background image

Safety notices

Safety notices may be printed throughout this guide:
• DANGER notices call attention to a situation that is potentially lethal or extremely hazardous to people.
• CAUTION notices call attention to a situation that is potentially hazardous to people because of some

existing condition.

• Attention notices call attention to the possibility of damage to a program, device, system, or data.

World Trade safety information
Several countries require the safety information contained in product publications to be presented in their

national languages. If this requirement applies to your country, safety information documentation is

included in the publications package (such as in printed documentation, on DVD, or as part of the product)

shipped with the product. The documentation contains the safety information in your national language

with references to the U.S. English source. Before using a U.S. English publication to install, operate, or

service this product, you must first become familiar with the related safety information documentation.

You should also refer to the safety information documentation any time you do not clearly understand any

safety information in the U.S. English publications.
Replacement or additional copies of safety information documentation can be obtained by calling the IBM

Hotline at 1-800-300-8751.

German safety information
Das Produkt ist nicht für den Einsatz an Bildschirmarbeitsplätzen im Sinne § 2 der

Bildschirmarbeitsverordnung geeignet.

Laser safety information
IBM servers can use I/O cards or features that are fiber-optic based and that utilize lasers or LEDs.
Laser compliance
IBM servers may be installed inside or outside of an IT equipment rack.

DANGER: When working on or around the system, observe the following precautions:
Electrical voltage and current from power, telephone, and communication cables are hazardous. To

avoid a shock hazard:
• If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power

cord. Do not use the IBM provided power cord for any other product.

• Do not open or service any power supply assembly.
• Do not connect or disconnect any cables or perform installation, maintenance, or reconfiguration

of this product during an electrical storm.

• The product might be equipped with multiple power cords. To remove all hazardous voltages,

disconnect all power cords.
– For AC power, disconnect all power cords from their AC power source.
– For racks with a DC power distribution panel (PDP), disconnect the customer’s DC power

source to the PDP.

• When connecting power to the product ensure all power cables are properly connected.

– For racks with AC power, connect all power cords to a properly wired and grounded electrical

outlet. Ensure that the outlet supplies proper voltage and phase rotation according to the

system rating plate.

©

 Copyright IBM Corp. 2017, 2019

v

Содержание 9006-22C

Страница 1: ...Power Systems Installing and configuring the IBM Power System LC922 9006 22P IBM...

Страница 2: ...G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER9 processor and to all associated models Copyright Interna...

Страница 3: ...6 22C or 9006 22P system 99 Before you begin servicing 99 Identifying the 5104 22C 9006 12P 9006 22C or 9006 22P system that contains the part to replace 102 LEDs on the 5104 22C 9006 22C or 9006 22P...

Страница 4: ...23 Accessibility features for IBM Power Systems servers 124 Privacy policy considerations 125 Trademarks 125 Electronic emission notices 126 Class A Notices 126 Class B Notices 129 Terms and condition...

Страница 5: ...00 300 8751 German safety information Das Produkt ist nicht f r den Einsatz an Bildschirmarbeitspl tzen im Sinne 2 der Bildschirmarbeitsverordnung geeignet Laser safety information IBM servers can use...

Страница 6: ...urn off everything unless instructed otherwise 2 For AC power remove the power cords from the outlets 3 For racks with a DC power distribution panel PDP turn off the circuit breakers located in the PD...

Страница 7: ...here the air flow is compromised Ensure that air flow is not blocked or reduced on any side front or back of a unit used for air flow through the unit Consideration should be given to the connection o...

Страница 8: ...that all devices shelves drawers doors and cables are secure Ensure that the four leveling pads are raised to their highest position Ensure that there is no stabilizer bracket installed on the rack c...

Страница 9: ...elves or work spaces Do not place objects on top of rack mounted devices In addition do not lean on rack mounted devices and do not use them to stabilize your body position for example when working fr...

Страница 10: ...aser product Consult the label on each part for laser certification numbers and approval information CAUTION This product might contain one or more of the following devices CD ROM drive DVD ROM drive...

Страница 11: ...d for use to assist lift install remove units load up into rack elevations It is not to be used loaded transporting over major ramps nor as a replacement for such designated tools like pallet jacks wa...

Страница 12: ...inch accident could cause serious injury Not for moving humans Make certain clicking sound is heard as the equipment is being raised Be sure winch is locked in position before releasing handle Read in...

Страница 13: ...d DC return DC I design The DC battery return terminal shall not be connected to the chassis or frame ground The dc powered system is intended to be installed in a common bonding network CBN as descri...

Страница 14: ...xiv Power Systems Installing and configuring the IBM Power System LC922 9006 22P...

Страница 15: ...version of this document is maintained online see Installing the IBM Power System http www ibm com support knowledgecenter POWER9 p9eip p9eip22c_install_kickoff htm To plan your server installation s...

Страница 16: ...enter POWER9 p9hbf p9hbf_racksafety htm 2 Determine where to place the system unit in the rack As you plan for installing the system unit in a rack consider the following information Organize larger a...

Страница 17: ...ry remove the filler panels to allow access to the inside of the rack enclosure where you plan to place the system unit as shown in Figure 1 on page 4 Installing and configuring your system and system...

Страница 18: ...the bottom EIA unit marked on the front of the rack 9 Mark the bottom EIA unit 10 Mark the corresponding holes on the left side of the rack Attaching the rails to the rack and to the 5104 22C 9006 22C...

Страница 19: ...ach the adapters to the rails The adapters slide and snap into place on the rail Note Each adapter is marked with either an A or a B For the left rail the A bracket should be in front and the B bracke...

Страница 20: ...rked L or an R behind each handle a On the right side of the system align the metal tabs on the system chassis with the holes on the inner chassis slide rail A Slide the chassis slide rail toward the...

Страница 21: ...rough the EIA support flange Installing the 5104 22C 9006 22C or 9006 22P system into the rack and connecting and routing power cables After you install the system onto the rails in the rack connect a...

Страница 22: ...latform Management Interface IPMI 3 Serial IPMI 4 Video Graphics Array VGA used for monitor Only the 1024 x 768 at 60 Hz VGA setting is supported Only up to a 3 meter cable is supported Only text base...

Страница 23: ...ystem runs directly on the Open Power Abstraction Layer OPAL firmware For more information about installing the Linux operating system on bare metal systems see Installing Linux on bare metal systems...

Страница 24: ...rives SAS SATA drives Four drives to integrated controller eight drives to SAS SATA adapter Two drives to integrated controller eight drives to SAS SATA adapter Eight drives to SAS SATA adapter 12 8 1...

Страница 25: ...VMe drives 2 NVMe drives and an NVMe adaptor 4 NVMe drives and an NVMe adaptor 12 10 8 Figure 6 on page 11 Figure 7 on page 11 Figure 8 on page 12 Figure 6 Up to 12 SAS or SATA drives or a mix of SAS...

Страница 26: ...disk drive backplane A Maps to mini SAS drive connector 1 and supports the indicated drive bays 0 through 3 B Maps to mini SAS drive connector 2 and supports the indicated drive bays 0 through 3 C Ma...

Страница 27: ...k drive in the front of the IBM Power System LC922 9006 22P system Before you begin You can install SATA and SAS front drives with the system powered on and running When installing NVMe drives the sys...

Страница 28: ...igure The handle B snaps out towards you If the handle does not snap out all the way the drive does not slide out of the system Figure 11 Removing a front drive 3 If you are installing more than one d...

Страница 29: ...3 on page 16 b Open the retention spring B as shown in Figure 14 on page 17 c Place the 2 5 inch drive A into the tray aligning the pins with the screw holes in the drive d When the pins are aligned c...

Страница 30: ...Figure 13 Turning the 2 5 inch tray upside down 16 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...

Страница 31: ...ttom as you position the drive and insert it into the drive slot Ensure that the drive is fully seated and is all the way into the system 7 Lock the drive bay handle A by pushing in the handle release...

Страница 32: ...rive is detected and configured when inserted After you insert the new drive you need to rescan for the device Ubuntu Linux operating system To run the rescan scsi bus command in the Ubuntu Linux oper...

Страница 33: ...eted and if applicable until the service access cover is replaced Attention Attach an electrostatic discharge ESD wrist strap to the front ESD jack to the rear ESD jack or to an unpainted metal surfac...

Страница 34: ...rive into the tray Ensure that the tray is open Orient the drive such that the connectors are pointing to the rear of the tray Ensure that the screw holes A in the drive align with the pins B in the t...

Страница 35: ...rear drive in the tray 5 While checking the alignment pins press the sides A of the tray together until button B snaps into place as shown in Figure 18 on page 22 Installing and configuring your syste...

Страница 36: ...ition the drive and insert it into the drive slot Ensure that the drive is fully seated and is all the way into the system 7 Lock the drive bay handle A by pushing in the handle release until it locks...

Страница 37: ...us command in the Ubuntu Linux operating system log in to the system as the root user and run the following command rescan scsi bus The rescan scsi bus tool is available in the scsitools package insta...

Страница 38: ...d and if applicable until the service access cover is replaced Attention Attach an electrostatic discharge ESD wrist strap to the front ESD jack to the rear ESD jack or to an unpainted metal surface o...

Страница 39: ...u need to rescan for the device Ubuntu Linux operating system To run the rescan scsi bus command in the Ubuntu Linux operating system log in to the system as the root user and run the following comman...

Страница 40: ...a single processor system the first four DIMMs must be installed in a pairs After the first four DIMMs you must add memory DIMMs in quads For a two processor system the first eight DIMMs must be insta...

Страница 41: ...y plugging sequence Table 5 Single processor memory plugging sequence Slot Location Plugging Sequence P1 A1 and P1 B1 1 P1 C1 and P1 D1 2 P1 A2 P1 B2 P1 C2 and P1 D2 3 Installing and configuring your...

Страница 42: ...hardware When you use an ESD wrist strap follow all electrical safety procedures An ESD wrist strap is used for static control It does not increase or decrease your risk of receiving electric shock w...

Страница 43: ...yed to prevent it from being installed incorrectly Note the location of the key tab within the memory connector before you attempt to install it b Press firmly on each side of the memory DIMM as shown...

Страница 44: ...G I2 EKED Broadcom LSI 9300 8E SAS3 HBA PCIe3 0 x8 LP Adapter Adapter part number 01EM634 AOC SAS3 9300 8E EKEH see EKAH Broadcom LSI MegaRAID 9361 8i SAS3 Controller with 8 internal ports 2 GB Cache...

Страница 45: ...provides information about the adapters the slot priorities in the system they are supported on and the maximum number of adapters that can be installed in the supported system You can click the link...

Страница 46: ...6 EKAM Mellanox MCX415A CCAT ConnectX 4 EN 100 GbE Single port QSFP28 PCIe3 0 x16 LP Adapter part number 01EM687 AOC MCX415A CCAT IB001 2 1 2 3 1 5 6 5 EKAQ Qlogic QLE2692OP Dual port 16 Gb Fibre Cha...

Страница 47: ...PCIe3 0 x8 LP with cables Adapter part number 01EM633 AOC SED LSI00287 and 01EM638 AOC K S3008L L8iB IB001 1 2 1 4 1 5 6 3 2 2 EKED Broadcom LSI 9300 8E SAS3 HBA PCIe3 0 x8 LP Adapter Adapter part num...

Страница 48: ...rt number 01EM690 AOC MCX555A ECAT IB001 2 1 2 3 1 5 6 5 EKFE Qlogic QLE2742 32 Gb Fibre Channel adapter PCIe3 x8 2 port LP Adapter part number 01EM693 AOC QLE2742SR IB001 1 2 2 4 1 5 6 3 2 6 EKFF Bro...

Страница 49: ...e details for each adapter Important This document does not replace the latest sales and marketing publications and tools that document supported features If you are installing a new feature ensure th...

Страница 50: ...ter part number 01EM634 AOC SAS3 9300 8E EKEG SMC Quad port NVMe Host Bus Adapter PEX9733 PCIe3 0 x8 LP with cables Adapter part number 01EM635 AOC K SLG3 4E2PS IB001 and 01EM639 AOC K SLG3 4E2PB IB00...

Страница 51: ...equirements for feature code FC EKA0 adapters Overview The PCIe3 x4 Intel x550 10GBase T Converged Network Adapter with Dual RJ45 Ports is a PCI Express PCIe generation 3 Gen3 x4 adapter The adapter c...

Страница 52: ...ks The latest version of enabling libraries and utilities can be downloaded from Fix Central http www ibm com support fixcentral IBM Prerequisite website www14 software ibm com support customercare ip...

Страница 53: ...acement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dita or PCIe adapter placement rules for the 9006 2...

Страница 54: ...eroperation Center http www 03 ibm com systems support storage ssic interoperability wss The latest version of the device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from...

Страница 55: ...ement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dita or PCIe adapter placement rules for the 9006 22P http www ibm com support knowledgece...

Страница 56: ...test version of the device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm com webapp set2 sas f l...

Страница 57: ...see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dita or PCIe adapter placement rules for the 9006 22P http www ib...

Страница 58: ...com webapp set2 sas f lopdiags info LinuxAlerts html Broadcom LSI MegaRAID 9361 8i SAS3 Controller with 8 Internal Ports 1 GB Cache PCIe3 0 x8 LP with cables FC EKAA and EKEA Learn about the specific...

Страница 59: ...y with RoHS requirement I O bus architecture PCIe3 x8 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P htt...

Страница 60: ...y wss The latest version of the device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm com webapp...

Страница 61: ...ies maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dita or PCIe adapter placement r...

Страница 62: ...utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm com webapp set2 sas f lopdiags home html For more information see the Linux Alert webs...

Страница 63: ...ore information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_detail...

Страница 64: ...f lopdiags home html For more information see the Linux Alert website www14 software ibm com webapp set2 sas f lopdiags info LinuxAlerts html Important For a list of known Linux operating system issue...

Страница 65: ...ith RoHS requirement FC EKEG 01EM639 AOC K SLG3 4E2PB IB001 Designed to comply with RoHS requirement I O bus architecture PCIe3 x8 Slot requirement For more information about slot priorities maximums...

Страница 66: ...ee the Linux Alert website www14 software ibm com webapp set2 sas f lopdiags info LinuxAlerts html Important For a list of known Linux operating system issues that can affect this adapter see the IBM...

Страница 67: ...gned to comply with RoHS requirement FC EKEH 01EM637 AOC K 9361 8I2B IB001 Designed to comply with RoHS requirement I O bus architecture PCIe3 x8 Slot requirement For more information about slot prior...

Страница 68: ...storage ssic interoperability wss The latest version of the device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http ww...

Страница 69: ...rchitecture PCIe3 x16 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgec...

Страница 70: ...ttp www ibm com support fixcentral IBM Prerequisite website www14 software ibm com support customercare iprt home IBM SSIC System Storage Interoperation Center http www 03 ibm com systems support stor...

Страница 71: ...Ie3 x16 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p...

Страница 72: ...ral IBM Prerequisite website www14 software ibm com support customercare iprt home IBM SSIC System Storage Interoperation Center http www 03 ibm com systems support storage ssic interoperability wss T...

Страница 73: ...8 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p...

Страница 74: ...s f lopdiags home html For more information see the Linux Alert website www14 software ibm com webapp set2 sas f lopdiags info LinuxAlerts html Important For a list of known Linux operating system iss...

Страница 75: ...nabling libraries and utilities can be downloaded from Fix Central http www ibm com support fixcentral IBM Prerequisite website www14 software ibm com support customercare iprt home IBM SSIC System St...

Страница 76: ...Adapter Specifications Item Description Adapter FRU number 01EM688 AOC MCX4121A ACAT IB001 Designed to comply with RoHS requirement I O bus architecture PCIe3 x8 Slot requirement For more information...

Страница 77: ...te website www14 software ibm com support customercare iprt home IBM SSIC System Storage Interoperation Center http www 03 ibm com systems support storage ssic interoperability wss The latest version...

Страница 78: ...requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p...

Страница 79: ...he device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm com webapp set2 sas f lopdiags home html...

Страница 80: ...ecture PCIe4 x16 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter...

Страница 81: ...bapp set2 sas f lopdiags home html For more information see the Linux Alert website www14 software ibm com webapp set2 sas f lopdiags info LinuxAlerts html Broadcom LSI MegaRAID 9361 8i SAS3 Controlle...

Страница 82: ...HS requirement I O bus architecture PCIe3 x8 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm...

Страница 83: ...perability wss The latest version of the device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm co...

Страница 84: ...ums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dita or PCIe adapter placement rules for...

Страница 85: ...e IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm com webapp set2 sas f lopdiags home html For more information...

Страница 86: ...nformation about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dit...

Страница 87: ...webapp set2 sas f lopdiags home html For more information see the Linux Alert website www14 software ibm com webapp set2 sas f lopdiags info LinuxAlerts html Mellanox MCX414A BCAT ConnectX 4 EN dual...

Страница 88: ...vice driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm com webapp set2 sas f lopdiags home html For...

Страница 89: ...bus architecture PCIe3 x8 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowle...

Страница 90: ...ebsite http www14 software ibm com webapp set2 sas f lopdiags home html For more information see the Linux Alert website www14 software ibm com webapp set2 sas f lopdiags info LinuxAlerts html Qlogic...

Страница 91: ...8 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p...

Страница 92: ...he IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software ibm com webapp set2 sas f lopdiags home html For more information...

Страница 93: ...M5719 4P BRC Designed to comply with RoHS requirement I O bus architecture PCIe x4 Slot requirement For more information about slot priorities maximums and placement rules see the PCIe adapter placeme...

Страница 94: ...bm com support customercare iprt home IBM SSIC System Storage Interoperation Center http www 03 ibm com systems support storage ssic interoperability wss The latest version of the device driver or the...

Страница 95: ...cable length is more than 100 M Operating system or partition requirements If you are installing a new feature ensure that you have the software that is required to support the new feature and that y...

Страница 96: ...ee the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dita or PCIe adapter placement rules for the 9006 22P http www ibm...

Страница 97: ...ion see the Linux Alert website www14 software ibm com webapp set2 sas f lopdiags info LinuxAlerts html Broadcom LSI 9305 16E SAS3 HBA PCIe3 0 x8 LP FC EKGC Learn about the specifications and operatin...

Страница 98: ...rmation about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_details dita o...

Страница 99: ...ibm com systems support storage ssic interoperability wss The latest version of the device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productiv...

Страница 100: ...more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_detai...

Страница 101: ...nteroperability wss The latest version of the device driver or the IBM Power RAID adapter utilities iprutils can be downloaded from the IBM Service and Productivity Tools website http www14 software i...

Страница 102: ...more information about slot priorities maximums and placement rules see the PCIe adapter placement rules for the 9006 12P http www ibm com support knowledgecenter POWER9 p9eip p9eip12p_pcie_slot_detai...

Страница 103: ...e IBM Power System LC922 9006 22P system Before you begin Power off the system and place it in the service position For instructions see Preparing the 5104 22C 9006 22C or 9006 22P system to remove an...

Страница 104: ...shown in Figure 53 on page 90 Figure 53 Removing the PCIe riser a Retract the retaining pin A as shown in Figure 53 on page 90 b Lift the PCIe riser from the system c Place the PCIe riser on an ESD su...

Страница 105: ...the screw to secure the tail stock h Insert the PCIe adapter A that is located in position 2 into the PCIe adapter riser B as shown in Figure 55 on page 91 Figure 55 Inserting an adapter into positio...

Страница 106: ...he system has a screw near the front of the riser replace that screw Figure 56 Inserting the position 1 and 2 riser 4 To install an adapter in position 4 complete the following steps a Retract the ret...

Страница 107: ...apter before inserting the adapter See Drive installation options for the 9006 22P system on page 9 for cabling information d Insert the adapter into the riser e Close the retaining door by sliding it...

Страница 108: ...e tail stock retainer to the closed position 5 To install an adapter in position 3 5 or 6 remove the riser as shown in Figure 59 on page 95 94 Power Systems Installing and configuring the IBM Power Sy...

Страница 109: ...l stock filler for that position e If you are inserting a storage drive adapter connect the signal cables to the adapter before inserting the adapter See Drive installation options for the 9006 22P sy...

Страница 110: ...ct the retaining pin B so the arrow points to the system 2 Insert the riser using the slots and alignment pins A to properly insert the riser Push the riser firmly into the system backplane 3 Set the...

Страница 111: ...Figure 61 Inserting the PCIe adapter riser 6 Using your labels replace any cables and plugs that you removed from the PCIe adapters Installing and configuring your system and system features 97...

Страница 112: ...98 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...

Страница 113: ...be equipped with multiple power cords To remove all hazardous voltages disconnect all power cords For AC power disconnect all power cords from their AC power source For racks with a DC power distribut...

Страница 114: ...joints may be present in and around the system Use care when handling equipment to avoid cuts scrapes and pinching D005 R001 part 1 of 2 DANGER Observe the following precautions when working on or aro...

Страница 115: ...at a time The rack might become unstable if you pull out more than one drawer at a time For fixed drawers This drawer is a fixed drawer and must not be moved for servicing unless specified by the manu...

Страница 116: ...a guide to the LEDs on the system The LEDs indicate various system status If the part does not have a problem indicator LED you can use a troubleshooting program such as impitool to identify the issu...

Страница 117: ...LEDs are also on the rear of the system see Figure 63 on page 104 The identify LED is at 2 Turn it on by using a system identify command Common procedures for servicing or installing features in the...

Страница 118: ...states Steady green indicates that power is on Flashing green indicates that AC is applied but the system is powered off Steady amber indicates that AC is not applied or a power fault occurred Flashin...

Страница 119: ...static discharge ESD wrist strap to the front ESD jack to the rear ESD jack or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware When yo...

Страница 120: ...or or or 106 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...

