1-19
INSTALLATION
SL 14-115 G3, SL 20-160 G3, SL 30-199 G3 MODULATING GAS BOILERS
SL 14-115 G3, SL 20-160 G3, SL 30-199 G3 MODULATING GAS BOILERS
Figure 26: Condensate trap drainage
Figure 27: Condensate neutralization tank
Figure 25: Condensate trap
disassembly for cleaning
WARNING
If condensates are to be
discharged into building drain
piping materials that are subject
to corrosion, a neutralization
package must be used.
CAUTION
When a condensate
neutralization package
is installed, the pH of the
condensate discharge must be
measured on a regular schedule
to ensure the neutralizing agent
is active and effective.
DANGER
The water in the condensate
neutralizer can cause severe
burns to the skin. Use extreme
caution when servicing the
condensate neutralizer. Wear
protective gloves and eyewear.
Содержание SL 14-115 G3
Страница 71: ...6 3 DIAGRAMS SL 14 115 G3 SL 20 160 G3 SL 30 199 G3 MODULATING GAS BOILERS...
Страница 73: ...6 5 DIAGRAMS SL 14 115 G3 SL 20 160 G3 SL 30 199 G3 MODULATING GAS BOILERS...
Страница 75: ...6 7 DIAGRAMS SL 14 115 G3 SL 20 160 G3 SL 30 199 G3 MODULATING GAS BOILERS...
Страница 81: ...SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE...
Страница 82: ...NOTES...
Страница 83: ...NOTES...