INSTALLATION AND OPERATION INSTRUCTIONS
1-18
SL 28-160 MODULATING GAS BOILER
Figure 21: Condensate trap drainage
WARNING
If condensates are to be
discharged into building
drain piping materials that
are subject to corrosion, a
neutralization package must
be used.
CAUTION
When a condensate
neutralization package
is installed, the pH of the
condensate discharge must
be measured on a regular
schedule to ensure the
neutralizing agent is active
and effective.
Figure 20: Condensate trap
disassembly for cleaning
DANGER
The water in the condensate
neutralizer can cause
severe burns to the skin.
Use extreme caution when
servicing the condensate
neutralizer. Wear protective
gloves and eyewear.
Figure 22: Condensate neutralization tank
Содержание SL 28-160
Страница 36: ...INSTALLATION AND OPERATION INSTRUCTIONS 1 32 SL 28 160 MODULATING GAS BOILER THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...INSTALLATION AND OPERATION INSTRUCTIONS 3 6 SL 28 160 MODULATING GAS BOILER THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 69: ...SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE...
Страница 70: ...NOTES...
Страница 71: ...NOTES...