background image

1. If provided, use the four screws and the hex wrench that comes in the hardware kit to secure the front stabilizer bracket to the bottom

front of the rack cabinet so that it is flush with the rack.

2. Whether or not a stabilizer bracket was used, the front of the rack can be bolted to the floor if needed for various local building codes.

Bolt either the front corners of the stabilizer bracket or the front of the rack (if no stabilizer bracket) to the floor surface through the

holes in the lower frame or stabilizer bracket by using the two bolts and washers that you removed from the rack and pallet.

Rear: If needed for various local building codes, bolt the rear of the rack to the floor surface through the holes in the lower rear of the frame

by using the two bolts and washers that you removed from the rack and pallet.
Attaching rack in a suite:
1. 
Where the two racks come together at the top front, align the screw holes.
2. Secure the bracket to the racks with four screws. Do not fully tighten the screws.
3. Once all four screws are aligned and installed, tighten all of the screws.
Repeat this procedure to attach additional expansion racks to the suite.

Содержание 7965-S42

Страница 1: ... PDP turn off the circuit breaker that controls the power to the system unit s or disconnect the customer s DC power source when directed to disconnect power during servicing Connect all devices installed in a rack cabinet to power devices installed in the same rack cabinet Do not plug a power cord from a device installed in one rack cabinet into a power device installed in a different rack cabine...

Страница 2: ...il all possible unsafe conditions are corrected Assume that an electrical safety hazard is present Perform all continuity grounding and power checks specified during the subsystem installation procedures to ensure that the machine meets safety requirements Do not continue with the inspection if any unsafe conditions are present Before you open the device covers unless instructed otherwise in the i...

Страница 3: ...grees When the rack cabinet is in the new location complete the following steps Lower the four leveling pads Install stabilizer brackets on the rack cabinet or in an earthquake environment bolt the rack to the floor If you removed any devices from the rack cabinet repopulate the rack cabinet from the lowest position to the highest position If a long distance relocation is required restore the rack...

Страница 4: ... holes in the lower frame or stabilizer bracket by using the two bolts and washers that you removed from the rack and pallet Rear If needed for various local building codes bolt the rear of the rack to the floor surface through the holes in the lower rear of the frame by using the two bolts and washers that you removed from the rack and pallet Attaching rack in a suite 1 Where the two racks come t...

Страница 5: ...built in extendable outriggers with small floating supplemental casters as motion anti tip features They must all be extended into a latched position before and during cabinet movement or relocation These native built in outriggers must not be removed completely but rather recessed in when finished to ensure they are readily available for future use C050 The equipment shall be installed or service...

Страница 6: ...POWER9 processor and to all associated models Printed in USA Copyright International Business Machines Corporation 2020 US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp GI11 9939 00 1P P N 03GM113 ...

Отзывы: