background image

Adding a control enclosure to an existing system
If the system was already set up on another control enclosure, do not install it again on this control enclosure. Instead, use the management

GUI to add the control enclosure to the system.
1. Connect the node canisters to the storage area network or to a 25 Gbps (or faster) Ethernet.
2. Configure the zoning on the SAN switches. The correct zoning provides a way for the FC ports to connect to each other.

If the new node canisters use RDMA over Ethernet to communicate with other node canisters, use the service assistant tool or the

satask chnodeip

 command to set the node IP of each node that will be in the system.

3. In the management GUI, select Monitoring > System. On the System - Overview page, select Add Enclosure.

When a new enclosure is cabled correctly to the system, this action automatically displays on the System - Overview page. If this action

does not appear, ensure that the new enclosure is cabled correctly. You can also add a new enclosure by selecting Add Enclosure from

the System Actions menu.

4. Complete the instructions in the Add Enclosure wizard until the control enclosure is added to the system.
5. If two control enclosures are in the system, you must set up a quorum disk or application outside of the system. If the two control

enclosures lose communication with each other, the quorum disk prevents both I/O groups from going offline.

Browser considerations

The management GUI supports the following HTML5-compliant browsers. Certain features must be enabled on the browser. Review the

documentation that is provided with your browser to determine how to enable each item.

Browser

Required enabled features

Mozilla Firefox 80.0.1

Mozilla Firefox Extended Support Release (ESR) 78.2.0

Microsoft Edge 85.0

Google Chrome 85.0

JavaScript

Cookies

Scripts allowed to disable or replace context menus (Mozilla Firefox

only)

In addition, review the following considerations about browser security features and certificates.
• Browser security features might prompt you before the browser accepts the self-signed certificate that the system issues.
• You might need to remove old certificates that are stored in the browser before the browser accepts the request.
• The web browser might display a warning about a potential security risk. It is safe to accept the risk and continue.
• After the technician port physical connection is completed (that is, connected both ends), it can take up to 45 seconds before the port is

fully up and able to process requests. Submitting requests before this interval might result in 404 error responses.

• If the 

http://service

 request causes a 404 error or does not produce a response, you might need to use URL 

https://

192.168.0.1

 to connect to the system.

Installation worksheets

Worksheets can help you plan and install the system. You can also use the worksheets to track important information as you remove and

reinstall parts from the control enclosure during the installation process.

Drive configuration worksheet

The control enclosure supports up to 24 drives, which are installed in drive slots on the front of the enclosure. Non-Volatile Memory Express

(NVMe) drives and Storage Class Memory (SCM) drives can be installed in any drive slot. However, the highest capacity drive must be

installed in the lowest-numbered available drive slot. Drive slots cannot be empty; each slot must contain a drive or drive blank.

Use the following table to record information about the drives in the control enclosure. For each slot number, specify the type and capacity

of the drive or whether a drive blank is installed.

Control Enclosure S/N:

Content

Drive Slots

Type

NVMe / SCM

Capacity

8

Содержание 2076-724

Страница 1: ...ms are available Philips screw driver Box knife Flat blade screw driver optional Three Ethernet cables The control enclosure and the following related parts are included in one box The enclosed invent...

Страница 2: ...a power supply unit on page 3 10 Record the last 6 digits of the serial number on the back of each PSU then set the power supplies aside Item Left PSU Right PSU Serial Number 11 Remove the upper and...

Страница 3: ...t To reduce weight during the installation procedure you must remove and replace the power supply units PSUs in a control enclosure When the system is running the redundant PSUs operate in parallel on...

Страница 4: ...lifting platform or other nearby surface to support the node canister as it is extracted from the control enclosure 4 Hold the node canister by its sides so that it is level and its weight is balanced...

Страница 5: ...nclosure 2 To add a second expansion enclosure chain to the control enclosure complete the following steps a Connect SAS port 3 of the top node canister in the control enclosure to SAS port 1 of the l...

Страница 6: ...system 32 Gbps FC 4 0 3 Supports simultaneous SCSI and NVMeFC connections on the same port 25 Gbps Ethernet iWARP 2 0 3 Supports iSCSI or iSER host attachment 25 Gbps Ethernet RoCE 2 0 3 12 Gbps SAS...

Страница 7: ...erwise continue to Setting up the system on page 7 Setting up the system Each node canister in the control enclosure has a 1 Gbps Ethernet technician port Before you initiate a new system you must con...

Страница 8: ...ort Release ESR 78 2 0 Microsoft Edge 85 0 Google Chrome 85 0 JavaScript Cookies Scripts allowed to disable or replace context menus Mozilla Firefox only In addition review the following consideration...

Страница 9: ...ernet cable from Ethernet port 2 on the node to canister your Ethernet network Port 2 can be used for the management GUI and for iSCSI host attachment Ethernet ports 3 and 4 are for iSCSI attachment o...

Страница 10: ...net mask Gateway VLAN ID FlashSystem 7200 Fibre Channel connections Each node canister supports 4 port 32 Gbps Fibre Channel FC adapters or 4 port 16 Gbps FC adapters Install the FC networking adapter...

Страница 11: ...to the following guidelines Then record the FC port connections in the following table Install the first FC adapter in adapter slot 1 Install the second FC adapter if applicable in adapter slot 2 Ada...

Страница 12: ...c Click the documentation link Environmental notices This information contains all the required environmental notices for IBM Systems products in English and other languages The IBM Systems Environme...

Страница 13: ...atents You can send license inquiries in writing to IBM Director of Licensing IBM Corporation North Castle Drive Armonk NY 10504 1785 U S A For license inquiries regarding double byte character set DB...

Страница 14: ...bute these sample programs in any form without payment to IBM for the purposes of developing using marketing or distributing application programs conforming to the application programming interface fo...

Страница 15: ...ohne Zustimmung von IBM ver ndert bzw wenn Erweiterungskomponenten von Fremdherstellern ohne Empfehlung von IBM gesteckt eingebaut werden EN 55032 Klasse A Ger te m ssen mit folgendem Warnhinweis vers...

Страница 16: ...atement applies to products greater than 20 A per phase three phase Japan Voluntary Control Council for Interference VCCI Notice Korea Notice People s Republic of China Notice Russia Notice Taiwan Not...

Страница 17: ...is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications to this equipment Unauthorized cha...

Отзывы: