Boiler
Component
Maintenance Required
Frequency
Check
replaced. To refill and pressurize your system, we
recommend using a system pressurization appliance such
as an Axiom Industries model SF100 series. Capture the
discharged fluid in a container and recycle it by returning it
to the system feeder appliance. This is particularly
important when your system contains treatment
chemicals or glycol solutions. If the system employs plain
water, the boiler auto fill valve must be turned on in order
to recharge the lost fluid.
7.3 Replacing the fan, gas valve, and burner
This section documents the following maintenance procedures:
Replacing the fan
Replacing the gas valve
Replacing the burner.
76
Section: Service and maintenance
Содержание IBGFSW1-0110
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 52: ...Figure 36 Two pump two load parallel piping concept 48 Section Installation ...
Страница 74: ...Intentionally left empty ...
Страница 100: ...Intentionally left empty ...
Страница 101: ...97 Appendices Wiring diagrams Figure 48 Controller electrical diagram ...
Страница 102: ...Figure 49 Internal wiring diagram 98 Section Appendices ...
Страница 103: ...Figure 50 Sequence of Operation 99 Appendices ...
Страница 106: ...102 Section Appendices ...