background image

Warnings

Fill the trap with water before firing the boiler to prevent exhaust fumes form

entering the room. Never operate the boiler unless the trap is filled with water.

Ensure all trap fittings are tightened to prevent leakage of flue gas.

Notes

Pipe condensate drain within 1" of a drain or connect to a condensate pump.

Slope the drainage line down to the drain at a pitch of ¼"/Ft, so that the

condensate runs towards the drain.

Checking, cleaning, and filling the condensate trap every 2 months is

important.

120-289R2

Installing the condensate trap (SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, and SL 30-199 G3 boilers)

Отзывы: