Gas Incubation System
5
Operation
The components must be assembled in the following order:
1. Connect all tubing and cables.
2. Apply 1 bar (14.5 psi) to the connected gas tubing.
3. Switch on the Gas Mixer.
Caution!
Not maintaining this order may lead to device malfunction or damage!
The procedure is explained in detail in the following sections.
5.1
Installation and Connection
The Gas Mixer and Humidifying Column should be placed next to the microscope stand. The tubing
of the Heated Tubing Package must reach the Heated Lid and Heated Plate on the microscope stage.
Caution!
Do not place the Gas Mixer and Humidifying Column on the microscope stage! The vibration
might disturb the measurement.
All tubing and cables are connected to the back of the Gas Mixer (Figure
Figure 8 – Overview of the connection of all cables and tubing to the Gas Mixer. In the CO
2
version
the N
2
port is not available.
Instruction Manual
21
Version 2.2 (May 15, 2019)