background image

Chapter 4. Install the appliance into a rack

Many racks are on the market, which means that the assembly procedure might differ slightly. This rail
fits a rack between 27.0" and 36.0" deep.

Prepare for installation

Assemble tools

A #2 Phillips screwdriver and a cage nut tool are needed to install and secure the rails to the appliance.

Wear a set of leather work gloves when racking the appliance. They help to get a grip on the appliance
and avoid injury from any metal edges.

CAUTION:
Do not use of any sort of hammer to secure the rails on the appliance. A hammer might damage the
drives within the chassis and possibly void the warranty.

Choose a setup location

Decide on a suitable location for the rack unit that holds your appliance.

Table 6. Appliance location considerations

Factor

Comments

Restricted access location

Install this appliance in a physically secure, limited access location only, such as a
service closet or data center.

Clean environment

Situate it in a clean, well-ventilated, dust-free area.

Ambient operating temperature If installed in a closed or multi-unit rack assembly, the ambient operating

temperature of the rack environment might be greater than the ambient
temperature of the room. Install the equipment in an environment compatible with
the maximum rated ambient temperature (TMRA) for the appliance.

Sufficient airflow

Mount the equipment into a rack so that the amount of airflow that is needed for
safe operation is not compromised. Leave enough clearance in front of the rack to
open the front door completely (36 inches). Leave about 36 inches of clearance
behind the rack for sufficient airflow and ease in servicing.

Mechanical loading

Mount the equipment into a rack so that a hazardous condition does not arise due
to uneven mechanical loading. Install heavier items into the bottom of the
equipment rack to keep the rack stable. Mount equipment in a rack evenly to
prevent a later hazard.

Circuit overloading

Give consideration to the connection of the equipment to the power supply
circuitry and the effect that any possible overloading of circuits might have on
overcurrent protection and power supply wiring. Appropriate consideration of
equipment nameplate ratings should be used when addressing this concern.
Note:

The maximum current draw is printed on a label on the appliance power

supplies. The system might draw more than 15 Amps at startup (inrush current).

Reliable ground

A reliable ground must be maintained always. To ensure grounding, the rack itself
should be grounded. Particular attention should be given to power supply
connections other than the direct connections to the branch circuit, such as the use
of power strips.

© Copyright IBM Corp. 2016, .

7

Содержание 3401-S00

Страница 1: ...IBM Cloud Object Storage System Version 3 14 2 Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00 IBM...

Страница 2: ...d environmental notices v The information in the IBM Environmental Notices and User Guide provided on a DVD This edition applies to IBM Cloud Object Storage System and is valid until replaced by new e...

Страница 3: ...Specifications and requirements 5 Appliance specifications 5 Requirements 5 System diagram 6 Chapter 4 Install the appliance into a rack 7 Prepare for installation 7 Appliance installation 9 Chapter...

Страница 4: ...iv IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 5: ...nding the outer rail to reach the rear posts of the rack 12 16 Ball bearing shuttle in the middle rail 13 17 If necessary secure the appliance handles to front of rack with screws 13 18 Rear of applia...

Страница 6: ...vi IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 7: ...g temperatures and humidity for the appliance 5 5 Cabling requirements for the appliance 5 6 Appliance location considerations 7 7 Legend for rear panel I O Ports for the appliance 16 8 LAN LED connec...

Страница 8: ...viii IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 9: ...sk drives prior to attempting this installation Only personnel proficient in working with computer hardware and disk drives should attempt to install this appliance v After all appliances have been in...

Страница 10: ...x IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 11: ...and a danger notice Numbers in parentheses refer to message numbers in the IBM Safety Notices publication G229 9054 which is included with your product CAUTION A caution notice indicates the presence...

Страница 12: ...are corrected Assume that an electrical safety hazard is present Perform all continuity grounding and power checks specified during the subsystem installation procedures to ensure that the machine mee...

Страница 13: ...ditions due to uneven mechanical loading always install the heaviest devices in the bottom of the rack cabinet Always install servers and optional devices starting from the bottom of the rack cabinet...

Страница 14: ...to a rack refer to the rating labels located on the equipment in the rack to determine the total power requirement of the supply circuit For sliding drawers Do not pull out or install any drawer or f...

Страница 15: ...asurements made in conformance with ISO 7779 and declared in conformance with ISO 9296 3 B dB abbreviations for bels and decibels respectively 1 B 10 dB 4 Note Government regulations such as those pre...

Страница 16: ...xvi IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 17: ...information For more information on the product or help with troubleshooting contact IBM Support at IBMCloudStorageSupport us ibm com or visit the Directory of worldwide contacts Copyright IBM Corp 20...

Страница 18: ...xviii IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 19: ...Chapter 1 Slicestor 2212 ApplianceManual This manual contains the instructions for installing and maintaining the Slicestor 2212A appliance Copyright IBM Corp 2016 1...

Страница 20: ...2 IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 21: ...ack unit with the retention screws after you ensure that all connections are made v Close the rack s front door and all panels and components on the appliances when not servicing to maintain proper co...

Страница 22: ...components and printed circuit boards PCBs In general the following measures are sufficient to neutralize this difference before contact is made to protect equipment from ESD v Use a grounded wrist s...

Страница 23: ...AC and the frequency is 50 60 Hz Table 3 Space and power requirements for the appliance Model Rack Units W in H in D in Weight lbs W cm H cm D cm Weight kg Power W S2212 2 17 2 3 50 25 5 52 0 43 7 8 9...

Страница 24: ...tem diagram The following figures show the appliance schematics Figure 1 System diagram Figure 2 Drive layout 6 IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S...

Страница 25: ...t compatible with the maximum rated ambient temperature TMRA for the appliance Sufficient airflow Mount the equipment into a rack so that the amount of airflow that is needed for safe operation is not...

Страница 26: ...v In multiple rack installations couple the racks together 2 Check that the rack is stable before extending an appliance from the rack 3 Extend only one appliance at a time Extending two or more simul...

Страница 27: ...he rack rails The appliance package has two rail assemblies in the mounting kit with three sections as shown in the following figure v An inner appliance rail that secures directly to the appliance v...

Страница 28: ...rails 1 Identify the left and right outer rail assemblies 2 Pull the inner rail out of the outer rail until it is fully extended as in the following figure 3 Press the locking tab down to release the...

Страница 29: ...e the inner rail to the appliance with the screws provided 5 Repeat these steps for the opposite inner rail 6 The appliance is now ready to install into the rack as shown in the following figure Insta...

Страница 30: ...rear of the outer rail to the rear of the rack 6 Repeat these steps for the remaining outer rail Install the appliance into a rack 1 Confirm that the inner rails are properly installed on the applian...

Страница 31: ...f both sides simultaneously and push the appliance completely into the rear of the rack 7 If necessary use screws to secure the appliance handles to the front of the rack as shown in the following fig...

Страница 32: ...the left Ethernet port 3 Press the power button that is on the lower left corner of the appliance front panel 4 To ensure that the power is on verify that the power and network link lights are lit and...

Страница 33: ...he front panel Reboots the system Applies or removes power from the power supply to the appliance Powering down the appliance removes the main power but supplies stand by power The appliance must be u...

Страница 34: ...ts are color coded per the PC 99 specification The locations of the various I O ports are shown in the following figure Table 7 Legend for rear panel I O Ports for the appliance 1 1 GbE RJ45 ports 2 7...

Страница 35: ...rdware For a detailed description of IPMI refer to the following Intel documentation https www intel com content www us en servers ipmi ipmi home html Power supplies Each power supply includes one LED...

Страница 36: ...DB 15 The DB 15 video connector can connect a monitor to this port by using a VGA cable The maximum video resolution is 1600 x 1200 at 75 Hz USB 2 0 The USB ports can connect a USB keyboard or the su...

Страница 37: ...v Power supply module v Operating system drive v Data drives The following customer serviceable upgrade units are available v Optical modules SFP QSFP See the Field Replaceable Units Reference Guide...

Страница 38: ...e drive carrier out of the chassis by using the handle Figure 23 Extending the handle for a drive from the chassis 20 IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00...

Страница 39: ...the device as localadmin 2 At the command prompt type poweroff 3 After the appliance is powered off remove the power cord and network cables from the back of the chassis 4 Press the release button on...

Страница 40: ...e drive carrier out of the chassis by using the handle Figure 25 Extending the handle for a drive from the chassis 22 IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00...

Страница 41: ...in the power cable and network cables 9 Power on the appliance Install an operating system on a drive Note To install an operating system OS on a drive you need a USB flash drive a computer running a...

Страница 42: ...ning USB port 10 Restart the machine while pressing F11 to enter the boot menu 11 In the boot menu select USB Key and press Enter The device loads the operating system and the installer appears 12 In...

Страница 43: ...e from the packaging 4 Remove the black plastic protective cap from the optical side of the module 5 Insert the module into the network card until it clicks into place 6 Insert the fiber optic cable i...

Страница 44: ...in the garbage or a public landfill Refer to the IBM Systems Environmental Notices for battery disposal guidelines Battery installation To install an onboard battery follow these steps 1 Identify the...

Страница 45: ...DBCS information contact the IBM Intellectual Property Department in your country or send inquiries in writing to Intellectual Property Licensing Legal and Intellectual Property Law IBM Japan Ltd 19 2...

Страница 46: ...ly All IBM prices shown are IBM s suggested retail prices are current and are subject to change without notice Dealer prices may vary This information is for planning purposes only The information her...

Страница 47: ...torage Insight IBM Cloud Object Storage Manager IBM Cloud Object Storage Slicestor IBM Cloud Object Storage Standard IBM Cloud Object Storage System IBM Cloud Object Storage Vault SecureSlice and Slic...

Страница 48: ...30 IBM Cloud Object Storage System Slicestor 2212 Appliance Manual 3409 S00 3401 S00 3403 S00...

Страница 49: ......

Страница 50: ...IBM Printed in USA...

Отзывы: