10.
After all racks are bolted together, level the racks.
11.
Tighten all four screws.
12.
Snap on the trim pieces that go between the front and back racks.
13.
Snap on the trim piece that goes on top and between the racks.
14.
Install rack filler panels to cover the open areas at the front of the racks. All the gaps in the front of
the rack must also be sealed, including the gaps between equipment. This step ensures that proper
airflow within the rack is maintained.
15.
Connect the cables that go between the racks.
Figure 117. Removing the side panels, Z and J brackets, and installing standoffs and long foam to connect multiple
racks
Figure 118. Location of foam strips (top view)
118
Installing into a rack
Содержание 0551
Страница 1: ...Power Systems Rack rack features and installing systems or expansion units into a rack ...
Страница 2: ......
Страница 3: ...Power Systems Rack rack features and installing systems or expansion units into a rack ...
Страница 8: ...vi Installing into a rack ...
Страница 12: ...2 Installing into a rack ...
Страница 34: ...24 Installing into a rack ...
Страница 118: ...108 Installing into a rack ...
Страница 126: ...116 Installing into a rack ...
Страница 130: ...120 Installing into a rack ...
Страница 136: ...4 Remove the latch bracket from the system unit Figure 124 Removing the retaining screws 126 Installing into a rack ...
Страница 148: ...138 Installing into a rack ...
Страница 164: ...154 Installing into a rack ...
Страница 174: ...3 Close the front rack door 164 Installing into a rack ...
Страница 181: ......
Страница 182: ... Printed in USA ...