1.  Connect the boiler to a dedicated (max.)15 Amp 

breaker.

2.  Wire incoming 120 VAC to the black and white wires 

labeled “AC In” in the field wiring box.

3.  Ensure that the boiler is properly bonded (grounded).

4. 

Wire the primary/boiler pump to the yellow and 

white wires labeled “Boiler Pump”.

 

       

Refer to the “Wiring 

Diagrams” section in 

the 

Installation and 

Operating Instructions

 

manual (Appendix) for 

more information.

• 

For multiple-boiler setup, use a secondary loop sensor.

• 

For zone valves or external peripherals such as wi-fi 

thermostats, use external transformers.

Note:

 

If  a load is defined as Reset Heating, the outdoor 

sensor must be used for proper operation. 

Electrical

 continued 

(Section 3.13

)

Water Piping 

(Section 3.11)

• 

Place air separators at the highest point.

• 

Install the pressure relief valve on the outlet piping of 

the boiler in a vertical position. Do not use an isolation 

valve between the boiler and relief  valve.

• 

Support all piping with appropriate piping brackets.

• 

Plumb an appropriately sized expansion tank and make 

up the water station into a fitting on the suction side of 

the circulator. 

• 

Size boiler piping and pump for the BTU output of  the 

boiler.

For non-oxygen barrier piping systems, use a dirt separator 

and/or a side stream filter. Ensure that the system is free of 
iron components, and treat with an inhibitor.

We recommend that you always use a primary/secondary 

piping configuration (see below for a basic configuration).

In the case of  hard water, use distilled or purified water (but 

not reverse-osmosis). Glycol systems must use propylene 

glycol. For large volume systems, the optimum hardness is 

≤2 grains.

Water Chemistry Allowable Limits

Acidity pH

6.6 - 8.5

Chloride

< 125 mg/l

Iron

< 0.3 mg/l

Copper

<0.1 mg/l

Conductivity

<

400μS/cm (at 77°F / 25°C)

Water Hardness

< 7 grains

Load Setup

1. 

On theV-10 Touchscreen controller bottom navigation 

bar, tap the 

Setup

 icon

2.  Select a load and then select the load type.
3.  Accept the defaults, or change any of  the settings.

You can find more substantial settings in 

More

 > 

Advanced Setup

4. 

Tap the 

Save

 button. 

Manual Pump Purge

After the system is pressurized and you have defined loads, 

perform a manual pump purge to ensure air is purged.

On the touchscreen controller, go to 

More

System 

Settings

 > 

Site Settings

>Set 

Manual Pump Purge to 

"

On

">

OK 

Save.

The manual pump purge runs until it is turned off, or when 

there is a call for heat.

Electrical

 

(Section 3.13

)

5. 

Wire the respective load pumps into the TB1 Terminal; 

for example, PV1, 2, 3, 4.

6. 

Wire thermostats or end switch dry contacts to Therm 

24 Vac, and then connect the other wire to Therm 1, 2, 

3, 4 corresponding to the load pump PV1, 2, 3, 4.

7.  For a DHW load, wire either an Aquastat to the 

appropriate Therm. connection or a 10K Ω type II/B 

curve thermister to the DHW sensor connection.

The boiler requires proper grounding, which conforms to all 

electrical codes, ensuring proper flame rectification.

Checklist

Treated water or Polypropylene glycol mixture in the pipes.

Boiler system is pressured and flushed ≥ 8 psi.

All gas connections soap-tested for leaks and now leak free.

Voltage supply to the boiler tested for voltage (nominal 120 

Vac), polarity, and properly grounded.

The boiler requires a dry set of contacts in the Therm 

connections, an external sensor, or External Control signal.

Boiler power turned on.

Use “Setup” in the touchscreen controller to set up the 

required loads. See above for instructions.

Steps followed in the “6.3 Commissioning” section of the 

Installation and Operating Instructions

 

manual.

Completed the Installation & Commissioning Report 

in the 

Installation and Operating Instructions 

manual - 

Combustion Readings recorded.

CO

2

_________

_

 % O

2

 ________ % CO _______ppm

Closely-spaced tees: install tees with straight 

piping (min. pipe diameter lengths as shown), with 

tees maximum 4 pipe diameters apart with no 

restrictions between fittings