Страница 121: ...008 L012 CAUTION Pinch hazard L012 7 Remove the service access cover For instructions see Removing the service access cover from an 5104 22C 9006 22C or 9006 22P system on page 115 Preparing the 5104...

Страница 122: ...owledgecenter POWER9 p9ei3 p9ei3_verifyrepair htm Starting and stopping the 5104 22C 9006 12P 9006 22C or 9006 22P Learn how to start and stop the system to perform a service action or system upgrade...

Страница 123: ...Figure 64 Power switch for 9006 12P Common procedures for servicing or installing features in the 5104 22C 9006 22C or 9006 22P system 109...

Страница 124: ...ete the steps in this procedure Procedure You can use the Linux shutdown command to stop and power down the system For example the following command will shut down the system in 10 minutes and send th...

Страница 125: ...StorCLI commands Learn about the StorCLI commands They are for use with the PCIe adapter feature codes EKAA and EKEA If the command is not installed download the utility from Broadcom https www broadc...

Страница 126: ...tatus storcli show To show a list of all controllers and drives that need attention storcli show all To show information about the drives storcli cx eall sall show To locate a physical disk by turning...

Страница 127: ...command syntax sas3ircu controller_ command parameters To list the controllers sas3ircu list To show the controller status sas3ircu controller_ status To turn on the drive light sas3ircu controller_ l...

Страница 128: ...e a service action event Sensor readings display operation Most sensors are initially gray then change status and color during the boot process when the FRU is initialized and either determined to be...

Страница 129: ...w purposes and thermal performance the service access cover must be installed and fully seated before you power on the system Procedure 1 Ensure that you removed both power cords from the system For i...

Страница 130: ...22C system About this task Attention For safety airflow purposes and thermal performance the service access cover must be installed and fully seated before you power on the system Procedure 1 Place t...

Страница 131: ...s When you place the system in the service position ensure that the cables at the rear of the system do not catch or bind as you pull the system unit out of the rack When you place the system into the...

Страница 132: ...on anything Placing an 5104 22C 9006 22C or 9006 22P system into the operating position To place a system into the operating position complete the steps in this procedure Before you begin When you pla...

Страница 133: ...22C or 9006 22P system To disconnect the power cords from a system complete the steps in this procedure Before you begin Note This system might be equipped with two or more power supplies If the remo...

Страница 134: ...9006 22C or 9006 22P system To connect the power cords to a system complete the steps in this procedure Procedure Using your labels reconnect the power cords to the system unit as shown in Figure 71...

Страница 135: ...Figure 71 Connecting the power cords to the system Common procedures for servicing or installing features in the 5104 22C 9006 22C or 9006 22P system 121...

Страница 136: ...122 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...

Страница 137: ...ct s and or the program s described in this publication at any time without notice Any references in this information to non IBM websites are provided for convenience only and do not in any manner ser...

Страница 138: ...ion technology content successfully Overview The IBM Power Systems servers include the following major accessibility features Keyboard only operation Operations that use a screen reader The IBM Power...

Страница 139: ...eployed for this Software Offering provide you as the customer the ability to collect personally identifiable information from end users via cookies and other technologies you should seek your own leg...

Страница 140: ...by using other than recommended cables and connectors or by unauthorized changes or modifications to this equipment Unauthorized changes or modifications could void the user s authority to operate the...

Страница 141: ...nt explains the Japan Electronics and Information Technology Industries Association JEITA statement for products less than or equal to 20 A per phase This statement explains the JEITA statement for pr...

Страница 142: ...Zustimmung von IBM ver ndert bzw wenn Erweiterungskomponenten von Fremdherstellern ohne Empfehlung von IBM gesteckt eingebaut werden EN 55022 EN 55032 Klasse A Ger te m ssen mit folgendem Warnhinweis...

Страница 143: ...ur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to...

Страница 144: ...Abteilung M456 IBM Allee 1 71139 Ehningen Germany Tel 49 800 225 5426 email halloibm de ibm com VCCI Statement Japan Japan Electronics and Information Technology Industries Association Statement This...

Страница 145: ...hland Einhaltung des Gesetzes ber die elektromagnetische Vertr glichkeit von Ger ten Dieses Produkt entspricht dem Gesetz ber die elektromagnetische Vertr glichkeit von Ger ten EMVG Dies ist die Umset...

Страница 146: ...ess consent of IBM Rights Except as expressly granted in this permission no other permissions licenses or rights are granted either express or implied to the publications or any information data softw...

Страница 147: ......

Страница 148: ...IBM...

Отзывы: