore you can use the IBM System Storage Productivity Center to manage multiple...

Страница 26: ...pport supportsite wss brandmain brandind 5000025 Support for IBM System x servers Find the latest support information for System x Intel and AMD based servers www ibm com systems support supportsite w...

Страница 27: ...e and protection IBM designs and manufactures equipment to internal and external standards that require certain environments for reliable operation Because IBM does not test any equipment for compatib...

Страница 28: ...r of the document and if applicable the specific location of the text that you are commenting on such as a page number or table number xxvi IBM System Storage DS4000 EXP810 Storage Expansion Enclosure...

Страница 29: ...uch as the DS4800 you can configure RAID protected storage solutions of up to 67 2 TB providing economical and scalable storage for your rapidly growing application needs for limited access data refer...

Страница 30: ...index jsp See Finding Storage Manager software controller firmware and README files on page xxii to learn how to access the DS4000 readme files on the Web Fibre channel defined Fibre channel technolo...

Страница 31: ...provided in Installing the support rails on page 32 To connect your EXP810 to other devices use the following options v IBM SFP module v IBM LC LC fibre channel cable Note You must order these option...

Страница 32: ...annel loop into the hard drive SATA protocol interface It also provides dual paths to the SATA drive for E DDM CRU path redundancy Each SATA hard drive ATA translator card also referred to as a interp...

Страница 33: ...that you could use to connect the storage expansion enclosure to the controller However only the two ESM SFP ports labeled 1A and 1B near the center of the storage expansion enclosure are used The SFP...

Страница 34: ...21 31 41 or 12 22 32 62 These examples are incorrect because the x1 digits are the same in all enclosure IDs either 1 or 2 If the enclosure IDs in your DS4000 subsystem configuration are not currentl...

Страница 35: ...7 5 5 6 4 3 2 1 7 exp81026 Figure 3 Back view power switch enclosure ID and connectors Table 3 Description of Figure 3 Number Description 1 Power connector 2 Power switch 3 ESM indicator lights 4 Rese...

Страница 36: ...enclosure The power supplies provide power to the internal components by converting incoming ac voltage to dc voltage If one power supply is turned off or malfunctions the other power supply maintains...

Страница 37: ...5 Description of Figure 5 Number Description 1 Power supply and fan unit A 2 Power supply and fan unit B 3 Power connector 4 Power switch Figure 6 on page 10 shows a power supply and fan unit and the...

Страница 38: ...ovide power to the internal components If one dc power supply is turned off or malfunctions the other dc power supply maintains power to the storage expansion enclosure To preserve the optimal airflow...

Страница 39: ...one way and in opposite orientation from each other If the dc cable does not fit the dc connector flip it 180 degrees and try again Do not force fit because you might damage the connectors and short o...

Страница 40: ...bps SFP that is plugged into a 4 Gbps capable port will limit the speed of that port to a maximum of 2 Gbps Conversely a 4 Gbps SFP that is plugged into a 2 Gbps capable port will limit the speed of t...

Страница 41: ...urities dust air particles and other external contaminants from adversely impacting the chassis electronic CRUs and hard drive operational effectiveness IBM recommends that you replace the filter ever...

Страница 42: ...ity and reliability Unless stated otherwise you can find the latest DS4000 publications firmware and host software at the IBM DS4000 System Storage Support Web site www ibm com servers storage support...

Страница 43: ...load at the DS4000 System Storage Support Web site www ibm com servers storage support disk See the IBM System Storage DS Storage Manager Version 10 Installation and Host Support Guide for your operat...

Страница 44: ...rade the controller firmware in the DS4800 Storage Subsystems models 82A H 84A H and 88A H to the level that supports EXP810s Determining firmware levels There are two different methods to determine t...

Страница 45: ...s Be sure to download the latest versions of the following packages at the time of initial installation and when product updates become available v DS Storage Manager host software v DS4000 and DS5000...

Страница 46: ...e these tasks check the DS Storage Manager online help or the Storage Manager guide for your operating system v During any maintenance or attended power up procedure carefully follow the power up sequ...

Страница 47: ...storage expansion enclosure depends on the number of components installed Table 10 lists the maximum empty and shipping weights for the storage subsystem in different configurations Table 11 lists th...

Страница 48: ...periods of time will expose the unit to greater risk of failure from external causes Important The recommended operating environment air temperature is 22 C 72 F or lower Table 13 Temperature and hum...

Страница 49: ...the power supplies have a 73 percent efficiency and a power factor of 0 99 These tabulated power and heat dissipation values are typical for the storage subsystem Maximum configuration units are typic...

Страница 50: ...Electrical requirements This section provides information regarding site power and wiring storage subsystem ac power requirements and power cord routing instructions Consider the following informatio...

Страница 51: ...amps at 240 VAC These are the overall maximum operating currents for the EXP810 storage expansion enclosure with ac power supply and fan unit CRUs Power recovery after an ac power failure After a tota...

Страница 52: ...re adequately cooled v Air enters at the front of the rack and leaves at the back To prevent the air that is leaving the rack from entering the intake of another piece of equipment you must position t...

Страница 53: ...r cabling only The intrabuilding ports of the equipment must not be metallically connected to interfaces that connect to the OSP or its wiring These interfaces are designed for use as intrabuilding in...

Страница 54: ...term refers to a period of not more than 96 consecutive hours and a total of not more than 15 days in one year This refers to a total of 360 hours in any given year but no more than 15 occurrences du...

Страница 55: ...itude objectives continued Environment Altitude Temperature 1 Notes 1 Temperatures are aisle ambient as measured 1 5 m 59 in above the floor and 400 mm 15 8 in in front of the equipment Chapter 1 Intr...

Страница 56: ...28 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 57: ...people should help you lift the EXP810 from the shipping box 2 Install the support rails in the rack See Installing the support rails on page 32 3 Install the EXP810 See Installing the EXP810 into a...

Страница 58: ...ovement can cause static electricity to build up around you v Handle the device carefully holding it by its edges or its frame v Do not touch solder joints pins or exposed printed circuitry v Do not l...

Страница 59: ...orage subsystems Note Different DS4000 models may have different firmware versions 5 Read Storage System Product Release Notes for any updated information about hardware software or firmware products...

Страница 60: ...cabinet at the same time v Install the storage expansion enclosure in a maximum 35 C 95 F environment v To ensure proper airflow do not block the air vents 15 cm 6 in of air space is sufficient v To...

Страница 61: ...ies are shown as horizontal dashed lines in the rack mounting templates Note The mounting holes that are shown in the following templates are square The holes in your rack might be round square or thr...

Страница 62: ...k depends on where you intend to position the storage expansion enclosure Complete the following steps to install the support rails Note Refer to Figure 17 on page 36 while performing these steps 1 En...

Страница 63: ...y one side of the rack cabinet The rails should be mounted with the alignment pins at the back of the rack Figure 17 on page 36 shows the installation of the left support rail 6 Hold the back of the r...

Страница 64: ...other equipment in the top half of a rackmount cabinet while the bottom half is empty Doing so can cause the cabinet to become top heavy and tip over Always install hardware in the lowest available p...

Страница 65: ...he rackmount cabinet b With help from another person place the back of the storage expansion enclosure on the support rails and then slide the unit into the rack as shown in Figure 18 Front of Rack Fi...

Страница 66: ...Installing a Telco bezel Complete the following step to install a bezel on an EXP810 storage expansion enclosure if it is shipped with one v Grasp the sides of the bezel and snap it onto the EXP810 ch...

Страница 67: ...ds470067 Figure 20 Installing a bezel Chapter 2 Installing the EXP810 39...

Страница 68: ...40 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 69: ...ge subsystems with internal drive slots in the DS4000 storage subsystem configuration must have a unique storage enclosure ID in the DS4000 subsystem configuration In addition the single digits x1 of...

Страница 70: ...ation v Fibre channel loop channel A fibre channel loop or fibre channel drive channel as it is called in certain DS4800 and DS4700 Express storage subsystem documentation consists of drive expansion...

Страница 71: ...Cs in any of the FC ports in the FC drive loops Long wave SFPs and GBICs are not supported for use in the drive ports of storage expansion enclosures v The SFP module housing has an integral guide key...

Страница 72: ...and avoid direct exposure to the beam Attention When you handle static sensitive devices take precautions to avoid damage from static electricity For details about handling static sensitive devices se...

Страница 73: ...C fibre channel cable before you remove the SFP module 1 Remove the LC LC fibre channel cable from the SFP module For more information see Handling fibre optic cables on page 46 2 Unlock the SFP modul...

Страница 74: ...fibre optic cables do not bend the cables to a diameter of less than 76 mm 3 in or a radius less than 38 mm 1 5 in or wrap them around themselves See Figure 26 on page 47 v Loop diameter of 76 mm 3 i...

Страница 75: ...one of the following devices v An SFP module installed in an IBM storage expansion enclosure v An SFP module installed in a DS4200 Express DS4300 DS4500 DS4700 Express or DS4800 storage subsystem See...

Страница 76: ...ation when open Do not stare into the beam do not view directly with optical instruments and avoid direct exposure to the beam 1 Read the information in Handling fibre optic cables on page 46 2 If nec...

Страница 77: ...hannel cable Complete the following steps to remove an LC LC fibre channel cable Attention To avoid damaging the LC LC cable or SFP module make sure that you observe the following precautions v Press...

Страница 78: ...enclosures to all drive ports which results in one enclosure per drive port of a drive channel v When mixing 14 drive storage expansion enclosures such as EXP710s and 16 drive storage expansion enclo...

Страница 79: ...age expansion enclosure grouping is group of EXP710s followed by group of EXP810s and followed by group of EXP100s v The EXP810 enclosure speed switch must be set to 2 Gbps when connecting to DS4300 o...

Страница 80: ...isk drive modules that can be ordered in bulk or individually as customer installable parts for the EXP810 are not supported for use in the EXP5000 Only disk drive modules ordered as feature codes of...

Страница 81: ...ge subsystem Figure 33 Installing an SFP module and connecting an LC LC cable to the EXP810 EXP810 loop redundancy Note The term drive loop or drive loop pair used in this publication might be referre...

Страница 82: ...nclosure type model IBM recommends that you group them by enclosure type model in a redundant drive channel pair to simplify maintenance and troubleshooting 3 You cannot mix storage expansion enclosur...

Страница 83: ...8 3 6 3 6 1A 1B 2A 2B 3 7 EXP810 2A 1A 2B 1B 3 6 3 6 1A 1B 2A 2B 4 6 EXP810 2A 1A 2B 1B 3 6 3 6 1A 1B 2A 2B exp810c1 Figure 34 Correct EXP810 redundant drive loop configuration To create drive loop A...

Страница 84: ...age expansion enclosures is limited by the level of controller firmware that is installed on your DS4000 Storage Servers Table 25 shows the firmware level you will need for intermixing the different s...

Страница 85: ...del Note For the DS4300 dual controller standard base model the maximum number of enclosures in a drive loop is three regardless of the drive enclosure types if the three storage expansion enclosure a...

Страница 86: ...rage Subsystem Table 28 Supported EXP810 and EXP710 enclosure combinations per redundant drive channel loop pair in a DS4700 Express configuration Number of EXP810s Total number of drives in EXP810s N...

Страница 87: ...hic as 1 is connected to drive port 4 of controller A and drive port 1 of controller B Also note that within the first group the three EXP810s are grouped together and then connected to the EXP710 1 D...

Страница 88: ...rt to the IN port on the left ESM ESM A of the EXP100 v If an EXP100 follows the initial EXP100 cable from the IN port on the left ESM ESM A of the first EXP100 to the OUT port on the left ESM of the...

Страница 89: ...d EXP100 intermix configuration in a DS4700 or DS4800 environment Figure 38 shows cabling variations when intermixing EXP100 EXP710 and EXP810 storage expansion enclosures behind a DS4800 Storage Subs...

Страница 90: ...s equipment shall be connected directly to the dc supply system earthing electrode conductor or to a bonding jumper from an earthing terminal bar or bus to which the dc supply system earthing electrod...

Страница 91: ...UTION There is current to the power supply and fan units even though the power supply switch is in the OFF position Use a disconnect device to shut power off before unplugging the dc power jumper cabl...

Страница 92: ...2 and dc power connectors B2 8 are connected to the left dc power source 1 For maximum protection connect dc power connectors A2 and B2 to a different set of dc power sources than dc power connectors...

Страница 93: ...dc power cable to the power supply See Figure 41 for the dc power supply connector PIN positions Figure 41 The dc power supply connector PIN positions ds47009 5 3 2 1 Table 29 The dc power supply con...

Страница 94: ...connect each of the two dc power supplies to a different power source 2 3 1 4 5 exp81034 Figure 42 The dc wiring from EXP810 to disconnect device and dc power source Table 30 The dc power source wiri...

Страница 95: ...ld be gathered periodically for regular Health Check monitoring regardless of the state of the Recovery Guru You can collect all these logs at once and zip them into a single file by clicking Advanced...

Страница 96: ...drivers and updates For DS4000 information go to the following Web site www ibm com servers storage support disk For the latest information about operating system and HBA support clustering support SA...

Страница 97: ...e configurations Although training is not a part of the Health Check process DS4000 training reduces the potential for configuration problems and contributes to the overall health of the system Poweri...

Страница 98: ...the storage subsystem will not complete the startup process This will prevent controllers from communicating with each other and any factory installed premium features will not be activated correctly...

Страница 99: ...n components v Yes End of procedure v No Go to step 10 10 Diagnose and correct the fault by completing the following steps a Run the DS Storage Manager Recovery Guru by selecting the Recovery Guru too...

Страница 100: ...rade firmware you should perform firmware upgrades in the following sequence 1 ESM firmware for the storage expansion enclosures 2 Controller firmware 3 Controller NVSRAM 4 Drive firmware Finding cont...

Страница 101: ...the failed components See Checking the LEDs v No You are finished with this procedure If you are still experiencing a problem with this storage subsystem create save and print a storage subsystem pro...

Страница 102: ...llowed OK to Remove Off On 3 Service Action Required Fault Off On 4 Direct Current Enabled On Off The dc power supply and fan unit LEDs This section describes the primary dc power supply and fan unit...

Страница 103: ...device switch is at the On position flip it to the Off position wait at least 15 seconds and flip it again to the On position If these LEDs did not change to an unlit state in 30 seconds replace the d...

Страница 104: ...mary Fault Off On 5 Global Power On Off 6 Link Rate Switch The Link Rate switch should be set to 2 Gbps or 4 Gbps depending on your configuration N A Figure 45 Front LEDs Rear LEDs This section descri...

Страница 105: ...Cable connected On No cable connected On when a fibre channel cable is connected 7 ESM Port 3 In Bypass This port is labeled 2A This port is reserved for future use On blinking for 30 seconds 8 ESM P...

Страница 106: ...display shows various diagnostic codes as the enclosures perform the startup process after each power cycle or reset After diagnostics are complete the current storage subsystem enclosure ID is displ...

Страница 107: ...offline ESM H5 Suspend Midplane Harness Failure Needs Attention condition for offline ESM H6 Suspend Firmware Failure Needs Attention condition for offline ESM H7 Operational Current enclosure Fibre...

Страница 108: ...re that you turn off the power v An IBM technical support representative instructs you to turn off the power v A power outage or emergency situation occurs see Restoring power after an unexpected shut...

Страница 109: ...ient to determine the status of the system components and special instructions The operating system software might require you to perform other procedures before you turn off the power To turn off the...

Страница 110: ...ower control button on the device and the power switch power supply do not turn off the electrical current supplied to the device The device might also have more than one power cord To remove all elec...

Страница 111: ...or power supply and fan unit fault LEDs lit before you turn on the DS4000 storage subsystem In addition consider the following items v The storage subsystem supports simultaneous power up of the syst...

Страница 112: ...hen the operating environment temperature is too hot greater than 55 C do not assume the power supply and fan unit CRU is bad Take action to cool down the environment first When the operating environm...

Страница 113: ...connected devices to the OFF position for models with dc power supply and fan unit CRUs only wait two minutes turn on both power switches and flip the disconnected devices to the ON position for model...

Страница 114: ...the recovery procedure If the Recovery Guru directs you to replace a failed component locate and troubleshoot that component See Checking the LEDs on page 73 c When the procedure is completed rerun th...

Страница 115: ...covery Guru instructions in the DS Storage Manager Subsystem Management window or refer to the appropriate component replacement instructions in this chapter for the additional diagnostics required in...

Страница 116: ...st be cabled to at least one storage expansion enclosure populated with at least two E DDMs If at least two E DDMs are not installed in each attached storage expansion enclosure when you power on the...

Страница 117: ...6 1A 1B 2B 2A 1 3 EXP810 2A 1A 2B 1B 2 3 6 3 6 1A 1B 2B 2A exp810c2 Figure 48 Cabling the EXP810 to an existing and configured drive loop The dashed lines in Figure 48 show how to add a new EXP810 to...

Страница 118: ...t the same level If the ESM version does not match wait at least 10 minutes for the ESM automatic code synchronization to occur Otherwise manually update the ESM firmware using the menu function in th...

Страница 119: ...evel surface 3 Remove the filter retainer and filter from the bezel by pressing the blue tabs toward the edge of the bezel 4 Flip the filter retainer over and remove the filter 5 Remove the new filter...

Страница 120: ...Link Rate setting speed must be set accordingly See Verifying the Link Rate setting on page 101 for more information IBM recommends that when adding E DDM CRUs if you are not installing all 16 E DDM...

Страница 121: ...e LEDs Each E DDM CRU tray has two associated LEDs a green Activity LED and an amber Fault LED These LEDs indicate the status for that E DDM See Table 36 for the drive LED states and descriptions v E...

Страница 122: ...hile an E DDM is removed or installed These E DDMs are known as hot swap E DDMs Installing hot swap hard disk drives With the exception of the DS4000 storage subsystem initial power up IBM recommends...

Страница 123: ...ive CRU bezel Note Make sure that the EMC gasket does not snag on the bezel d Push the tray handle down until it latches into place Replacing hot swap hard disk drives E DDM problems include any malfu...

Страница 124: ...Unpack the new E DDM Save all packing material in case you need to return it Attention The DS4700 Express and EXP810 E DDM options and FRUs are not compatible with DS4200 Express and EXP420 EV DDM opt...

Страница 125: ...DS4000 are running eliminating the down time that is required if you replace all of them at once However this method is more risky because you can lose data if the drive restoration or storage subsys...

Страница 126: ...s with the new E DDMs Read all precautionary notes kit instructions and other information Kit instructions often contain the most current information regarding the E DDMs and their installation plus u...

Страница 127: ...page 94 to install the new E DDMs into the EXP810 8 After you install all the new E DDMs check the system documentation for the hardware devices that you intend to power up and then determine the pro...

Страница 128: ...rding drive upgrades and installation v The documentation that comes with the new drives Read all precautionary notes kit instructions and other information Kit instructions often contain the most cur...

Страница 129: ...reen Drive activity LED and the amber Drive fault LED above the new E DDM CRUs Make sure that the Drive activity LEDs are on and the Drive fault LEDs are off Note The Drive fault LEDs might flash inte...

Страница 130: ...hange the Link Rate setting while the storage subsystem is running Changing the Link Rate setting while the storage subsystem is running could cause drives to fail You must power down the storage subs...

Страница 131: ...you handle static sensitive devices take precautions to avoid damage from static electricity For details about handling static sensitive devices see Handling static sensitive devices on page 30 3 Comp...

Страница 132: ...are displayed on blank drives 9 Are only the green indicator LEDs on v Yes The drive is working correctly v No If an amber Fault indicator LED is on go to 10 10 Diagnose and correct the fault by compl...

Страница 133: ...wer supply and fan units fail or if the power supply and fan units cannot maintain an internal temperature below 68 C 154 F the power supply and fan units in the unit will automatically shut down an o...

Страница 134: ...p 3 3 Put on antistatic protection 4 Unpack the new power supply and fan unit Save all packing material in case you need to return the failed power supply and fan unit CRU Note The new power supply an...

Страница 135: ...nect 1 Turn everything OFF 2 First attach all cables to devices 3 Attach signal cables to connectors 4 Attach power cords to outlet 5 Turn device ON 1 Turn everything OFF 2 First remove power cords fr...

Страница 136: ...er LED are off The new unit might be installed incorrectly The power supply and fan unit switch may not be turned on The power cord plug may not be fully inserted into the power outlet or the power su...

Страница 137: ...Select the Recovery Guru toolbar button in the Subsystem Management Window and complete the recovery procedure If a problem is still indicated contact IBM Customer and Technical Support v No Go to st...

Страница 138: ...ctric shock or energy hazards v This equipment must be installed by trained service personnel in a restricted access location as defined by the NEC and IEC 60950 1 First Edition The Standard for Safet...

Страница 139: ...out hot air The dc power supply and fan units are hot swappable and redundant however if the fans in one dc power supply and fan unit fail you must replace the entire failed dc power supply and fan u...

Страница 140: ...RU Note The new dc power supply and fan unit CRU comes with an instruction sheet and label sheet The instruction sheet provides instructions on placing the appropriate labels on the dc power supply an...

Страница 141: ...bles to devices 3 Attach signal cables to connectors 4 Attach power cords to power source 5 Turn device ON 1 Turn everything OFF 2 First remove power cords from power source 3 Remove signal cables fro...

Страница 142: ...nsert it Make sure that the levers lock into place in the storage expansion enclosure chassis 13 Plug in the power cord turn on any attached disconnect devices and turn on the power to the dc power su...

Страница 143: ...ed hot swap ESM Always verify the FRU part number of the replacement ESM to verify that it is compatible with the existing ESM in the EXP810 chassis Inserting non compatible ESM FRU may cause lost of...

Страница 144: ...ofile window opens c In the Save Profile window select or enter the file directory and file name Click Save to save the profile The Save Profile window closes Important Do not store DS4000 profiles in...

Страница 145: ...pty slot make sure the guide pins on the side of the ESM fit into the notches on the sides of the ESM bay After the guide pins fit into the notches and ESM fits snugly into the bay push the lever upwa...

Страница 146: ...er to the FRU option P N on the SFP to identify the maximum operating speed of the SFP and to request the correct FRU replacement Use the following procedure to replace a Small Form factor Pluggable S...

Страница 147: ...ault LEDs choose one of the following steps v Bypass LED or Fault LED is on Reinstall the SFP module and cables and verify that the SFP module and cables are securely connected Use the fibre channel l...

Страница 148: ...0 storage expansion enclosure 4 Label the fibre channel cables that are attached to the rear of the ESMs Labeling the cables simplifies the re cabling process 5 Remove the fibre channel cables that ar...

Страница 149: ...screwdriver to loosen the four front cage frame screws on the midplane as shown in Figure 58 Front cage frame screws 810midpl Front cage frame screws Figure 58 Front cage frame screw locations 12 On t...

Страница 150: ...aligning it with the EXP810 front opening and slowly sliding it into the EXP810 chassis Make sure that the front cage frame EMC gaskets do not snag between the frame and chassis 18 Tighten the four fr...

Страница 151: ...After removing the faulty cage frame with midplane assembly transpose the EXP810 serial number machine type and model tag from the faulty cage frame assembly to the Repair Identification RID tag on th...

Страница 152: ...124 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 153: ...oblem Determination Guide provide you with additional diagnostic aids Solving problems This section contains information to help you solve some of the problems you might have with your storage expansi...

Страница 154: ...the existing operating redundant drive loop with a different speed setting the port goes into bypass mode because mixing different speed enclosures within the same redundant drive loop channel is not...

Страница 155: ...ber LED is lit and the green activity LED is not lit Use the Recovery Guru to better identify the cause of the drive failure All amber and green LEDs are slowly flashing All drive CRUs Check for and r...

Страница 156: ...the SFP inserted in the ESM SFP port does not operate at 4 Gbps Use the Recovery Guru menu function in the DS Storage Manager Client Subsystem Management window to verify the problem and replace the S...

Страница 157: ...00 storage subsystem in the same redundant drive channel pair Verify that all of the storage expansion enclosures and DS4000 storage subsystem enclosure speeds are the same Use the procedure in Verify...

Страница 158: ...4000 was Perform one of the following flashing one per 2 not powered on or actions seconds all fibre channel v Power on the storage connections subsystem between the EXP810 and the DS4000 storage subs...

Страница 159: ...s not certified Check the DS4000 product Web site for the correct drive option P N or FRU P N certified for your DS4000 storage subsystem Random errors Subsystem Midplane failure Have the midplane rep...

Страница 160: ...5152 2 AC power supply and fan unit FRU 600 W models that are not NEBs Level 3 Telco compliant 41Y5155 AC power supply and fan unit FRU 600 W models that are NEBs Level 3 Telco compliant 1 42D3346 DC...

Страница 161: ...s FC 36 4 GB 15K drive module 40K6815 4 Gbps FC 73 4 GB 15K drive module 40K6819 4 Gbps FC 146 GB 15K drive module 40K6823 4 Gbps FC 300 GB 15K drive module 42D0417 4 Gbps FC 450 GB 15K drive module 4...

Страница 162: ...134 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 163: ...e to add the new EXP810s to your storage subsystem You can find both of these guides at the IBM Disk Support Web site listed previously Note Use this procedure only if you are upgrading your DS4800 co...

Страница 164: ...3A or higher If you are connecting an EXP810 to a DS4000 storage subsystem that is already connected to EXP710 storage expansion enclosures only or has a combination of EXP100 drive enclosures and EXP...

Страница 165: ...nd disconnect or remove the drives to ensure that the all of the data in the server cache was flushed to the disk 2 Power off the DS4000 configuration and the EXP810s if applicable 3 With the DS4000 a...

Страница 166: ...agement window To delete the entry right click the entry and select Remove Device from the pull down menu Click Yes when the Remove Device confirmation window opens When you are done continue to Downl...

Страница 167: ...ge subsystem directory in the FIRMWARE directory of the Web downloaded DS4000 Storage Subsystem Controller Firmware Version 06 16 xx xx package for the DS4700 or the DS4800 subsystems or DS4000 Storag...

Страница 168: ...storage expansion enclosures 1 Verify that the EXP810 storage expansion enclosures are correctly cabled to the DS4000 storage subsystem For more information on cabling the EXP810 see Chapter 3 Cabling...

Страница 169: ...ose the controller B Subsystem Management window When you are done continue with Adding and synchronizing the firmware for controller A with the firmware for controller B Adding and synchronizing the...

Страница 170: ...appears in the Directly Managed Storage Subsystem tree When the Subsystem Management window opens you can proceed with the other DS4000 storage subsystem management tasks such as creating arrays mapp...

Страница 171: ...om the Enterprise Management window 2 Remove controller A from the storage subsystem chassis wait a minute or so and repeat step 2 on page 141 If the problem persists call your IBM technical support r...

Страница 172: ...710s are powered on and do not have any Bypass LEDs lit on the EXP710 ports that are used for EXP710 interconnection Wait at least five minutes for the DS4000 storage subsystem boot process to complet...

Страница 173: ...ick OK to close the window an continue The firmware files are located in the appropriate DS4000 storage subsystem directory in the FIRMWARE directory of the Web downloaded DS4000 Storage Subsystem Con...

Страница 174: ...el loop pair one at a time See information about adding expansion enclosures containing new hard drives in the DS4000 DS5000 Hard Drive and Storage Expansion Enclosure Installation and Migration Guide...

Страница 175: ...whenever you contact your IBM technical support representative Identification numbers Record and retain the following information Product name IBM System Storage DS4000 EXP810 Storage Expansion Enclos...

Страница 176: ...in Name System DNS table The information is also helpful if you add storage subsystems after initial installation Refer to your DS Storage Manager documentation for detailed instructions about how to...

Страница 177: ...tion record Storage subsystem name Management method Controllers Ethernet and IP addresses and host name Host IP address and host name Finance Direct Controller A Hardware Ethernet address 00a0b802042...

Страница 178: ...ing bay number Attention If you replace a hard disk drive in the wrong drive bay it might cause a loss of data Table 43 Hard disk drive record Bay Number Hard disk drive serial number Replaced hard di...

Страница 179: ...and Figure 64 on page 153 to identify the proper locations for inserting M5 screws when mounting the support rails and EXP810 to a rack The locations for the M5 screws are highlighted in the template...

Страница 180: ...Bezel Front Right Install first 2 U Install first Install first 1 U 1 U Rail assembly Rail assembly Install second Front Left Front Right 0 U 0 U Figure 63 Front rack mounting template 152 IBM System...

Страница 181: ...REAR Rack Mounting Template 2U 2U Rail mounting guide 1U 1U Rail assembly Rail assembly Rear Left Rear right Printed in the U S A 0U 0U Figure 64 Rear rack mounting template Appendix C Rack mounting...

Страница 182: ...154 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 183: ...ree conductor cord a maximum of 15 feet in length and a tandem blade grounding type attachment plug rated 15 amperes 250 volts For units intended to be operated at 230 volts outside the U S Use a cord...

Страница 184: ...uinea Guinea Bissau Hungary Iceland Indonesia Iran Kazakhstan Kyrgyzstan Laos Peoples Democratic Republic of Latvia Lebanon Lithuania Luxembourg Macedonia former Yugoslav Republic of Madagascar Mali M...

Страница 185: ...8m Israel 39Y7919 9828 Power Cord 250v 10A 2 8m Liechtenstein Switzerland 39Y7922 9829 Power Cord 250v 10A 2 8m Bangladesh Lesotho Maceo Maldives Namibia Nepal Pakistan Samoa South Africa Sri Lanka S...

Страница 186: ...158 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 187: ...related common user tasks Table 45 DS Storage Manager Version 10 titles by user tasks Title User tasks Planning Hardware Software Configuration Operation and Diagnosis and installation installation ad...

Страница 188: ...enance Guide Installing or replacing a DS5000 Cache and Flash U U U Memory Card Installing or replacing a DS5000 U U U Host Interface Card DS4800 Storage Subsystem library Table 47 associates each doc...

Страница 189: ...ed Title User Tasks Planning Hardware Software Configuration Operation and Diagnosis and Installation Installation Administration Maintenance IBM TotalStorage DS4800 Controller Cache Upgrade Kit Instr...

Страница 190: ...re Configuration Operation and Diagnosis and Installation Installation Administration Maintenance IBM System Storage DS4700 Storage Subsystem Installation User s U U U U U and Maintenance Guide IBM Sy...

Страница 191: ...tasks Title User Tasks Planning Hardware Software Configuration Operation and Diagnosis and Installation Installation Administration Maintenance IBM TotalStorage DS4500 Storage Subsystem Installation...

Страница 192: ...Hardware Software Configuration Operation and Diagnosis and Installation Installation Administration Maintenance IBM TotalStorage DS4400 Fibre Channel Storage Server User s Guide U U U U U IBM TotalS...

Страница 193: ...iagnosis and Installation Installation Administration Maintenance IBM TotalStorage DS4300 Storage Subsystem Installation User s U U U U U and Maintenance Guide IBM TotalStorage DS4300 Rack Mounting In...

Страница 194: ...e Software Configuration Operation and Diagnosis and Installation Installation Administration Maintenance IBM System Storage DS4200 Express Storage Subsystem Installation User s U U U U U and Maintena...

Страница 195: ...e Subsystem document titles by user tasks Title User Tasks Planning Hardware Software Configuration Operation and Diagnosis and Installation Installation Administration Maintenance IBM TotalStorage DS...

Страница 196: ...U U U Subsystems and for the EXP5000 Storage Expansion Enclosure IBM System Storage DS4000 DS5000 Hard Drive and Storage Expansion U U Enclosure Installation and Migration Guide DS4000 Storage Expansi...

Страница 197: ...U U 3 and 4 also for installing the EXP810 and EXP420 IBM TotalStorage DS4000 EXP700 and EXP710 Storage Expansion Enclosures U U U U U Installation User s and Maintenance Guide IBM DS4000 EXP500 Inst...

Страница 198: ...talStorage DS4000 FC2 133 Host Bus Adapter U U Installation and User s Guide IBM TotalStorage DS4000 FC2 133 Dual Port Host Bus U U Adapter Installation and User s Guide IBM Netfinity Fibre Channel Ca...

Страница 199: ...ther required host software components Table 57 defines the keyboard operations that enable you to navigate select or activate user interface components The following terms are used in the table v Nav...

Страница 200: ...select press Ctrl Spacebar to select the drive If you press Spacebar alone when multiple drives are selected then all selections are removed Use the Ctrl Spacebar combination to deselect a drive when...

Страница 201: ...propietarios de equipos a reciclar sus productos de TI Se puede encontrar informaci n sobre las ofertas de reciclado de productos de IBM en el sitio web de IBM http www ibm com ibm environment product...

Страница 202: ...EEE as unsorted municipal waste but use the collection framework available to customers for the return recycling and recovery of WEEE Customer participation is important to minimize any potential effe...

Страница 203: ...wan Please recycle batteries For the European Union Batteries or packaging for batteries are labeled in accordance with European Directive 2006 66 EC concerning batteries and accumulators and waste ba...

Страница 204: ...due to the potential presence of hazardous substances For proper collection and treatment contact your local IBM representative Spain This notice is provided in accordance with Royal Decree 106 2008...

Страница 205: ...EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF NON INFRINGEMENT MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some jurisdictions do not allow disclaimer of express or...

Страница 206: ...urrently supported drives available from IBM Maximum memory may require replacement of the standard memory with an optional memory module IBM makes no representation or warranties regarding non IBM pr...

Страница 207: ...ut rather reclaimed upon end of life per this Directive Battery return program This product may contain a sealed lead acid nickel cadmium nickel metal hydride lithium or lithium ion battery Consult yo...

Страница 208: ...the user will be required to correct the interference at his own expense Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits IBM is not responsible...

Страница 209: ...Council Directive 2004 108 EC on the approximation of the laws of the Member States relating to electromagnetic compatibility IBM cannot accept responsibility for any failure to satisfy the protectio...

Страница 210: ...wan Class A warning statement Japanese Voluntary Control Council for Interference VCCI statement 182 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Gu...

Страница 211: ...IBM Corp 2006 2009 Channel Arbitrated Loop FC AL is controlled by an arbitration scheme The FC AL topology supports all classes of service and guarantees in order delivery of FC frames when the origi...

Страница 212: ...Share access to logical drives with default logical drive to LUN mappings device type Identifier used to place devices in the physical map such as the switch hub or storage DHCP See Dynamic Host Confi...

Страница 213: ...SA A bus standard for IBM compatibles that extends the Industry Standard Architecture ISA bus architecture to 32 bits and allows more than one central processing unit CPU to share the bus See also Ind...

Страница 214: ...a storage management station and a host simultaneously host bus adapter HBA An interface between the fibre channel network and a workstation or server host computer See host host group An entity in t...

Страница 215: ...physical partition 3 One to three physical partitions copies The number of logical partitions within a logical volume is variable logical unit number LUN An identifier used on a small computer system...

Страница 216: ...whose contents are not lost when power is cut off N_port See node port NVS See nonvolatile storage NVSRAM Nonvolatile storage random access memory See nonvolatile storage Object Data Manager ODM An AI...

Страница 217: ...transparently reroutes I Os to the other controller in the redundant set if a controller or I O path fails remote mirroring Online real time replication of data between storage subsystems that are mai...

Страница 218: ...as flip flop It is called static because it retains a value as long as power is supplied unlike dynamic random access memory DRAM which must be regularly refreshed It is however still volatile meaning...

Страница 219: ...etworks It uses the Internet Protocol IP as the underlying protocol Transmission Control Protocol Internet Protocol TCP IP A set of communication protocols that provide peer to peer connectivity funct...

Страница 220: ...192 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 221: ...3 dc power supply 3 environmental services modules 3 power supply and fan units 3 Telco bezel 13 weights 19 components installing and replacing 87 contact information Taiwan Product Service 180 contr...

Страница 222: ...Japanese Voluntary Control Council for Interference VCCI statement 182 Taiwanese Class A warning statement 182 United Kingdom telecommunications safety requirement 181 emergency shutdown 82 enclosure...

Страница 223: ...EDs ac power supply and fan unit 73 dc power supply and fan unit 74 diagnostic 77 front 75 rear 76 link rate switch verifying 101 Linux host support xxiv loop redundancy 42 correct example 54 loop red...

Страница 224: ...500 52 protective cap 44 removal 45 removing an LC LC cable 49 static protective package 44 Small Form Factor Pluggable modules described 12 Small form Factor Pluggable modules replacing 118 software...

Страница 225: ...r for planned shutdown 80 turning off the storage expansion enclosure 80 turning on power after power supply shutdown 84 at initial startup 69 U uninterruptible power supply UPS 32 United States elect...

Страница 226: ...198 IBM System Storage DS4000 EXP810 Storage Expansion Enclosure Installation User s and Maintenance Guide...

Страница 227: ...and information about products and prices please contact your IBM branch office your IBM business partner or your authorized remarketer When you send comments to IBM you grant IBM a nonexclusive right...

Страница 228: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Fold and Tape Please do not staple Fold and Tape NO POSTAGE NECES...

Страница 229: ......

Страница 230: ...Printed in USA GC26 7798 09...

Отзывы: