3.6 Installation clearances
Warning
Exposed water piping and associated components (relief valves, circulators, etc.,
should not be in contact with combustible materials. Check local codes for required
clearances and / or provide adequate insulation.
VX 110
,
VX 150
,
VX 199
Surface
Minimum distance from
combustible surfaces
Recommended clearance for
installation and service
Front
2"
24"
Rear flue connection
0"
0"
Left side
0"
4" (allow access to water
connections)
Right side
1"
4" (allow access to water
connections)
Top
2"
6"
(for vent connections)
Bottom
0" (clearance for pipes)
12" (for condensate trap and
piping)
Table 3
Clearance distances for boiler mounting sites
A minimum distance below the boiler of 12" is required to provide clearance for the supplied
condensation trap assembly. More clearance will typically be required to accommodate
associated water and gas piping.
3.7 Exhaust venting and air intake
Warning
Venting, condensate drainage, and combustion air systems for all IBC boilers must be
installed in compliance with all applicable codes and with instructions provided in the
respective installation manuals.
Inspect finished vent and air piping thoroughly to ensure all are airtight, and comply with
the instructions provided as well as with the requirements of applicable codes. Failure to
comply will result in severe personal injury or death.
20
Section: Installation
Содержание IBGFSW1-0110
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 52: ...Figure 36 Two pump two load parallel piping concept 48 Section Installation ...
Страница 74: ...Intentionally left empty ...
Страница 100: ...Intentionally left empty ...
Страница 101: ...97 Appendices Wiring diagrams Figure 48 Controller electrical diagram ...
Страница 102: ...Figure 49 Internal wiring diagram 98 Section Appendices ...
Страница 103: ...Figure 50 Sequence of Operation 99 Appendices ...
Страница 106: ...102 Section Appendices ...