Instruction Manual for Spiral Mixer KL125PR
www.allaboutbakery.com.au 11
2.
Transport and Installation:
2.1 Transport
The instructions given in this section must be carefully followed when transporting the
machine. This operation may include but is not limited to the following:
•
Storage of the machine
•
Installation of the machine
•
The machine comes supplied in a secure packing crate which needs to be handled with
care to protect the machine.
•
When being transported the machine crate should be secure to the transporting veichcle
using approved tie down straps to avoid the machine tipping over.
•
The machine should not be placed on top of other items during transport.
•
When lifting the machine ensure all persons are at a safe distance.
•
The forklift operator is to hold the appropriate qualifications.
•
Do not climb on or place body under machine crate when it is being lifted from the
ground or transport veichcle.
•
When lifting the machine crate ensure forks are spread to the maximum width of the
crate and the crate is against the cradle of the forklift (Fig2.1).
Fig 2.1
Содержание KL125P
Страница 20: ...Instruction Manual for Spiral Mixer KL125PR www allaboutbakery com au 20 4 4 Spare Parts Drawings ...
Страница 21: ...Instruction Manual for Spiral Mixer KL125PR www allaboutbakery com au 21 ...
Страница 22: ...Instruction Manual for Spiral Mixer KL125PR www allaboutbakery com au 22 4 5 Electrical Wiring Diagrams ...
Страница 23: ...Instruction Manual for Spiral Mixer KL125PR www allaboutbakery com au 23 ...
Страница 24: ...Instruction Manual for Spiral Mixer KL125PR www allaboutbakery com au 24 ...